AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 27 of 46  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
    Reply  Wed May 24 15:58:53 2017, Patrick Coleman-Smith, Examination of Console Logs -- and a couple of reminders 
Entry  Wed Sep 10 09:27:43 2014, Patrick, Elog appreciation 
Entry  Mon Sep 15 13:51:28 2014, Patrick, Odd spectra from running nnaida2 for 3 hours nnaida2_3hours
Entry  Wed Jan 14 15:29:01 2015, Patrick, Filtered switch mode PSU performance 
Entry  Thu May 5 14:44:48 2016, Patrick, Trigger selection explanations Explanations_for_the_Trigger_selections_in_AIDA.pdf
Entry  Mon May 9 16:46:30 2016, Patrick, Update for FEE64 VHDL and Correlation browser windows FEE_GF_Feb16_16.binAida_js_tml_May16.zip
Entry  Wed May 11 11:24:09 2016, Patrick, Correlation Controls 
Entry  Thu May 12 15:50:48 2016, Patrick, System Checks and firmware update FEE_GF_Feb16_17.binCheck_12May16.zip
Entry  Mon May 22 09:12:56 2017, Patrick, Consoles reporting Options not available.... defaults operational ? 
Entry  Mon May 22 10:21:29 2017, Patrick, Console mapping to FEE64 please 
Entry  Thu Dec 1 08:13:06 2016, PV,Liu, TD, Implantation profile in AIDA , after changing the ZDS setting to center at 41Al, AIDA 43_ 33 to 43 36.png24.png50.png
Entry  Thu Dec 1 10:58:54 2016, PV, TD, Liu, Implantation profile in AIDA , after switch back to the previous ZDS setting (AIDA 43_63 to 43_71, bigrips run 1129) 51.png45.png31.png
Entry  Wed Nov 30 06:31:04 2016, PV, TD, RCF, Liu, Implantation profile in AIDA R39 2 to 9, after changing degrader at 13:30 29.png22.png12.png
Entry  Wed Nov 30 08:41:37 2016, PV, TD, RCF, Liu, Implantation profile in AIDA R39 37 to 46, after changing degrader at 16:23 01.png52.png44.png
Entry  Mon Nov 28 13:12:31 2016, PV, AE, Liu, Implantation profile in AIDA with 8mm Al replacing 3 mm Pb 10.pngimp_dssd_106x.pngimp_pid_106x.pngimp_xy_106x.pngpid_r106x.png
Entry  Sun May 28 09:55:11 2017, PV, ADC offset value from pulser walkthrough run May2017/R28 R29 ADC_offset_R2829_BRIKENMay2017.xlsADC_offset_R2829_BRIKENMay2017.txtcal_histo.pngcal_histo.root
Entry  Fri Jun 9 16:22:54 2017, PV, Saturday 10 June 00:00-08:00 28x
Entry  Sun Jun 11 08:23:23 2017, PV, Sunday 11 June 16:00-00:00  21x
Entry  Tue Jun 6 00:57:49 2017, PJW, TD, Tuesday 6 June 08.00-16.00 16x
Entry  Mon Feb 22 15:19:52 2016, PJCS, T9 System changed to version 8 LED_window.png
ELOG V3.1.3-7933898