ID |
Date |
Author |
Subject |
Text |
|
238
|
Thu May 26 03:46:41 2016 |
TD, AE & CG | Thursday 26 May 2016 | 11.45 AIDA discriminator rates - see attachment
1
Today's rates similar to yesterday's |
|
237
|
Thu May 26 01:44:45 2016 |
Patrick Coleman-Smith | [HowTo] Use the Multiplicity Trigger Firmware, V8.18, and update the files |
Done. Awaiting test. See attachments 1-2.
|
|
236
|
Wed May 25 18:51:54 2016 |
Patrick Coleman-Smith | [HowTo] Use the Multiplicity Trigger Firmware, V8.18, and update the files | The attached firmware file, FEE_GF_Feb16_18.bin,
should be saved to /MIDAS/Aida and the FlashPgm.csh
file edited
|
|
235
|
Wed May 25 02:10:51 2016 |
TD, CG | Wednesday 25 May 2016 | 10.05 Recirculating chiller on
FEE power on
Detector bias on - ambient temp +23 |
|
234
|
Tue May 24 08:28:28 2016 |
Patrick Coleman-Smith | [HowTo] Save power if not using the Waveforms and restart the Waveforms | The USB controlled power Relays are near their
AC fuse operating limit which has caused
some Fuse failures.
|
|
233
|
Tue May 24 07:12:30 2016 |
TD | 3x WDC WD30EFRX ATA 3Tb disks added to aidas1 LVM configuration |
The 3x WDC WD30EFRX ATA 3Tb disks installed
in aidas1 in April 2015 (formerly /data20, |
9x |
232
|
Tue May 24 06:39:17 2016 |
TD, CG | per FEE64 waveforms |
Attachments 1-30 per FEE64 ASIC #1 waveforms
|
30x |
231
|
Tue May 24 00:06:26 2016 |
TD | 24 May 2016 | Overnight. DAQ stopped. Detector bias off.
FEE power and recirculating chiller on.
|
|
230
|
Mon May 23 17:21:29 2016 |
Patrick Coleman-Smith | [HowTo] A solution to the problem of no SYNCs | When starting Aida some FEE64 fail to provide
SYNC data , or any data for that matter,
on the ASIC data stream.
|
|
229
|
Mon May 23 09:17:55 2016 |
Patrick Coleman-Smith | Multiplicity Trigger Specification | Please read and comment on the attached
specification. |
|
228
|
Mon May 23 07:28:38 2016 |
TD | 23 May 2016 | 12.45 Rly16 'Sequence ALL On' operational
15.20 Startup remote control of CAEN N1419 |
25x |
227
|
Sat May 14 11:27:09 2016 |
AE, VP | [How To] DAQ correlation monitor (June16 campaign) | The program for online monitoring the correlation
of the DAQ systems (AIDA-EURICA-BigRIPS)
through a common scaler is SyncCheck (J. |
|
226
|
Fri May 13 13:27:50 2016 |
patrick Coleman-Smith | Power supply changes and blowing fuses ! | Reading about the power supply changes
and the requirement to replace fuses leads
me to be concerned. |
|
225
|
Fri May 13 13:24:42 2016 |
Patrick Coleman-Smith | An idea that might help when everything grinds to a halt | When using the T9 system and running with
too much rate in one FEE64 so the system
is unbalanced. |
|
224
|
Fri May 13 06:18:53 2016 |
AE, VP, BM | Friday May 13th | 11 am: Changed configuration of power source
for AIDA PSU (see paper logbook). Now both
cables with power for
|
9x |
223
|
Thu May 12 16:55:37 2016 |
AE, VP, BM | Thursday May 12 | Continued work on beta-trigger for EURICA.
However the system seems to have different
noise condition than before, which
|
7x |
222
|
Thu May 12 15:50:48 2016 |
Patrick | System Checks and firmware update | Added two checks to the System wide checks.
Modified
the Firmware so the checks work properly.
One
check reads the status of the FEE64 clocks |
|
221
|
Wed May 11 11:24:09 2016 |
Patrick | Correlation Controls | Please note that the Force Trigger and Reset
buttons in the Correlation Browser only
have meaning if the FEE64
|
|
220
|
Wed May 11 06:37:32 2016 |
AE, VP, BM | Wednesday 11 May | *2:30 pm*: changed power source of USB-controlled
power supply for FEEs. Now one of the power
cables is connected
|
|
219
|
Wed May 11 06:01:16 2016 |
AE, VP, BM | Beta trigger | Please find attached the best diagram of the
beta trigger logic circuit for EURICA campaign
2016 |
|