Entry  Sun Mar 26 03:53:43 2017, CG, OH, Sunday 26th March bias_260317.pngnniada15_w_260317.png
10.30 Left DAQ running overnight to look for alphas in DSSDs.
      DSSD bias still ok @ 23.3oC (see att. 1).
      FEE temps ok.
Entry  Mon Apr 25 10:11:40 2016, CG, KM, PV & TD, Monday 25 April 

AIDA stand, Julabo FL11006 recirculating chiller (with 110VAC/50Hz - 240VAC/50Hz 3ph transformer)
moved from F11 downstream wall to ~2m downstream of EURICA
Entry  Wed Nov 9 22:16:11 2016, CG, DK, TD, ML, NP1412 R24 R25 34x
07.15 R24 started. BRIKEN run 33.
      76~78Ni beam setting.
      F5 C target out. F7 CH2 in. F11 C out.
Entry  Wed Nov 30 21:26:52 2016, CG, DK, TD, Thursday 1 December 10x
00.51 BigRIPS data file 1112.

01.50 BigRIPS data file 1113.
Entry  Mon Jun 6 19:26:38 2016, CG, DK, BM, AE, Tues 7th June 28x
02.08 Tried updating AIDA SYNC on stats page and got this message.
            See attachment 8
 
Entry  Sun Jun 5 17:09:49 2016, CG, DK, AE, Monday 6th June 20x
00.45 Run R1100 started on n-rich setting (EURICA run_1100, BigRIPS run 1165)
            Degraders as noted in previous entry
           Check clock status failed for nnaida5. ADC calib failed for nnaida8. nnaida19 failed
Entry  Tue Nov 8 18:52:32 2016, CG, DK, NP1412 R7 R8 bias1.pngbias2.pngbias1.pngbias2.png
03.50 74-76Ni beam delivered to F11.
      F11 plastic rate ~1kHz.
      F5 C target in. F7 empty. F11 C target in.
Entry  Tue Nov 8 21:01:40 2016, CG, DK, NP1412 R9 
06.02 R9 started with Takechi group C target out and all variable degraders in.
      F5 C in. F7 empty. F11 empty.
      F11 plastic rate 1.1kHz.
Entry  Fri Nov 25 15:56:36 2016, CG, DK, Saturday 26 November 11x
00.55 Bias and leakage currents ok (attachments 1+2).
      Temps ok (attachment 3).
Entry  Sat Dec 12 02:12:17 2015, CG, AE, VH, RIKEN progress 9x
Stripped down contents of AIDA NIM bins to only what is required by AIDA.
Now have BNC PB-5 pulser, sum and invert module, single and quad Caen HV supplies in the top crate and the MACBs in the bottom crate.
Removed were FIFO, leading edge discriminator and a quad coincidence module, all used in the DAQ integration.
Entry  Wed Feb 18 05:49:29 2015, CG, AE, TD, PJC-S, Wed 18th Feb progress 15x
18/02/15
1300: Error seen when trying to check ASIC settings. See Attachment #1. Power cycle removed error.
           nnaida3 still performing much better than other three cards connected to detector
Entry  Tue Nov 29 15:12:33 2016, CG, AE, TD, DK, Wednesday 30 November 13x
00.11 Beam stopped for target @F8 change.
      R35 stopped at R35_62.
      BRIKEN file 161129_1951 155->159
Entry  Tue Feb 17 06:32:24 2015, CG, AE, TD, Tues 17th Feb progress 22x
17/02/15
1515: Installed detector BB18 2977-7 with 3 modified kapton cables, one unmodified (in nnaida1) with 207Bi source.
           Bias voltage @ -100V with leakage current -11.6uA @ ambient temp of ~20oC.
Entry  Thu Feb 19 08:21:33 2015, CG, AE, TD, Thrus 19th Feb progress 39x
19/02/15
1000: Check system gives same resolution as yesterday, removing only the Cu braiding connecting and grounding all adapter PCBs (also moved bias
braid back to nnaida3).
Entry  Fri Feb 20 10:04:29 2015, CG, AE, TD, Fri 20th progress bias_voltage_vs_leakage_current_for_caen_n1419b_and_detector_bb18_2977-20(2).png2015-02-20_20.27.57.jpg
20/02/15
1400: Measured leakage current as function of bias V for the Caen 1419B high voltage supply and detector BB18 2977-20. (see attachment #1)
1500: Modified MACB installed and connected to BELEN and RIBF DAQs (see attachment #2 for signal flow diagram).
Entry  Sat Feb 21 06:37:52 2015, CG, AE, TD, Sat 21st Feb progress 6x
21/02/15
1230: Developing the software to check synchronisation between DAQs. Below line runs program on aidas1 - sends data from TapeServer to BELEN.
            ./DataRelayFilter -n 10.32.6.196 -p 10307 -I 2
Entry  Sun Feb 22 06:47:23 2015, CG, AE, TD, Sunday 22 February 2015 Screenshot.png
22/02/15
am    Testing various grounding configurations for the connection between the DSSSD and the FEE64 modules.
 
Entry  Wed Apr 22 08:50:59 2015, CG, AE, TD, Wednesday 22nd April progress 20150422_nnaida1_FWHM.png20150422_nnaida3_FWHM.png20150422_nnaida5_FWHM.png20150422_nnaida8_FWHM.png
22/04/15
1230: Solved problem (empty spectra despite changing modules) with nnaida5 noted in previous progress update.
          During Feb tests, nnaida5 was very noisy compared to other nnaida => switched it to medium
Entry  Thu Apr 23 10:27:59 2015, CG, AE, TD, Thursday 23rd April progress IMG_2846.JPGIMG_2847.JPGIMG_2848.JPGIMG_2849.JPG
23/04/15
1800: Spent majority of the day moving AIDA forward and into EURICA.
          So far everything seems to fit very well, we have just noticed a few points of possible
Entry  Sun Nov 27 16:29:51 2016, CG, AE, DK, Monday 28 November 12x
01.28 Beam stopped temporarily.
      ~750MB into R26_38.
      Bias and leakage currents ok, as are FEE temps (attachments 1-3).