Entry  Mon Aug 22 10:35:31 2016, TD, Monday 20 August 17x
11.00 Restore power to AIDA following Saturday's shutdoen in preparation for the planned maintenance
      outage on Sunday.
    Reply  Mon Aug 22 13:37:30 2016, TD, Monday 20 August 
> 11.00 Restore power to AIDA following Saturday's shutdoen in preparation for the planned maintenance
>       outage on Sunday.
Entry  Mon Aug 22 11:45:07 2016, Patrick Coleman-Smith, Software updated in Aida 
Logged into aidas1, installed AidaExecV8 with a test of the time difference between SYNC data items. Failure to be 0x40000 clocks will cause a statistic
to be incremented. "SYNC Time Warp"

Installed updated versions of /MIDAS/TclHttpd/Html/AIDA/RunControl/sys.tcl and /MIDAS/TclHttpd/Html/AIDA/RunControl/implementation.tcl
Entry  Mon Aug 22 10:35:06 2016, TD, Saturday 20 August 
 
Entry  Fri Aug 19 07:42:22 2016, TD, PV, Friday 19 August 6x

14.00 Both AIDA NIM bins U/S 
      Upper NIM bin - BNC PB-4, Ortec 433, 2x CAEN N1419, 1x CAEN N1419B - ac mains fuse 100V/8A/slow? blowing
    Reply  Fri Aug 19 09:43:27 2016, TD, VP, reply PJCS, Friday 19 August 

> 14.00 Both AIDA NIM bins U/S 
>       Upper NIM bin - BNC PB-4, Ortec 433, 2x CAEN N1419, 1x CAEN N1419B - ac mains fuse 100V/8A/slow? blowing
       Reply  Fri Aug 19 11:07:44 2016, TD, VP, reply PJCS, Friday 19 August 7.png
> > 
> > 14.00 Both AIDA NIM bins U/S 
> >       Upper NIM bin - BNC PB-4, Ortec 433, 2x CAEN N1419, 1x CAEN N1419B - ac mains fuse 100V/8A/slow? blowing
          Reply  Fri Aug 19 12:41:43 2016, TD, VP, reply PJCS, Friday 19 August 
> > > 
> > > 14.00 Both AIDA NIM bins U/S 
> > >       Upper NIM bin - BNC PB-4, Ortec 433, 2x CAEN N1419, 1x CAEN N1419B - ac mains fuse 100V/8A/slow? blowing
Entry  Wed Aug 17 14:44:52 2016, Patrick Coleman-Smith, [HowTo] start acquisition using the new "Start ASIC Readout" button RunControl_portion.png
Due to sometimes operating with very noisy systems, both at Daresbury and RIKEN, I have installed a change to the startup of the system.
The Runcontrol GO button now only starts the output of SYNC pulses. A further button labelled "Start ASIC Readout" ( see attached photo
) needs to be pressed to start the ASIC ADC, Discriminator and Correlation readout.
Entry  Wed Aug 17 14:10:05 2016, Patrick Coleman-Smith, Linux Memory problem solutions for FEE64 
The problem indicated by "page allocation failure" and the kernal subsequently "killing" the AidaExecV8 process is due ( it appears
) to memory availability.
Solution 1:- Reduce the amount of memory used for histogramming. That would be by disabling the .V histograms or changing the size of the .H and/or
Entry  Mon Aug 15 09:55:08 2016, Patrick Coleman-Smith, Found a candidate for DAQ failure. 
The problem :-
The DAQ stops working and can only be fixed by a reboot of the FEE64s.
The Candidate:-
Entry  Mon Aug 1 11:30:07 2016, Patrick Coleman-Smith, First time remotely power up HV in RIKEN from Daresbury 
Logged into aidas1 and opened the nnrpi1 relay control window ... powered up the FEE64s.
seperatly connected to ribfdaq and opened a firefox to aidas1:8015.
By the time the firefox had appeared on my desktop the FEE64s had started up.
Entry  Sun Jul 31 09:38:07 2016, TD, Analysis of AIDA75_1 AIDA75_1.txtUntitled.png200.png400.png
Attachment 2 - analysis from *end* of file AIDA75_1

2D spectrum - FEE # versus timestamp (100us/channel)
Entry  Thu Jul 28 11:35:58 2016, Patrick Coleman-Smith, [HowTo] Apply Thermal paste to FPGA Process_for_applying_thermal_paste_to_the_FPGA_in_FEE64.pdf
 
Entry  Mon Jul 25 08:38:56 2016, TD, Analysis of R4 R4.out
 
Entry  Wed Jul 20 18:41:55 2016, DK, AIDA topped up on water 
 I actually topped off the chiller with water tonight as I am returning to Scotland (and then off to CERN) within hours.
I added 4 liters on around July 5th, to move the marker from a little under the halfway mark to over the halfway mark.  After 2.x weeks, it
was still sitting a bit shy of under the halfway mark.  This means that in a humid and hot Japanese month like July, AIDA doesn't evaporate more than
Entry  Mon Jul 18 12:00:16 2016, Patrick Coleman-Smith, Report of remote operation of Aida at RIKEN 11/7 to 14/7 







Normal
0




false
false
false
Entry  Thu Jul 14 16:55:32 2016, Patrick Coleman-Smith, Changes to AIDA software 
An updated copy of the merger has been downloaded ( merger64.AD ) with a copy of /MIDAS/Merger/AIDA/Startup.
These two enable the output of all of the SYNC data items to the TapeServer.
 
Entry  Fri Jul 8 18:54:47 2016, TD, Analysis July2016/R1 data R1_0.outR1_114.outanalyser2.fUntitled.png

See https://elog.ph.ed.ac.uk/AIDA/324
Entry  Thu Jul 7 17:16:11 2016, Patrick Coleman-Smith, Install & Run new firmware with diagnostics for the SYNC 
Connected to aidas from daresbury.
Started Firefox with windows for Rpi, Merge, Runcontrol.
Power on FEEs from Pi.
Entry  Tue Jul 5 13:43:02 2016, DK, PV, Pulser Test Run after AIDA is moved 10x
Needed to run startx and start the TcLHttpd server on rpi
Following along here: https://elog.ph.ed.ac.uk/AIDA/242
Can now access http://nnrpi1:8015/AIDA/Rly16/
Entry  Tue Jul 5 10:26:11 2016, DK, AIDA relocation pictures 6x
Here are some pictures after AIDA's relocation.
In principle, it can stay here, but probably after the tests we will push it further against the wall.  However, power and ethernet cabling
cannot reach that far.
Entry  Tue Jul 5 09:39:27 2016, DK, Rly16 is not online usb_serial.JPG
AIDA was relocated, and now I want to power it on to do some tests.  However, I cannot get the Rly16 service running.
Specifically, after powering up the entire AIDA system, on aidas1 PC, I cannot connect to the raspberry pi (nnrpi1) via a web browser
Entry  Sat Jun 18 14:35:31 2016, TD, AIDA photographs - June 2016 - 4 IMG_5854.JPGIMG_5855.JPGIMG_5856.JPGIMG_5857.JPGIMG_5863.JPG
 