AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 28 of 46  ELOG logo
  ID Date Authordown Subject Text Attachments
  158   Mon Feb 22 16:47:28 2016 PJCSVersion 8 in nnaida2 outputting and merging two streamsnnaida2 , the bare test FEE64 in T9, is
successfully running with two streams connected
to nndhcp177 ( a Linux64 computer )
  
  162   Wed Feb 24 14:53:41 2016 PJCSFirst data with two streams merged from one FEE64nnaida2 running Version 8 Firmware and
data acquisition software outputting both
and ASIC data stream and a Waveform data
 R1_0.gz 
  163   Wed Feb 24 15:46:11 2016 PJCSOR64 - OR of all the ASIC discriminator channels after application of a maskFirmware version8 number 8 has an OR64
added which can be routed, using the Local
control, to the Trigger output and hence
 IMG_0290.JPG 
  164   Wed Feb 24 16:13:24 2016 PJCSFirst data with two streams merged from one FEE64


   
        
            
  
  165   Thu Feb 25 12:47:43 2016 PJCSFirst data with two streams merged from one FEE64
My GREAT data analyser program reports that
the 'fail' bit is set ?
 analyser.f 
  166   Wed Mar 2 11:59:48 2016 PJCSFirst data with two streams merged from one FEE64The Fail bit is used to indicate The Timing
Vernier  word.
I'll post a seperate Elog entry to explain
  
  178   Mon Mar 14 11:27:47 2016 PJCSASIC_clock synchronisation across the systemDuring 'SETUP' the ASIC readout clock (
500KHz ) is synchronised to the SYNC pulse
in V8.10 and later versions of the VHDL.
 R44_0.zip.zip 
  181   Mon Mar 21 14:37:41 2016 PJCSVernier Timing document for commentHere is a document about the FEE64 waveform
Vernier Timing.
Please comment/criticise/offer advice.
 Considering_the_Vernier_Timing_unit_in_the_FEE64.pdf 
  183   Thu Apr 14 13:56:17 2016 PJCSUpdating the FEE64 firmware.To update the FEE64 firmware:-

    Power-up the FEE64 modules
that you wish to update.
    Identify
 FEE_GF_Feb16_15.bin 
  867   Wed Apr 12 12:32:13 2023 PJCSASIC power short problemI have taken videos with an Infrared camera
of the power being supplied to one isolated
ASIC on a mezzanine.
 Mezzanine_Under_test_Wider_view_resized.jpgMezzanine_Under_test_resized.jpg 
  740   Wed Aug 22 13:50:30 2018 OH, TD, Reply by PCSAIDA GSI Setup Noise Tests> Currently seems to be a problem with the
memory check in the system wide checks that
produces the message shown
  
  629   Sun Jun 4 00:06:18 2017 OH, TD, PJWSunday 4 June 08.00-16.0008:00 DAQ found stopped at around 04:49 -
Attachment 1
      Time obtained from last file written
 32x 
  537   Mon Mar 27 03:29:05 2017 OH, TD, DK, CGMonday 27 March11:28 Biases and leakages okm (see attachment
1)
 15x 
  546   Wed Mar 29 18:02:12 2017 OH, TD, DK, CGThursday 30th March02:02 Recovered DAQ from crash. Merger became
clogged and the system required a full restart.
Raspberry pi also
 31x 
  838   Wed Jun 12 01:54:04 2019 OH, TD, CG, CB, CAWednesday 12 June09:54 DAQ Continues ok with merger running
at ~ 560k data items per second
 11x 
  862   Tue Feb 9 11:44:21 2021 OH, TD, CA, LS9th Feb GSI Dry runDatabase file - 2019Dec19-16.19.51
Current threshold at 0x64
 16x 
  770   Thu Nov 8 23:35:50 2018 OH, TD, CA, CBFriday 9 November08:36 DAQ still running
      Not writing data to disk
 23x 
  806   Sun May 19 02:28:07 2019 OH, TD, CASunday 19 May10:28 DAQ Continues ok
      Alpha run continues - Currently on
file R7_5
 11x 
  431   Tue Nov 8 00:52:59 2016 OH, TDFEE Settings and Options filesUsed a program to sort through the settings
files located in /MIDAS/DB/EXPERIMENTS/AIDA/Settings_FIle_Name/nnaider1,2,3...
and /MIDAS/DB/EXPERIMENTS/AIDA/Options.
 FEE_Settings.xlsx 
  443   Wed Nov 9 02:14:08 2016 OH, TDNP1412 R1411.13 Still waiting to get beam back got access
so took temp measurement.
      T=25.6 DP=0.0 H=18.1
 bias1.pngbias2.pngR14bias1.pngR14bias2.png 
ELOG V3.1.3-7933898