| ID |
Date |
Author |
Subject |
Text |
 |
|
158
|
Mon Feb 22 16:47:28 2016 |
PJCS | Version 8 in nnaida2 outputting and merging two streams | nnaida2 , the bare test FEE64 in T9, is
successfully running with two streams connected
to nndhcp177 ( a Linux64 computer ) |
|
|
162
|
Wed Feb 24 14:53:41 2016 |
PJCS | First data with two streams merged from one FEE64 | nnaida2 running Version 8 Firmware and
data acquisition software outputting both
and ASIC data stream and a Waveform data |
|
|
163
|
Wed Feb 24 15:46:11 2016 |
PJCS | OR64 - OR of all the ASIC discriminator channels after application of a mask | Firmware version8 number 8 has an OR64
added which can be routed, using the Local
control, to the Trigger output and hence |
|
|
164
|
Wed Feb 24 16:13:24 2016 |
PJCS | First data with two streams merged from one FEE64 |
|
|
|
165
|
Thu Feb 25 12:47:43 2016 |
PJCS | First data with two streams merged from one FEE64 |
My GREAT data analyser program reports that
the 'fail' bit is set ?
|
|
|
166
|
Wed Mar 2 11:59:48 2016 |
PJCS | First data with two streams merged from one FEE64 | The Fail bit is used to indicate The Timing
Vernier word.
I'll post a seperate Elog entry to explain |
|
|
178
|
Mon Mar 14 11:27:47 2016 |
PJCS | ASIC_clock synchronisation across the system | During 'SETUP' the ASIC readout clock (
500KHz ) is synchronised to the SYNC pulse
in V8.10 and later versions of the VHDL. |
|
|
181
|
Mon Mar 21 14:37:41 2016 |
PJCS | Vernier Timing document for comment | Here is a document about the FEE64 waveform
Vernier Timing.
Please comment/criticise/offer advice. |
|
|
183
|
Thu Apr 14 13:56:17 2016 |
PJCS | Updating the FEE64 firmware. | To update the FEE64 firmware:-
Power-up the FEE64 modules
that you wish to update.
Identify |
|
|
867
|
Wed Apr 12 12:32:13 2023 |
PJCS | ASIC power short problem | I have taken videos with an Infrared camera
of the power being supplied to one isolated
ASIC on a mezzanine. |
 |
|
740
|
Wed Aug 22 13:50:30 2018 |
OH, TD, Reply by PCS | AIDA GSI Setup Noise Tests | > Currently seems to be a problem with the
memory check in the system wide checks that
produces the message shown
|
|
|
629
|
Sun Jun 4 00:06:18 2017 |
OH, TD, PJW | Sunday 4 June 08.00-16.00 | 08:00 DAQ found stopped at around 04:49 -
Attachment 1
Time obtained from last file written |
32x |
|
537
|
Mon Mar 27 03:29:05 2017 |
OH, TD, DK, CG | Monday 27 March | 11:28 Biases and leakages okm (see attachment
1)
|
15x |
|
546
|
Wed Mar 29 18:02:12 2017 |
OH, TD, DK, CG | Thursday 30th March | 02:02 Recovered DAQ from crash. Merger became
clogged and the system required a full restart.
Raspberry pi also
|
31x |
|
838
|
Wed Jun 12 01:54:04 2019 |
OH, TD, CG, CB, CA | Wednesday 12 June | 09:54 DAQ Continues ok with merger running
at ~ 560k data items per second
|
11x |
|
862
|
Tue Feb 9 11:44:21 2021 |
OH, TD, CA, LS | 9th Feb GSI Dry run | Database file - 2019Dec19-16.19.51
Current threshold at 0x64
|
16x |
|
770
|
Thu Nov 8 23:35:50 2018 |
OH, TD, CA, CB | Friday 9 November | 08:36 DAQ still running
Not writing data to disk
|
23x |
|
806
|
Sun May 19 02:28:07 2019 |
OH, TD, CA | Sunday 19 May | 10:28 DAQ Continues ok
Alpha run continues - Currently on
file R7_5
|
11x |
|
431
|
Tue Nov 8 00:52:59 2016 |
OH, TD | FEE Settings and Options files | Used a program to sort through the settings
files located in /MIDAS/DB/EXPERIMENTS/AIDA/Settings_FIle_Name/nnaider1,2,3...
and /MIDAS/DB/EXPERIMENTS/AIDA/Options.
|
|
|
443
|
Wed Nov 9 02:14:08 2016 |
OH, TD | NP1412 R14 | 11.13 Still waiting to get beam back got access
so took temp measurement.
T=25.6 DP=0.0 H=18.1
|
   |