| ID |
Date |
Author |
Subject |
Text |
 |
|
535
|
Sun Mar 26 03:53:43 2017 |
CG, OH | Sunday 26th March | 10.30 Left DAQ running overnight to look for
alphas in DSSDs.
DSSD bias still ok @ 23.3oC (see att. |
 | |
185
|
Mon Apr 25 10:11:40 2016 |
CG, KM, PV & TD | Monday 25 April |
AIDA stand, Julabo FL11006 recirculating
chiller (with 110VAC/50Hz - 240VAC/50Hz 3ph |
| |
448
|
Wed Nov 9 22:16:11 2016 |
CG, DK, TD, ML | NP1412 R24 R25 | 07.15 R24 started. BRIKEN run 33.
76~78Ni beam setting.
F5 C target out. F7 CH2 in. F11 C out.
|
34x | |
508
|
Wed Nov 30 21:26:52 2016 |
CG, DK, TD | Thursday 1 December | 00.51 BigRIPS data file 1112.
01.50 BigRIPS data file 1113.
|
10x | |
287
|
Mon Jun 6 19:26:38 2016 |
CG, DK, BM, AE | Tues 7th June | 02.08 Tried updating AIDA SYNC on stats
page and got this message.
|
28x | |
278
|
Sun Jun 5 17:09:49 2016 |
CG, DK, AE | Monday 6th June | 00.45 Run R1100 started on n-rich setting
(EURICA run_1100, BigRIPS run 1165)
|
20x | |
437
|
Tue Nov 8 18:52:32 2016 |
CG, DK | NP1412 R7 R8 | 03.50 74-76Ni beam delivered to F11.
F11 plastic rate ~1kHz.
F5 C target in. F7 empty. F11 C target |
   | |
438
|
Tue Nov 8 21:01:40 2016 |
CG, DK | NP1412 R9 | 06.02 R9 started with Takechi group C target
out and all variable degraders in.
F5 C in. F7 empty. F11 empty.
|
| |
468
|
Fri Nov 25 15:56:36 2016 |
CG, DK | Saturday 26 November | 00.55 Bias and leakage currents ok (attachments
1+2).
Temps ok (attachment 3).
|
11x | |
132
|
Sat Dec 12 02:12:17 2015 |
CG, AE, VH | RIKEN progress | Stripped down contents of AIDA NIM bins
to only what is required by AIDA.
Now have BNC PB-5 pulser, sum and |
9x | |
38
|
Wed Feb 18 05:49:29 2015 |
CG, AE, TD, PJC-S | Wed 18th Feb progress | 18/02/15
1300: Error seen when trying to check
ASIC settings. See Attachment #1. Power cycle |
15x | |
498
|
Tue Nov 29 15:12:33 2016 |
CG, AE, TD, DK | Wednesday 30 November | 00.11 Beam stopped for target @F8 change.
R35 stopped at R35_62.
BRIKEN file 161129_1951 155->159
|
13x | |
36
|
Tue Feb 17 06:32:24 2015 |
CG, AE, TD | Tues 17th Feb progress | 17/02/15
1515: Installed detector BB18 2977-7
with 3 modified kapton cables, one unmodified |
22x | |
40
|
Thu Feb 19 08:21:33 2015 |
CG, AE, TD | Thrus 19th Feb progress | 19/02/15
1000: Check system gives same resolution
as yesterday, removing only the Cu braiding |
39x | |
41
|
Fri Feb 20 10:04:29 2015 |
CG, AE, TD | Fri 20th progress | 20/02/15
1400: Measured leakage current as
function of bias V for the Caen 1419B high |
 | |
43
|
Sat Feb 21 06:37:52 2015 |
CG, AE, TD | Sat 21st Feb progress | 21/02/15
1230: Developing the software to
check synchronisation between DAQs. Below |
6x | |
44
|
Sun Feb 22 06:47:23 2015 |
CG, AE, TD | Sunday 22 February 2015 | 22/02/15
am Testing various
grounding configurations for the connection |
| |
66
|
Wed Apr 22 08:50:59 2015 |
CG, AE, TD | Wednesday 22nd April progress | 22/04/15
1230: Solved problem (empty spectra
despite changing modules) with nnaida5 noted |
   | |
69
|
Thu Apr 23 10:27:59 2015 |
CG, AE, TD | Thursday 23rd April progress | 23/04/15
1800: Spent majority of the day moving
AIDA forward and into EURICA. |
   | |
486
|
Sun Nov 27 16:29:51 2016 |
CG, AE, DK | Monday 28 November | 01.28 Beam stopped temporarily.
~750MB into R26_38.
Bias and leakage currents ok, as are |
12x |
|