168
|
Tue Mar 8 12:11:56 2016 |
CG, AE | RIKEN maintenance progress |
|
|
|
663
|
Thu Jun 15 07:44:41 2017 |
OH | RIKEN Cable Inventory | List of the type and quantity of cables we
have at RIKEN that are not currently in use. |
|
|
286
|
Mon Jun 6 15:57:51 2016 |
TD, ML & YS | R1121 (AIDA) |
R1120 stalled shortly after DAQ GO
'unable to connect' etc
|
 |
|
285
|
Mon Jun 6 15:06:22 2016 |
1TD, ML & YS | R1119 | R1118 ended OK
R1119 DAQ GO, check AIDA SYNCs OK, toggle |
 |
|
284
|
Mon Jun 6 14:24:07 2016 |
TD, ML & YS | R1118 (AIDA) | 22.14 R1118 starts
aidas1 has been rebooted
|
10x |
|
550
|
Sun Apr 2 03:32:30 2017 |
DK, OH | Pulser walkthrough | 11:32 Pulser walkthrough, 90k down to 10k,
10k steps, 1 min per step
R26
|
|
|
324
|
Tue Jul 5 13:43:02 2016 |
DK, PV | Pulser Test Run after AIDA is moved | Needed to run startx and start the TcLHttpd
server on rpi
Following along here: https://elog.ph.ed.ac.uk/AIDA/242 |
10x |
|
61
|
Mon Apr 20 09:45:38 2015 |
CG, TD, Patrick Coleman-Smith | Progress 20th April + RPi procedure + reply ++ |
|
|
|
59
|
Mon Apr 20 09:07:59 2015 |
CG, TD, Patrick Coleman-Smith | Progress 20th April + RPi procedure + reply |
|
|
|
60
|
Mon Apr 20 09:38:15 2015 |
CG, TD, Patrick Coleman-Smith | Progress 20th April + RPi procedure + reply |
|
|
|
57
|
Mon Apr 20 06:53:24 2015 |
CG, TD | Progress 20th April + RPi procedure | 20/04/15
1200: Complete all points on first
part of check list, except checking the PSU |
7x |
|
369
|
Sun Oct 2 15:03:11 2016 |
CG, TD | Problems compiling AIDAsort program on aidas1 |
I have been trying to compile the sort program
I have been working on in Edinburgh so I |
  |
|
637
|
Tue Jun 6 07:44:19 2017 |
TD | Preamplifier waveforms | Preamplifier waveforms sampled by 50MSPS,
14 bit ADC
|
25x |
|
13
|
Wed Oct 1 15:41:07 2014 |
Patrick Coleman-Smith | Power supply filters #3 | Measuring the signal at the FEE64
end.
+5v , -6v , +7v, +7v |
    |
|
11
|
Wed Oct 1 13:28:03 2014 |
Patrick Coleman-Smith | Power supply filters | The new pcb for the power supply filter
arrived.
I assembled the components ( after |
 |
|
12
|
Wed Oct 1 15:15:32 2014 |
Patrick Coleman-Smith | Power supply filters | 2.0.L FWHM:14.26
2.15.L ( 270pF ) FWHM : 119.04
(ooops found the 'scope channel was |
14x |
|
226
|
Fri May 13 13:27:50 2016 |
patrick Coleman-Smith | Power supply changes and blowing fuses ! | Reading about the power supply changes
and the requirement to replace fuses leads
me to be concerned. |
|
|
422
|
Fri Nov 4 08:10:46 2016 |
CG | Pb bricks upstream | Stack of Pb bricks upstream of AIDA+BRIKEN
to protect from incoming beam. |
|
|
865
|
Wed Mar 1 16:42:06 2023 |
Further results from Mezzanine bench tests | PJCS | Carried out some further work on failed
mezzanine modules.
Inspected them externally and removed |
 |
|
849
|
Mon Jun 17 03:01:04 2019 |
CA, TD, OH | PID plot and selected isotope implantation rates | PID plot produced from 2 hours of merged data
- attachment 1
|
|