AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 25 of 46  ELOG logo
  ID Date Author Subjectdown Text Attachments
  168   Tue Mar 8 12:11:56 2016 CG, AERIKEN maintenance progress


   
        
            
  
  663   Thu Jun 15 07:44:41 2017 OHRIKEN Cable InventoryList of the type and quantity of cables we
have at RIKEN that are not currently in use.
 170615_Cable_Inventory.xlsx 
  286   Mon Jun 6 15:57:51 2016 TD, ML & YSR1121 (AIDA)
R1120 stalled shortly after DAQ GO
      'unable to connect' etc
 43.png44.png 
  285   Mon Jun 6 15:06:22 2016 1TD, ML & YSR1119R1118 ended OK

R1119 DAQ GO, check AIDA SYNCs OK, toggle
 41.png42.png 
  284   Mon Jun 6 14:24:07 2016 TD, ML & YSR1118 (AIDA)22.14 R1118 starts

      aidas1 has been rebooted
 10x 
  550   Sun Apr 2 03:32:30 2017 DK, OHPulser walkthrough11:32 Pulser walkthrough, 90k down to 10k,
10k steps, 1 min per step
      R26
 bias_2_a.png 
  324   Tue Jul 5 13:43:02 2016 DK, PVPulser Test Run after AIDA is movedNeeded to run startx and start the TcLHttpd
server on rpi
Following along here: https://elog.ph.ed.ac.uk/AIDA/242
 10x 
  61   Mon Apr 20 09:45:38 2015 CG, TD, Patrick Coleman-SmithProgress 20th April + RPi procedure + reply ++

    

       
            
  
  59   Mon Apr 20 09:07:59 2015 CG, TD, Patrick Coleman-SmithProgress 20th April + RPi procedure + reply

    

       
            
  
  60   Mon Apr 20 09:38:15 2015 CG, TD, Patrick Coleman-SmithProgress 20th April + RPi procedure + reply
  
  57   Mon Apr 20 06:53:24 2015 CG, TDProgress 20th April + RPi procedure20/04/15
1200: Complete all points on first
part of check list, except checking the PSU
 7x 
  369   Sun Oct 2 15:03:11 2016 CG, TDProblems compiling AIDAsort program on aidas1
I have been trying to compile the sort program
I have been working on in Edinburgh so I
 make.logmake.logEditransfer.h 
  637   Tue Jun 6 07:44:19 2017 TDPreamplifier waveformsPreamplifier waveforms sampled by 50MSPS,
14 bit ADC
 25x 
  13   Wed Oct 1 15:41:07 2014 Patrick Coleman-SmithPower supply filters #3 Measuring the signal at the FEE64
end.
+5v , -6v , +7v, +7v 
 RTOScreenshot_2014-10-01_17_152532.pngRTOScreenshot_2014-10-01_18_152907.pngRTOScreenshot_2014-10-01_19_152935.pngRTOScreenshot_2014-10-01_20_153021.pngRTOScreenshot_2014-10-01_21_153113.png 
  11   Wed Oct 1 13:28:03 2014 Patrick Coleman-SmithPower supply filtersThe new pcb for the power supply filter
arrived.
I assembled the components ( after
 RTOScreenshot_2014-10-01_1_121051.pngRTOScreenshot_2014-10-01_0_121012.png 
  12   Wed Oct 1 15:15:32 2014 Patrick Coleman-SmithPower supply filters2.0.L FWHM:14.26
2.15.L ( 270pF )  FWHM : 119.04
(ooops found the 'scope channel was
 14x 
  226   Fri May 13 13:27:50 2016 patrick Coleman-SmithPower supply changes and blowing fuses ! Reading about the power supply changes
and the requirement to replace fuses leads
me to be concerned.
  
  422   Fri Nov 4 08:10:46 2016 CGPb bricks upstreamStack of Pb bricks upstream of AIDA+BRIKEN
to protect from incoming beam.
  
  865   Wed Mar 1 16:42:06 2023 Further results from Mezzanine bench testsPJCSCarried out some further work on failed
mezzanine modules.

Inspected them externally and removed
 mezz_cap_gone_resized.jpgmezz_resistors_resized.jpg 
  849   Mon Jun 17 03:01:04 2019 CA, TD, OHPID plot and selected isotope implantation ratesPID plot produced from 2 hours of merged data
- attachment 1
 2hrPID.pdf 
ELOG V3.1.3-7933898