  535   Sun Mar 26 03:53:43 2017 CG, OHSunday 26th March10.30 Left DAQ running overnight to look for
alphas in DSSDs.
      DSSD bias still ok @ 23.3oC (see att.
 bias_260317.pngnniada15_w_260317.png 
  185   Mon Apr 25 10:11:40 2016 CG, KM, PV & TDMonday 25 April
AIDA stand, Julabo FL11006 recirculating
chiller (with 110VAC/50Hz - 240VAC/50Hz 3ph
  
  448   Wed Nov 9 22:16:11 2016 CG, DK, TD, MLNP1412 R24 R2507.15 R24 started. BRIKEN run 33.
      76~78Ni beam setting.
      F5 C target out. F7 CH2 in. F11 C out.
 34x 
  508   Wed Nov 30 21:26:52 2016 CG, DK, TDThursday 1 December00.51 BigRIPS data file 1112.

01.50 BigRIPS data file 1113.
 10x 
  287   Mon Jun 6 19:26:38 2016 CG, DK, BM, AETues 7th June02.08 Tried updating AIDA SYNC on stats
page and got this message.
         
 28x 
  278   Sun Jun 5 17:09:49 2016 CG, DK, AEMonday 6th June00.45 Run R1100 started on n-rich setting
(EURICA run_1100, BigRIPS run 1165)
           
 20x 
  437   Tue Nov 8 18:52:32 2016 CG, DKNP1412 R7 R803.50 74-76Ni beam delivered to F11.
      F11 plastic rate ~1kHz.
      F5 C target in. F7 empty. F11 C target
 bias1.pngbias2.pngbias1.pngbias2.png 
  438   Tue Nov 8 21:01:40 2016 CG, DKNP1412 R906.02 R9 started with Takechi group C target
out and all variable degraders in.
      F5 C in. F7 empty. F11 empty.
  
  468   Fri Nov 25 15:56:36 2016 CG, DKSaturday 26 November00.55 Bias and leakage currents ok (attachments
1+2).
      Temps ok (attachment 3).
 11x 
  132   Sat Dec 12 02:12:17 2015 CG, AE, VHRIKEN progressStripped down contents of AIDA NIM bins
to only what is required by AIDA.
Now have BNC PB-5 pulser, sum and
 9x 
  38   Wed Feb 18 05:49:29 2015 CG, AE, TD, PJC-SWed 18th Feb progress18/02/15
1300: Error seen when trying to check
ASIC settings. See Attachment #1. Power cycle
 15x 
  498   Tue Nov 29 15:12:33 2016 CG, AE, TD, DKWednesday 30 November00.11 Beam stopped for target @F8 change.
      R35 stopped at R35_62.
      BRIKEN file 161129_1951 155->159
 13x 
  36   Tue Feb 17 06:32:24 2015 CG, AE, TDTues 17th Feb progress17/02/15
1515: Installed detector BB18 2977-7
with 3 modified kapton cables, one unmodified
 22x 
  40   Thu Feb 19 08:21:33 2015 CG, AE, TDThrus 19th Feb progress19/02/15
1000: Check system gives same resolution
as yesterday, removing only the Cu braiding
 39x 
  41   Fri Feb 20 10:04:29 2015 CG, AE, TDFri 20th progress20/02/15
1400: Measured leakage current as
function of bias V for the Caen 1419B high
 bias_voltage_vs_leakage_current_for_caen_n1419b_and_detector_bb18_2977-20(2).png2015-02-20_20.27.57.jpg 
  43   Sat Feb 21 06:37:52 2015 CG, AE, TDSat 21st Feb progress21/02/15
1230: Developing the software to
check synchronisation between DAQs. Below
 6x 
  44   Sun Feb 22 06:47:23 2015 CG, AE, TDSunday 22 February 201522/02/15
am    Testing various
grounding configurations for the connection
 Screenshot.png 
  66   Wed Apr 22 08:50:59 2015 CG, AE, TDWednesday 22nd April progress22/04/15
1230: Solved problem (empty spectra
despite changing modules) with nnaida5 noted
 20150422_nnaida1_FWHM.png20150422_nnaida3_FWHM.png20150422_nnaida5_FWHM.png20150422_nnaida8_FWHM.png 
  69   Thu Apr 23 10:27:59 2015 CG, AE, TDThursday 23rd April progress23/04/15
1800: Spent majority of the day moving
AIDA forward and into EURICA.
 IMG_2846.JPGIMG_2847.JPGIMG_2848.JPGIMG_2849.JPG 
  486   Sun Nov 27 16:29:51 2016 CG, AE, DKMonday 28 November01.28 Beam stopped temporarily.
      ~750MB into R26_38.
      Bias and leakage currents ok, as are
 12x 