|
ID |
Date |
Author |
Subject |
Text |
|
|
38
|
Wed Feb 18 05:49:29 2015 |
CG, AE, TD, PJC-S | Wed 18th Feb progress | 18/02/15
1300: Error seen when trying to check
ASIC settings. See Attachment #1. Power cycle |
15x |
|
37
|
Tue Feb 17 08:03:32 2015 |
Patrick Coleman-Smith | [How To] Set up the Raspberry Pi for PuTTY |
|
|
|
36
|
Tue Feb 17 06:32:24 2015 |
CG, AE, TD | Tues 17th Feb progress | 17/02/15
1515: Installed detector BB18 2977-7
with 3 modified kapton cables, one unmodified |
22x |
|
35
|
Mon Feb 16 12:17:21 2015 |
Patrick Coleman-Smith | MACB update for 50Mhz external clock | This version of the MACB has an additional
selection at 5 for a ROOT module.
This will operate the Correlation |
|
|
34
|
Mon Feb 16 09:41:45 2015 |
Patrick Coleman-Smith | [How To] Set up the Raspberry Pi for PuTTY | When logged in and before opening PuTTY
open a cmdtool window.
cd /dev |
|
|
33
|
Mon Feb 16 06:17:31 2015 |
TD, AEV & CG | Monday 16th Feb progress | 16/02/2015
1500: AIDA moved into operational
position. |
10x |
|
32
|
Sun Feb 15 22:30:48 2015 |
TD | Julabo FL11006 Operating Manual | |
|
|
31
|
Sun Feb 15 06:12:00 2015 |
TD, AEV & CG | How to mount USB disk with NTFS |
Mount external USB expansion disk with NTFS
filesystems
|
|
|
30
|
Tue Feb 10 16:01:50 2015 |
Chris Griffin, Alfredo Estrade | High data rate - Pause/Resume | 06/02/15
A look at the data rate at
which Pause/Resumes start to cause missing |
6x |
|
29
|
Mon Feb 9 11:52:52 2015 |
Patrick Coleman-Smith | [ How To ] Integrating AIDA with other systems | This document details how to integrate
AIDA with other systems. |
|
|
28
|
Fri Jan 30 15:27:35 2015 |
Alfredo Estrade | [Analysis] 207Bi source (R61): check of monitor spectra |
A first look at the data from the 207Bi source
(run described in previous elog entry, ID |
7x |
|
27
|
Fri Jan 30 13:02:35 2015 |
Alfredo Estrade | [Data] R61 (207Bi source) and R62-R65 (pulser walk-through) | Jan 22, 2015
R61: 207Bi source spectra accumulated during |
|
|
26
|
Thu Jan 29 15:57:01 2015 |
Patrick Coleman-Smith | [How To] AIDA power supply alteration document | I've added the power supply change
document.
Please have a look and let me know |
|
|
25
|
Wed Jan 28 16:19:05 2015 |
Patrick Coleman-Smith | [How To] Loading new firmware into a FEE64 | Log into the FEE64 module using telnet.
use root
enter => /usr/sbin/flash_unlock |
|
|
24
|
Wed Jan 28 16:12:52 2015 |
Tom Davinson | AIDA Tests at STFC DL - 27-28.1.15 - TD & PCS | MSL type BB18-1000 2998-22 bias +200V I_L
+3.52uA
|
|
|
23
|
Thu Jan 22 14:26:10 2015 |
Alfredo and Tom | [DATA] R49: alpha background radioactivity | Jan20-21, 2015
|
|
|
22
|
Thu Jan 22 13:50:33 2015 |
Alfredo and Tom | Further measurements with filtered PSU | Jan 20, 2015
Test settings: DSSD biased at 100V, with |
|
|
21
|
Wed Jan 14 15:29:01 2015 |
Patrick | Filtered switch mode PSU performance | Trying the AIDA format power supply with
the simple filters installed.
The detector is attached and HV of |
|
|
20
|
Wed Dec 3 12:13:03 2014 |
Alfredo Estrade | IV curve with CAEN N1419 | Measured IV curve for BB18 DSSD with new CAEN
HV supply. Settings as in previous elog entry:
|
|
|
19
|
Thu Nov 20 14:05:21 2014 |
Tom Davinson | AIDA Tests at STFC DL - PCS, TD |
Configuration per Elog entries:
|
20x |