AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 30 of 46  ELOG logo
  ID Date Author Subject Text Attachments
  338   Fri Aug 19 09:43:27 2016 TD, VP, reply PJCSFriday 19 August
> 14.00 Both AIDA NIM bins U/S 
>       Upper NIM bin - BNC PB-4, Ortec 433,
  
  337   Fri Aug 19 07:42:22 2016 TD, PVFriday 19 August
14.00 Both AIDA NIM bins U/S 
      Upper NIM bin - BNC PB-4, Ortec 433,
 6x 
  336   Wed Aug 17 14:44:52 2016 Patrick Coleman-Smith[HowTo] start acquisition using the new "Start ASIC Readout" buttonDue to sometimes operating with very noisy
systems, both at Daresbury and RIKEN, I have
installed a change to the startup of the
 RunControl_portion.png 
  335   Wed Aug 17 14:10:05 2016 Patrick Coleman-SmithLinux Memory problem solutions for FEE64The problem indicated by "page allocation
failure" and the kernal subsequently
"killing" the AidaExecV8 process
  
  334   Mon Aug 15 09:55:08 2016 Patrick Coleman-SmithFound a candidate for DAQ failure.The problem :-
The DAQ stops working and can only
be fixed by a reboot of the FEE64s.
  
  333   Mon Aug 1 11:30:07 2016 Patrick Coleman-SmithFirst time remotely power up HV in RIKEN from DaresburyLogged into aidas1 and opened the nnrpi1
relay control window ... powered up the FEE64s.
seperatly connected to ribfdaq and
  
  332   Sun Jul 31 09:38:07 2016 TDAnalysis of AIDA75_1Attachment 2 - analysis from *end* of file
AIDA75_1
 AIDA75_1.txtUntitled.png200.png400.png 
  331   Thu Jul 28 11:35:58 2016 Patrick Coleman-Smith[HowTo] Apply Thermal paste to FPGA   Process_for_applying_thermal_paste_to_the_FPGA_in_FEE64.pdf 
  330   Mon Jul 25 08:38:56 2016 TDAnalysis of R4   R4.out 
  329   Wed Jul 20 18:41:55 2016 DKAIDA topped up on water I actually topped off the chiller
with water tonight as I am returning to Scotland
(and then off to CERN) within hours.
  
  328   Mon Jul 18 12:00:16 2016 Patrick Coleman-SmithReport of remote operation of Aida at RIKEN 11/7 to 14/7






Normal
0
  
  327   Thu Jul 14 16:55:32 2016 Patrick Coleman-SmithChanges to AIDA softwareAn updated copy of the merger has been
downloaded ( merger64.AD ) with a copy of
/MIDAS/Merger/AIDA/Startup.
  
  326   Fri Jul 8 18:54:47 2016 TDAnalysis July2016/R1 data
See https://elog.ph.ed.ac.uk/AIDA/324
 R1_0.outR1_114.outanalyser2.fUntitled.png 
  325   Thu Jul 7 17:16:11 2016 Patrick Coleman-SmithInstall & Run new firmware with diagnostics for the SYNCConnected to aidas from daresbury.
Started Firefox with windows for Rpi, Merge,
Runcontrol.
  
  324   Tue Jul 5 13:43:02 2016 DK, PVPulser Test Run after AIDA is movedNeeded to run startx and start the TcLHttpd
server on rpi
Following along here: https://elog.ph.ed.ac.uk/AIDA/242
 10x 
  323   Tue Jul 5 10:26:11 2016 DKAIDA relocation picturesHere are some pictures after AIDA's relocation.
In principle, it can stay here, but
probably after the tests we will push it
 6x 
  322   Tue Jul 5 09:39:27 2016 DKRly16 is not onlineAIDA was relocated, and now I want to power
it on to do some tests.  However, I
cannot get the Rly16 service running.
 usb_serial.JPG 
  321   Sat Jun 18 14:35:31 2016 TDAIDA photographs - June 2016 - 4   IMG_5854.JPGIMG_5855.JPGIMG_5856.JPGIMG_5857.JPGIMG_5863.JPG 
  320   Thu Jun 16 08:18:50 2016 TDAIDA photographs - May 2016    IMG_5751.JPGIMG_5721.JPG 
  319   Thu Jun 16 08:12:51 2016 TDAIDA photographs - June 2016 - 3   IMG_5849.JPGIMG_5850.JPGIMG_5851.JPG 
ELOG V3.1.4-unknown