Sat Nov 12 01:45:00 2016, TD, Saturday 12 November 6x
|
10.45 DSSSD bias & leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachment 3
|
Fri Nov 11 00:50:00 2016, TD, Friday 11 November 11x
|
10.00 DAQ continues (R33) in no storage mode
DSSSD bias & leakage currents OK - see attachments 1 & 2
|
Thu Nov 10 12:02:24 2016, TD, OH, CG, Thursday 10 November   
|
21.17 DAQ starts (R30)
|
Thu Nov 10 11:57:35 2016, TD, Data directory NP1412 renamed as RIBF123R1
|
Data directory NP1412 renamed as RIBF123R1
|
Thu Nov 10 09:56:20 2016, TD, OH, ML, NP1412 R26 R27 8x
|
start 18.55 10.11.16
stop
AIDA filename R26_0
|
Wed Nov 9 22:16:11 2016, CG, DK, TD, ML, NP1412 R24 R25 34x
|
07.15 R24 started. BRIKEN run 33.
76~78Ni beam setting.
F5 C target out. F7 CH2 in. F11 C out.
|
Wed Nov 9 11:07:14 2016, TD, CG, DK, NP1412 R22 R23 6x
|
DAQ start (R22) failed - merger remained in 'want first sync' state, no output to TapeServer -> soft reset OK
start 20.07
|
Wed Nov 9 09:50:50 2016, TD, NP1412 R20, R21   
|
DAQ start (R20) failed - nnaida5 dropped data transfer #1 link
|
Wed Nov 9 08:47:03 2016, OH, TD, NP1412 R16, R17 and R18 
|
start 17:44
stop 17:49
AIDA filename R16
|
Wed Nov 9 07:16:59 2016, OH, TD, NP1412 R15 6x
|
Run 15
start 16:14
|
Wed Nov 9 02:14:08 2016, OH, TD, NP1412 R14   
|
11.13 Still waiting to get beam back got access so took temp measurement.
T=25.6 DP=0.0 H=18.1
Biases and leakages good. Attachments 1 and 2
|
Wed Nov 9 00:49:03 2016, TD, OH, NP1412 R13 
|
09.50 Run 13 Start
Thick C target (6mm) removed from F11. All variable Al degraders put in place
AIDA settings file: 2016Nov07-23.03.06
|
Tue Nov 8 23:36:56 2016, DK, TD, NP1412 R12 10x
|
Takechi team changes the condition: F5 carbon; F7 empty; F11 carbon
F11 Plastic is 1.1kHz
BRIKEN: 161109_0828_747576Ni_013.dlt |
Tue Nov 8 23:16:15 2016, DK, TD, NP1412 R11 
|
Recovered AIDA after power cycle (unknown cause of crash from the end of R10)
Corresponding run in BRIKEN: 161109_0814_747576Ni_012
|
Tue Nov 8 22:04:21 2016, DK, NP1412 R10 
|
Put the variable Al degraders all back in for safety (was 4.4 mm, now 5.4 mm)
Takechi team switches the condition: F5 empty; F7 CH2; F11 empty
|
Tue Nov 8 21:01:40 2016, CG, DK, NP1412 R9
|
06.02 R9 started with Takechi group C target out and all variable degraders in.
F5 C in. F7 empty. F11 empty.
F11 plastic rate 1.1kHz.
|
Tue Nov 8 18:52:32 2016, CG, DK, NP1412 R7 R8   
|
03.50 74-76Ni beam delivered to F11.
F11 plastic rate ~1kHz.
F5 C target in. F7 empty. F11 C target in.
|
Tue Nov 8 15:10:16 2016, CG, TD, DK, OH, NP1412 R5 R6 
|
00.15 Setting changed to 71,72,73Ni. All variable degraders in.
Will remove while watching rates to settle on degrader setting.
F5 CH2 in. F7 CH2 out. F11 C target in.
|
Tue Nov 8 14:29:34 2016, TD, OH, DK, NP1412 Run 4
|
23:28 Run 4 Start
Thick 6mm C target in beam
|
Tue Nov 8 14:22:16 2016, TD, OH, DK, NP1412 R3
|
11:21 Run 3 Started
Degrader moved upstream. AIDA moved to centre of BRIKEN. Fixed degrader moved upstream from centre of BRIKEN.
11:25 Run 3 Stopped |