AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 9 of 46  ELOG logo
Entry  Tue Mar 8 15:40:57 2016, TD, Tuesday 8 March 
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.705uA, ambient temperature +19.8 deg C
 
Entry  Tue Nov 6 00:13:00 2018, CB. PJW, TD, OH, CA, Tuesday 6 November 14x
09:13 DAQ still running R18_1
      Merger and TapeServer OK
      System wide checks ok, except for nnaida7 ADC calibration failure
Entry  Tue Jun 6 00:57:49 2017, PJW, TD, Tuesday 6 June 08.00-16.00 16x
08.57 Stop DAQ
      AIDA file RIBF128/R6_24
Entry  Tue Dec 6 02:20:29 2016, TD, Tuesday 6 December 100.png101.png102.pngAIDA_leakage_current(13).xlsx
11.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
      Ambient temperature +24.8 deg C, d.p. +3.6 deg C, RH 25.4%
Entry  Mon May 4 18:09:42 2015, JA, TD, AE, CG & JLT, Tuesday 5 May 2015 
02.09 R61 starts
      nnaida1, 2, 6, 10, 13 & 14 fast discs disabled
Entry  Tue Jun 4 07:10:27 2019, TD, Tuesday 4 June 13x
15.01 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 70% M-H markers - topup to 100% with 1x jugful water
      Temperature +25.8 deg C dew point +8.0 deg C RH 32.4%
Entry  Tue Oct 31 00:34:10 2017, TD, OH, Tuesday 31 October 8x
09.34 DAQ running OK - data transfer not enabled

      BNC PB-4
Entry  Tue May 31 08:06:43 2016, TD, AE & CG, Tuesday 31 May 2016 7x

Attachment 3 - AIDA discriminator with pulser ~5Hz
               standard ASIC settings (tau=8us, slow comparator 0x10, LEC/MEC comparator 0x9)
Entry  Mon May 29 16:02:21 2017, OH, TD, Tuesday 30th May 16x
00:02 Bias and leakage currents ok - attachment one
      System wide check all ok
      FEE64 Temperatures OK - see attachment 2
Entry  Mon Oct 29 23:40:41 2018, TD, OH, CA, Tuesday 30 October 16x
08.40 DAQ continues OK - current file Oct18/R9_15

08.42 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Tue May 30 07:56:05 2017, CB, NN, OH, AE, Tuesday 30 May - evening shift 7x
16.00   Still no beam  
        Current run /RIBF127R1/R1_197
        Found dropped channels on nnaida1, ASIC4 - see attach 1
Entry  Tue May 30 00:58:10 2017, TD, CB, Tuesday 30 May - day shift 27x
08.58 DAQ continues OK 
      File RIBF127R1/R1_99
      BigRIPS run 1009
Entry  Tue Aug 30 08:26:33 2016, TD, Tuesday 30 August 28x
16.18 R10 stops

      ASIC settings 2016Aug20-15.34.53
Entry  Tue Oct 3 09:14:59 2023, TD, Tuesday 3 October Screenshot_from_2023-10-03_11-49-17.pngScreenshot_from_2023-10-03_12-22-30.png

09.45 Power up
Entry  Tue May 3 07:51:04 2016, TD, Tuesday 3 May 2016 40.png41.png42.png
32x FEE64 re-programmed from version 7 to version 8 per instructions 

https://elog.ph.ed.ac.uk/AIDA/183
Entry  Tue Jul 3 02:24:45 2018, OH, Tuesday 3 July 180703_1023_bias.png180703_1025_FEETemp.png180703_1406_bias.png180703_1406_stats.png
10:23 Bias and leakage currents ok - attachment 1
      Fee temperatures ok - attachment 2
      System wide checks ok
Entry  Mon Nov 28 18:07:14 2016, CG, TD, AE, DK, Tuesday 29 November 42x
01:39 : Attachment 26 (R30_70to72) shows a gradual change in the hit pattern for DSSD2 (at the lower left
corner) which may indicate the noise level was increasing.
Entry  Tue Apr 28 06:25:13 2015, JA, LHB, TD, AE & CG, Tuesday 28th April progress 6x
28/04/15
1420: Carried out ASIC optimisation tests to find best shaping time. Chose system wide shaping time of 0x6.
           Waveforms of example FEEs/channels attachments 1-6.
Entry  Tue Mar 28 01:28:12 2017, TD, CG, OH, DK, Tuesday 28 March 15x

09.13 DAQ run R3 ends OK (final file R3_9)
      
Entry  Tue Jun 26 05:44:44 2018, OH, Tuesday 26 June 180526_1345_Bias.png180626_2152_bias.png
04:12 TD found the nnaida14 appeared to have become noisy at some point. Biases/;eakages/temps ok
      ASIC check load appears to have fixed problem
      Noise appears to affect R9_0 to R9_51
ELOG V3.1.3-7933898