633
|
Mon Jun 5 08:43:24 2017 |
CB, TD, PW, DK | Monday 5 June 16:00 to 24:00 | 16:43 Leakage currents OK - see attachment
1
FEE64 temperatures OK - see attachment |
38x | |
632
|
Sun Jun 4 23:50:24 2017 |
CB, PW, DK, TD | Monday 5 June 08:00 to 16:00 | 07:50 Leakage currents OK - attachment 1
FEE64 temperatures OK - attachment
2
|
24x | |
631
|
Sun Jun 4 16:00:49 2017 |
NN, OH | Monday 5 June 00:00 to 08:00 | 23:59 BigRIPS and Briken stop their DAQ
AIDA run file R2_245
|
19x | |
524
|
Mon Dec 5 10:51:08 2016 |
TD | Monday 5 December | 19.50 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures HIGH - see attachment |
    | |
96
|
Mon May 4 01:27:56 2015 |
JA, TD, AE, CG & JLT | Monday 4 May 2015 |
09.18 SN changed degrader to 5.7mm Al (4mm
+ all variable degraders + additional 1mm)
|
16x | |
411
|
Mon Oct 31 02:00:01 2016 |
TD | Monday 31 October | 11.00 DAQ continues OK
DAQ STOP OK
Most recent files R91_568 last accessed |
11x | |
878
|
Mon Jul 31 09:43:37 2023 |
TD | Monday 31 July |
10.43 DSSSD bias +100V leakage current +7.550uA
|
44x | |
254
|
Mon May 30 02:50:19 2016 |
CG | Monday 30th May | 10.30 Pulser walkthrough carried out 90,000
- 10,000 @ 10,000 step
|
 | |
691
|
Mon Oct 30 01:10:28 2017 |
TD, OH | Monday 30 October | 10.10 DAQ running OK - data transfer not enabled
BNC PB-4
|
8x | |
827
|
Mon Jun 3 05:40:19 2019 |
TD | Monday 3 June | 13.40 DAQ continues OK
ASIC settings 2019May19-17.54.03
|
25x | |
753
|
Sun Oct 28 23:34:28 2018 |
TD, OH, CA | Monday 29 October | 08.34 DAQ continues OK - current file Oct18/R9_6
08.37 all system wide checks OK *except* |
15x | |
608
|
Mon May 29 00:59:27 2017 |
TD, PV, CB, NN, OH | Monday 29 May | 09.00 DAQ continues OK
Current file May2017/R32_239
|
10x | |
350
|
Mon Aug 29 06:57:32 2016 |
TD | Monday 29 August |
Per the instructions provided by https://elog.ph.ed.ac.uk/AIDA/331
added Servisol Heat Sink Compound
|
7x | |
486
|
Sun Nov 27 16:29:51 2016 |
CG, AE, DK | Monday 28 November | 01.28 Beam stopped temporarily.
~750MB into R26_38.
Bias and leakage currents ok, as are |
12x | |
818
|
Tue May 28 01:37:14 2019 |
TD | Monday 28 May | 09.30 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 75% M-H markers
|
8x | |
814
|
Mon May 27 02:50:20 2019 |
TD | Monday 27 May | 10.50 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 60% M-H markers - topped |
30x | |
537
|
Mon Mar 27 03:29:05 2017 |
OH, TD, DK, CG | Monday 27 March | 11:28 Biases and leakages okm (see attachment
1)
|
15x | |
73
|
Mon Apr 27 01:48:59 2015 |
JA, LHB, TD, VP, AE & CG | Monday 27 April 2015 | DSSSD #1 +100V, +3.8uA
DSSSD #2 +100V, +5.5uA
|
8x | |
724
|
Mon Jun 25 01:56:08 2018 |
OH, TD | Monday 25th June | 09:55 Alpha run stopped
10:45 Investigating the large noise in FEE28
|
21x | |
185
|
Mon Apr 25 10:11:40 2016 |
CG, KM, PV & TD | Monday 25 April |
AIDA stand, Julabo FL11006 recirculating
chiller (with 110VAC/50Hz - 240VAC/50Hz 3ph |
|
|