AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 9 of 44  ELOG logo
Entry  Wed Nov 14 14:46:47 2018, CA, Thursday 15th November 00:00 - 08:00 25x
23.58 DAQ continues ok (RIBF148/R5_505)

00.09 system wide checks ok, except nnaida7 ADC calibration failure
Entry  Wed Nov 14 07:43:35 2018, TD, Wednesday 14 November 16:00 - 00:00 21x
16.44 DAQ continues OK - AIDA file RIBF148/R5_432
      165Pm BigRIPS setting + 2.8mm Al degrader
Entry  Tue Nov 13 22:58:49 2018, OH , Wednesday 14 November 08:00 - 16:00 30x
08:01 BigRips and BRIKEN stop
      AIDA on file R5_346
Entry  Tue Nov 13 14:27:38 2018, LS, Wednesday 14 November 00:00 to 08:00 9x

00:00 BRIKEN stop AIDA file RIBF148/R5_269 
Entry  Tue Nov 13 07:35:37 2018, CA, TD, OH, Tuesday 13 November 16:00 - 00:00 20x
16.36 DAQ continues ok
      AIDA file RIBF148/R5_198
      BRIKEN file 37
Entry  Tue Nov 13 01:41:12 2018, TD, Offline analysis RIBF148/R5_130 to _139 20.png21.png22.png

10.41 FEE64 ADC data synchronised - attachment 1 
Entry  Mon Nov 12 23:03:53 2018, TD, Tuesday 13 November 08:00 - 16:00 23x

08.03 DAQ continues - AIDA file RIBF148/R5_117
      165Pm BigRIPS setting + 3mm Al degrader
Entry  Mon Nov 12 14:51:44 2018, OH, Tuesday 13 November 00:00 - 08:00 12x
00:00 AIDA currently on file R5_38
      BRIKEN on file 181112_2321_165Pm_019.dlt (AIDA file at start R5_33)
      BigRIPS run 1004
Entry  Mon Nov 12 08:59:43 2018, LS, CA, TD, Monday 12 November 6pm onwards 28x


17:59 DAQ continues OK
Entry  Sun Nov 11 21:35:42 2018, CB, OH, CA, LS, Monday 12 November 20x
06:35 DAQ Continues ok
      Stats ok - attachment 1
      FEE Temps ok - attachment 2
Entry  Sat Nov 10 21:53:29 2018, CA, CB, TD, OH, Sunday 11 November 21x
06.53 DAQ continues OK - data transfer disabled

06.55 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sat Nov 10 04:06:20 2018, TD, Less commonly recorded AIDA control tabs 20x

Some less commonly recorded AIDA control tabs whilst DAQ going (data transfer disabled)
Entry  Sat Nov 10 03:50:00 2018, CA, CB, TD, OH, Saturday 10 November 9x

12.35 DAQ continues OK - data transfer disabled
Entry  Fri Nov 9 02:26:58 2018, TD, Offline analysis R18, R27, R29 - alpha background 8x
Offline analysis of Oct18/R18_0 to 2, R27_0, 4 & 9, R29_0, 7 & 30

alpha background, BNC PB-4 pulser OFF, LEC/MEC slow comparator 0x64 (~1MeV)
Entry  Thu Nov 8 23:35:50 2018, OH, TD, CA, CB, Friday 9 November 23x
08:36 DAQ still running
      Not writing data to disk
Entry  Thu Nov 8 00:55:18 2018, CA, CB, TD, OH, Thursday 8th November 14x
09.57 DAQ still running (R29_29)
      System wide checks ok, except nnaida7 ADC calibration failure
      
Entry  Wed Nov 7 01:00:58 2018, CA, CB, TD, OH, PJW, Wednesday 7 November 13x
10.02 DAQ still running, on file Oct18/R27_9
      Merger and TapeServer ok, no error warnings in terminals
Entry  Tue Nov 6 00:13:00 2018, CB. PJW, TD, OH, CA, Tuesday 6 November 14x
09:13 DAQ still running R18_1
      Merger and TapeServer OK
      System wide checks ok, except for nnaida7 ADC calibration failure
Entry  Mon Nov 5 10:02:52 2018, TD, Offline analysis R16 - beam background 200.png201.png202.png203.png
Offline analysis of Oct18/R16_0 to 11

Entry  Mon Nov 5 01:40:10 2018, CA, CB, TD, OH, PJW, Monday 5 November 16x
10.40 Lowered slow comparator threshold from 100 to 10
      Good event statistics ok (attachment 1)
      System wide checks ok, except for nnaida7 ADC calibration failure
ELOG V3.1.4-unknown