AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 2 of 44  ELOG logo
Entry  Wed Nov 22 14:52:43 2023, NH, AIDA Pulser Calibration Screenshot_from_2023-11-22_15-18-08.pngScreenshot_from_2023-11-22_15-31-43.pngScreenshot_from_2023-11-22_15-21-34.pngScreenshot_from_2023-11-22_16-05-33.png
Connect pulser to all p+n FEEs

Turn on pulser, 100 Hz (attachment 3 for settings), rates OK (attachment 1)
Entry  Tue Nov 21 13:56:59 2023, NH, CC, HA, MP, AM, VP, Tuesday 21 November 8x
Connect the BB7 on top of the snout to the former aida05 (FEE above aida01)
Also remove copper busbar that is unused
Entry  Sat Nov 18 02:28:26 2023, TD, NH, JB, Saturday 18 November 10x
03.20 c. 3k per spill 13N beam to S4
      Observe scatter of events at all energies for LEC
Entry  Fri Nov 17 15:53:03 2023, TD, JB, JG, Friday 17 November contd. 25x

AIDA ASIC settuings 2023Nov16-18.55.20
     low comparator p+n FEE64s 0xa, n+n 0xf
Entry  Fri Nov 17 09:19:41 2023, TD, CC, VP, AIDA test 17/11/2023 46x
We restarted AIDA (a10277ttachment 6) this morning and checked rates (attachments 3/4) and waveforms (attachments 1/2). Temperatures are shown in attachment
5.
It seems consistent with what was observed yesterday.
Entry  Thu Nov 16 17:43:25 2023, TD, JB, CC, VP, AIDA test 16/11/2023 cont. Screenshot_from_2023-11-16_16-37-22.pngScreenshot_from_2023-11-16_16-36-25.pngScreenshot_from_2023-11-16_16-35-51.pngScreenshot_from_2023-11-16_16-35-30.png
Screenshot uploads as I hit the 50 image upload limit.
Entry  Thu Nov 16 09:09:58 2023, TD, JB, CC, VP, AIDA tests 16/11/2023 48x
Viewing AIDA status on Thursday morning 16/11/2023. 

Rates and histograms are observed with bPlast HV connected but not powered. The LIMO cables to the booster cards of bPlast are connected and the TAMEX
Entry  Wed Nov 15 10:37:00 2023, TD, Wednesday 15 November 27x

11.36 Water flow, pressure & temperature ( 19 deg C ) OK
Entry  Tue Nov 14 17:19:11 2023, TD, TapeServer, Merger, NetVar etc status Screenshot_from_2023-11-14_18-18-51.pngScreenshot_from_2023-11-14_18-18-45.pngScreenshot_from_2023-11-14_18-18-34.pngScreenshot_from_2023-11-14_18-18-29.png
 
Entry  Tue Nov 14 17:08:49 2023, TD, Report - high - unable to change ASIC settings directory in Options  Screenshot_from_2023-11-14_18-07-27.pngScreenshot_from_2023-11-14_18-07-56.png

Attempting to change the text string specifying the ASIC settings directory ( 2023Nov14-15.25.24 ) in Options produces an error - see attachments 1 & 2
Entry  Tue Nov 14 16:52:54 2023, TD, Tuesday 14 November  Screenshot_from_2023-11-14_15-37-10.pngScreenshot_from_2023-11-14_15-37-41.png

15.06 Quick test of AIDA 24cm x 8cm 'triple' DSSSD before dismounting to install 1x bPlast detector downstream of the DSSSD
Entry  Mon Nov 6 17:30:44 2023, NH, Aida Alpha Analysis alpha_hit.pngalpha_energy.pngalpha_energy_xy.pngalpha_strip_v_energy.png
Analysis of tape folder /TapeData/BG18OCT23

Using Go4 https://github.com/cej25/DESPEC_NOV23
Entry  Wed Oct 25 12:42:18 2023, CC, AIDA test Screenshot_from_2023-10-25_13-42-54.pngScreenshot_from_2023-10-25_13-43-10.pngScreenshot_from_2023-10-25_13-44-00.pngScreenshot_from_2023-10-25_13-43-46.png
Started AIDA at 1:41 pm, writing to disk: file BG18OCT2/R6, stopped at  17:26
pict1: HV supply
pict2: temperature
Entry  Tue Oct 24 10:54:14 2023, at 19:14NH, CC, AIDA test Screenshot_from_2023-10-24_11-54-48.pngScreenshot_from_2023-10-24_11-55-08.pngScreenshot_from_2023-10-24_11-55-46.pngScreenshot_from_2023-10-24_11-55-33.png
Started AIDA at 11:54am, writing to disk: file BG18OCT2/R5, stopped at 19:14

pict1: HV supply
Entry  Mon Oct 23 14:08:06 2023, NH, CC, AIDA test Screenshot_from_2023-10-23_15-08-59.pngScreenshot_from_2023-10-23_15-09-16.pngScreenshot_from_2023-10-23_15-10-01.pngScreenshot_from_2023-10-23_15-09-36.pngScreenshot_from_2023-10-23_18-20-13.png
Started AIDA at 3:05pm, writing to disk: file BG18OCT2/R4, stopped 18.30

pict1: HV supply
Entry  Mon Oct 23 10:52:06 2023, NH, CC, AIDA test Screenshot_from_2023-10-23_11-53-28.pngScreenshot_from_2023-10-23_11-53-59.pngScreenshot_from_2023-10-23_11-54-43.pngScreenshot_from_2023-10-23_11-54-54.png
Started AIDA at 11:50, writing to disk: file BG18OCT2/R3, stopped around 3 pm

pict1: HV supply
Entry  Thu Oct 19 10:39:20 2023, NH, Thursday 19 October 10x
Water Temp: 20 C - Flow felt on pipe
AIDA interlock OVERRIDE 
Entry  Wed Oct 18 17:18:57 2023, TD, Wednesday 18 October 8x
 
Entry  Thu Oct 12 16:40:21 2023, TD, background alpha 13x

start 14.55
Entry  Thu Oct 12 13:02:50 2023, TD, Thursday 12 October contd. 50x

      ASIC settings 2021Apr29-13-16-00
      slow comparator 0xa ( all p+n junction FEE64s ) and 0xf ( all n+n Ohmic FEE64s )
ELOG V3.1.4-unknown