Mon Oct 24 02:46:57 2016, TD, Monday 24 October 19x
|
10.47 DAQ found stopped, no merger error messages
Most recent file R78_281, last accessed 06.46
|
Mon Jul 24 08:54:48 2023, TD, Monday 24 July 17x
|
09.54 DSSSD#1 bias +100V leakage current +9.065uA
|
Mon Oct 23 02:24:14 2017, TD, OH, Monday 23 October 19x
|
10:18 Leakage and bias ok - Attachment 1
FEE temperatures ok - Attachment 2
Statistics - Attachment 3
|
Mon Feb 23 07:03:10 2015, TD, AE & CG, Monday 23 February 2015
|
14.30 Saved nnaida1-16 ASIC + Waveform configurations to directory (Data Base Key)
2015Feb23-12.11.40
(directory aidas1:/MIDAS/DB/EXPERIMENTS/AIDA/2015Feb23-12.11.40) |
Mon May 22 02:34:51 2017, CB, TD, Monday 22 May 16x
|
10.35 DAQ continues OK
Current file May2017/R19_253
|
Mon May 22 08:43:10 2017, CB, TD, Patrick, Monday 22 May
|
> 10.35 DAQ continues OK
> Current file May2017/R19_253
>
|
Mon May 22 08:53:42 2017, CB, TD, Patrick, Monday 22 May
|
> Concerning nnaida7 and the failure of calibration..... have you tried to calibrate it using the FADC Align & Control ?
> If it still fails then there is a question about the quality of the clock signal being received by this module.
> I will log through and look at the console log for any anomolies but please try and calibrate.
|
Mon Nov 21 02:12:45 2016, CG & TD, Monday 21 November 12x
|
11.10 DSSSD bias & leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachment 3
|
Mon Nov 20 00:53:27 2017, TD, CB, Monday 20 November 9x
|
09.50 Detector biases & leakage currents OK - see attachments 1 & 2
FEE64 Temperatures OK - see attachment 3
DAQ statistics OK - see attachment 4
|
Mon May 20 02:16:58 2019, CA, TD, Monday 20 May 2019 16x
|
10:18 DAQ Continues ok
Alpha run continues - Currently on file R8_2
|
Mon Aug 22 10:35:31 2016, TD, Monday 20 August 17x
|
11.00 Restore power to AIDA following Saturday's shutdoen in preparation for the planned maintenance
outage on Sunday.
|
Mon Aug 22 13:37:30 2016, TD, Monday 20 August
|
> 11.00 Restore power to AIDA following Saturday's shutdoen in preparation for the planned maintenance
> outage on Sunday.
>
|
Mon Oct 2 14:03:42 2023, TD, Monday 2 October  
|
15.00 DSSSD bias +60V +6.44uA - breakdown above c. 60V, bias +100V leakage current +20-30uA
|
Mon May 2 12:13:25 2016, CG,PV,TD, Monday 2 May 2016 22x
|
| |
Mon Jul 2 02:36:41 2018, OH, Monday 2 July
|
10:35 Bias and leakage currents ok - attachment 1
FEE Temps ok - attachment 2
System wide checks all ok
|
Mon Oct 17 04:10:30 2016, TD, Monday 17 October 7x
|
12.05 DAQ found stopped
Most recent file R49_226, last accessed 06.26
Restart merger OK
|
Sun Jun 16 16:00:58 2019, ML, CG, OH, Monday 17 June 2019 17x
|
It's a new day, it's a new log entry !!
01:25 DTAS run 46 started
|
Mon Jun 17 02:31:53 2019, CA, TD, OH, Monday 17 June 08.00-16.00 21x
|
10.41 DAQ continues OK file RIBF147/R2_352
100Sn setting, no degrader
|
Mon Feb 16 06:17:31 2015, TD, AEV & CG, Monday 16th Feb progress 10x
|
16/02/2015
1500: AIDA moved into operational position.
Water cooling circuit visually checked, fittings, etc for loose fittings/snags/kinks. |
Mon May 15 02:01:02 2017, TD, OH, Monday 15 May 7x
|
10.01 DAQ continues OK
Current file May2017/R8_334
|