Tue Mar 8 12:11:56 2016, CG, AE, RIKEN maintenance progress
|
Quote:
07/03/16 |
Thu Jun 15 07:44:41 2017, OH, RIKEN Cable Inventory
|
| List of the type and quantity of cables we have at RIKEN that are not currently in use. |
Mon Jun 6 15:57:51 2016, TD, ML & YS, R1121 (AIDA) 
|
R1120 stalled shortly after DAQ GO
'unable to connect' etc
|
Mon Jun 6 15:06:22 2016, 1TD, ML & YS, R1119 
|
R1118 ended OK
R1119 DAQ GO, check AIDA SYNCs OK, toggle merge input etc
|
Mon Jun 6 14:24:07 2016, TD, ML & YS, R1118 (AIDA) 10x
|
22.14 R1118 starts
aidas1 has been rebooted
|
Sun Apr 2 03:32:30 2017, DK, OH, Pulser walkthrough
|
11:32 Pulser walkthrough, 90k down to 10k, 10k steps, 1 min per step
R26
|
Tue Jul 5 13:43:02 2016, DK, PV, Pulser Test Run after AIDA is moved 10x
|
Needed to run startx and start the TcLHttpd server on rpi
Following along here: https://elog.ph.ed.ac.uk/AIDA/242
Can now access http://nnrpi1:8015/AIDA/Rly16/ |
Mon Apr 20 09:45:38 2015, CG, TD, Patrick Coleman-Smith, Progress 20th April + RPi procedure + reply ++
|
Quote:
|
Mon Apr 20 09:07:59 2015, CG, TD, Patrick Coleman-Smith, Progress 20th April + RPi procedure + reply
|
Quote:
20/04/15 |
Mon Apr 20 09:38:15 2015, CG, TD, Patrick Coleman-Smith, Progress 20th April + RPi procedure + reply
|
Quote:
|
Mon Apr 20 06:53:24 2015, CG, TD, Progress 20th April + RPi procedure 7x
|
20/04/15
1200: Complete all points on first part of check list, except checking the PSU voltages.
System now in powered and has all network/HDMI cables attached. |
Sun Oct 2 15:03:11 2016, CG, TD, Problems compiling AIDAsort program on aidas1  
|
I have been trying to compile the sort program I have been working on in Edinburgh so I can work on it locally
while at RIKEN.
|
Tue Jun 6 07:44:19 2017, TD, Preamplifier waveforms 25x
|
Preamplifier waveforms sampled by 50MSPS, 14 bit ADC
|
Wed Oct 1 15:41:07 2014, Patrick Coleman-Smith, Power supply filters #3    
|
Measuring the signal at the FEE64 end.
+5v , -6v , +7v, +7v
The two other 'scope channels are connected by FET probes to the FEE64. I now see there is a ground connection.... so i will remove it and re-measure |
Wed Oct 1 13:28:03 2014, Patrick Coleman-Smith, Power supply filters 
|
The new pcb for the power supply filter arrived.
I assembled the components ( after finding the whoops ) and connected it to the bench power supply for nnaida2.
nnaida2 functions just about the same as before but the power supply filter results seem amazing. |
Wed Oct 1 15:15:32 2014, Patrick Coleman-Smith, Power supply filters 14x
|
2.0.L FWHM:14.26
2.15.L ( 270pF ) FWHM : 119.04
(ooops found the 'scope channel was on 20Mhz BW filter ) |
Fri May 13 13:27:50 2016, patrick Coleman-Smith, Power supply changes and blowing fuses !
|
Reading about the power supply changes and the requirement to replace fuses leads me to be concerned.
I think the power being changed is the AC input to the FEE64 power supplies.
Which Fuses are failing ? |
Fri Nov 4 08:10:46 2016, CG, Pb bricks upstream
|
| Stack of Pb bricks upstream of AIDA+BRIKEN to protect from incoming beam. |
Wed Mar 1 16:42:06 2023, Further results from Mezzanine bench tests, PJCS 
|
Carried out some further work on failed mezzanine modules.
Inspected them externally and removed the copper block, internally with a bench microscope.
Found two obvious faults ..... broken components with scrambled pcb tracks. |
Mon Jun 17 03:01:04 2019, CA, TD, OH, PID plot and selected isotope implantation rates
|
PID plot produced from 2 hours of merged data - attachment 1
Z on y-axis, A/Q on x-axis
|