  633   Mon Jun 5 08:43:24 2017 CB, TD, PW, DKMonday 5 June 16:00 to 24:0016:43  Leakage currents OK - see attachment
1
       FEE64 temperatures OK - see attachment
 38x 
  632   Sun Jun 4 23:50:24 2017 CB, PW, DK, TDMonday 5 June 08:00 to 16:0007:50  Leakage currents OK - attachment 1
       FEE64 temperatures OK - attachment
2
 24x 
  631   Sun Jun 4 16:00:49 2017 NN, OHMonday 5 June 00:00 to 08:0023:59   BigRIPS and Briken stop their DAQ
        AIDA run file R2_245
 19x 
  524   Mon Dec 5 10:51:08 2016 TDMonday 5 December19.50 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      FEE64 temperatures HIGH - see attachment
 1.png2.png3.png4.pngAIDA_leakage_current(12).xlsx 
  96   Mon May 4 01:27:56 2015 JA, TD, AE, CG & JLTMonday 4 May 2015
09.18 SN changed degrader to 5.7mm Al (4mm
+ all variable degraders + additional 1mm)
 16x 
  411   Mon Oct 31 02:00:01 2016 TDMonday 31 October11.00 DAQ continues OK
      DAQ STOP OK
      Most recent files R91_568 last accessed
 11x 
  878   Mon Jul 31 09:43:37 2023 TDMonday 31 July
10.43 DSSSD bias +100V leakage current +7.550uA
 44x 
  254   Mon May 30 02:50:19 2016 CGMonday 30th May10.30 Pulser walkthrough carried out 90,000
- 10,000 @ 10,000 step
 startup.tcl95.png 
  691   Mon Oct 30 01:10:28 2017 TD, OHMonday 30 October10.10 DAQ running OK - data transfer not enabled

      BNC PB-4
 8x 
  827   Mon Jun 3 05:40:19 2019 TDMonday 3 June13.40 DAQ continues OK

      ASIC settings 2019May19-17.54.03
 25x 
  753   Sun Oct 28 23:34:28 2018 TD, OH, CAMonday 29 October 08.34 DAQ continues OK - current file Oct18/R9_6

08.37 all system wide checks OK *except*
 15x 
  608   Mon May 29 00:59:27 2017 TD, PV, CB, NN, OHMonday 29 May09.00 DAQ continues OK 
      Current file May2017/R32_239
 10x 
  350   Mon Aug 29 06:57:32 2016 TDMonday 29 August
Per the instructions provided by https://elog.ph.ed.ac.uk/AIDA/331
added Servisol Heat Sink Compound
 7x 
  486   Sun Nov 27 16:29:51 2016 CG, AE, DKMonday 28 November01.28 Beam stopped temporarily.
      ~750MB into R26_38.
      Bias and leakage currents ok, as are
 12x 
  818   Tue May 28 01:37:14 2019 TDMonday 28 May09.30 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 75% M-H markers
 8x 
  814   Mon May 27 02:50:20 2019 TDMonday 27 May10.50 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 60% M-H markers - topped
 30x 
  537   Mon Mar 27 03:29:05 2017 OH, TD, DK, CGMonday 27 March11:28 Biases and leakages okm (see attachment
1)
 15x 
  73   Mon Apr 27 01:48:59 2015 JA, LHB, TD, VP, AE & CGMonday 27 April 2015DSSSD #1 +100V, +3.8uA
DSSSD #2 +100V, +5.5uA
 8x 
  724   Mon Jun 25 01:56:08 2018 OH, TDMonday 25th June09:55 Alpha run stopped

10:45 Investigating the large noise in FEE28
 21x 
  185   Mon Apr 25 10:11:40 2016 CG, KM, PV & TDMonday 25 April
AIDA stand, Julabo FL11006 recirculating
chiller (with 110VAC/50Hz - 240VAC/50Hz 3ph
  