Sat Jun 18 14:35:31 2016, TD, AIDA photographs - June 2016 - 4    
|
|
Thu Jun 16 08:18:50 2016, TD, AIDA photographs - May 2016 
|
|
Thu Jun 16 08:12:51 2016, TD, AIDA photographs - June 2016 - 3  
|
|
Thu Jun 16 08:07:37 2016, TD, AIDA photographs - June 2016 - 2   
|
|
Thu Jun 16 08:00:10 2016, TD, AIDA photographs - June 2016 - 1   
|
|
Thu Jun 16 03:40:43 2016, TD, Thursday 16 June 2016    
|
10.40 DAQ stalled AIDA75_30 c. 01.36
SYNC errors since baseline (start of AIDA75) - attachment 1
|
Wed Jun 15 01:43:47 2016, TD, Wednesday 15 June 2016 6x
|
09.19 DAQ stalled AIDA72_87 c. 01.25
SYNC errors since baseline (start of AIDA72) - attachment 1
|
Tue Jun 14 01:42:56 2016, TD, Tuesday 14 June 2016 7x
|
09.35 AIDA67 stalled AIDA67_43 (c. 01.27)
DAQ stopped and file closed 09.32
|
Mon Jun 13 03:45:15 2016, TD, Monday 13 June 2016 20x
|
10.20 AIDA62 found stalled - no SYNCs, no data transfer
All FEE64s pass all system-wide tests *except* nnaida3 & nnaida8 which fail ADC calibration
Data files indicate DAQ stopped c. 06.56
|
Sun Jun 12 19:19:22 2016, DK, Machine Time End
|
3:13 operators call to tell us the machine time is over. No more EURICA!
AIDA62_23 ought to be the last file with legitimate physics data
We will leave the DAQ running overnight as a b/g run. |
Sun Jun 12 03:05:37 2016, TD, AE, CG, MA, Sunday 12 June 2016 part 2 11x
|
BigRIPS switched from 60Ti to 64V
|
Sat Jun 11 17:24:11 2016, DK, TD, Sunday 12 June 2016 14x
|
Runs 41 and 42 are quite short. Run 41 was interrupted by the beam dropping (operators called), and run 42 we are just trying to get EURICA to
synchronize with AIDA DAQ.
1:08 Started AIDA Run 43 for 60Ti beam (EURICA run 2027; BigRIPS run 2132; CAEN Run 3018) |
Sat Jun 11 16:06:16 2016, TD, [How To] Monitor per FEE64 Activity
|
Launch terminal and enter commands
|
Sat Jun 11 15:48:49 2016, TD, [How To] Monitor Pause-Resume Times
|
The basic GREAT data format analyser will report per FEE cumulative
pause-resume times which should be << timestamp elapsed time (which
is time taken to write the data file analysed).
|
Sat Jun 11 13:57:09 2016, laura, How to monitor and check synchronisation of FEES   
|
Alfredo has written a program to check the synchronisation of the FEES, which need to be checked regularly
To do this: |
Sat Jun 11 10:29:16 2016, AE, TD, LHB, synchronization between different FEEs  
|
file AIDA10_20: stopped on June 10, 14:59
file AIDA10_40: stopped on June 10, 16:16
|
Fri Jun 10 21:07:52 2016, AE, DK, TD, ML, MA, Saturday 11 June 2016 8x
|
04.51 Start run AIDA18. Beam is back from the operators.
Scalers are shown as attachment 1
Leak currents seem okay (all < 5 uA), shown as attachments 2 and 3.
|
Fri Jun 10 14:14:56 2016, TD, nnaida19  
|
See attachments 1 and 2 and spot the difference ...
|
Fri Jun 10 14:02:17 2016, TD (courtesy VFEP), [How to] Avoid Power-Cycling/Rebooting FEE64s
|
If you obtain the 'unable to connect' from one, or more, of the FEE64s try the
following procedure *before* power-cycling/rebooting all of the FEE64s.
|
Fri Jun 10 12:51:19 2016, TD, ADC offsets - pass 1 -18.15 3 June 2016
|
Column order:
|