AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 5 of 46  ELOG logo
Entry  Mon Jun 6 14:24:07 2016, TD, ML & YS, R1118 (AIDA) 10x
22.14 R1118 starts

      aidas1 has been rebooted
Entry  Mon Jun 6 15:57:51 2016, TD, ML & YS, R1121 (AIDA) 43.png44.png

R1120 stalled shortly after DAQ GO
      'unable to connect' etc
Entry  Fri Jun 10 02:25:45 2016, TD, ML & YS, DAQ State of Play - Friday 10 June 2016 6x

10.25 Screenshots showing DAQ state of play during NP1512
Entry  Fri Jun 10 02:52:02 2016, TD, ML & YS, Friday 10 June 2016 16x
10.50 SyncCheck ... EURICA server refusing connection

[aida@d05 euricatssender]$ ./euricatssender -t
Entry  Fri Nov 17 15:53:03 2023, TD, JB, JG, Friday 17 November contd. 25x

AIDA ASIC settuings 2023Nov16-18.55.20
     low comparator p+n FEE64s 0xa, n+n 0xf
Entry  Thu Nov 16 09:09:58 2023, TD, JB, CC, VP, AIDA tests 16/11/2023 48x
Viewing AIDA status on Thursday morning 16/11/2023. 

Rates and histograms are observed with bPlast HV connected but not powered. The LIMO cables to the booster cards of bPlast are connected and the TAMEX
Entry  Thu Nov 16 17:43:25 2023, TD, JB, CC, VP, AIDA test 16/11/2023 cont. Screenshot_from_2023-11-16_16-37-22.pngScreenshot_from_2023-11-16_16-36-25.pngScreenshot_from_2023-11-16_16-35-51.pngScreenshot_from_2023-11-16_16-35-30.png
Screenshot uploads as I hit the 50 image upload limit.
Entry  Sun Jun 5 01:32:44 2016, TD, DK, GL, AE, PJW, First RIB implantation: Run 67 
We restarted the merger (Stop, Setup & Configure, Go, Pause) and then we could restart the DAQ as normal.  Rate is ~500 Hz.  
Entry  Sat Nov 26 07:11:34 2016, TD, DK, AE, Saturday 26 November, Part II 
16.11 The cyclotron and BigRIPS condition are now restored and we have good beam

     Count rate at F11 plastic is ~8 cps

     At F8, they are focued on 41Al (D5 Brho = 7.5235 Tm)
Entry  Sat Nov 26 07:45:48 2016, TD, DK, AE, Offline analysis of R7_45 103.png110.png111.png
R7_45 3mm Pb + 0.5mm W (+1mm Al) only (at start of run) changing to 1.5mm W (+2mm Al)

S O R T    C O M P L E T E ..... Sat Nov 26 16:46:31 2016
Entry  Sun Nov 27 06:35:47 2016, TD, DK, AE, Sunday 27 November - part 2 14x
14.15 BigRIPS run number is now 1029

15.22 BigRIPS run number is now 1030
Entry  Tue Mar 28 01:28:12 2017, TD, CG, OH, DK, Tuesday 28 March 15x

09.13 DAQ run R3 ends OK (final file R3_9)
      
Entry  Mon Nov 7 23:15:14 2016, TD, CG, OH, Tuesday 8 November 12x
08.15 DAQ found stalled

      Soft reset OK
Entry  Thu Nov 3 17:42:37 2016, TD, CG, DK, Friday 4 November 32x

00.40-02.30 Discussion with PJCS
 
Entry  Fri Nov 4 04:35:03 2016, TD, CG, DK, Friday 4 November part 2 36x
13.35 Swapped HDMI cables from master MACB to MACB #3 & #7
      for HDMI cables from MACB #7 ports 1 & 2 to MACB modules #8 & #9
Entry  Wed Nov 9 11:07:14 2016, TD, CG, DK, NP1412 R22 R23 6x
DAQ start (R22) failed - merger remained in 'want first sync' state, no output to TapeServer -> soft reset OK

start 20.07
    Reply  Sun May 29 10:11:07 2016, TD, CG & reply by PJCS, Saturday 8 May 2016 - reply about 'H' and "X" 
> 15.20 DAQ histogramming & data transfer #1 enabled
>       Merger configured, started, input paused
>       Following DAQ GO nnaida9 data transfer 'X' nnaida19 histogramming 'H' disappear - see attachments 1-7
Entry  Wed Jan 27 14:54:48 2016, TD, CG, Wednesday 27 January 2016 11.png14.png
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +8.110uA, ambient temperature +20.2 deg C
Entry  Tue May 24 06:39:17 2016, TD, CG, per FEE64 waveforms 30x

Attachments 1-30 per FEE64 ASIC #1 waveforms
Entry  Wed May 25 02:10:51 2016, TD, CG, Wednesday 25 May 2016 50.png51.png60.png
10.05 Recirculating chiller on
      FEE power on
      Detector bias on - ambient temp +23 deg  C - see attachments 1-2
ELOG V3.1.3-7933898