Tue May 5 02:19:58 2015, j.Agramunt J.L.Tain K.Gabor , The Lower polyethylene pieces was swamped
|
The Lower polyethylene pieces was swamped.
In the photo beam comes from the left.
|
Tue Jun 13 07:35:35 2017, briken team, 133Ba calibration
|
After experiment 133Ba calibration
Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx |
Tue Jun 13 08:02:35 2017, briken team, 133Ba calibration
|
After experiment 133Ba calibration
Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx |
Mon Nov 28 05:59:28 2016, briken , run
|
======= START =======
Date 2016/11/28
Start time : 11:12
BRIKEN run : 056
Daq Conf. File : 161128Conf_BrikenFull.xlsx
DLT File name :
161128_1112
AIDA run : R28-0
AIDA start : 11:08
BigRIPS run : 1049
BigRIPS start : 09:15
---------------------------
Shifters: AT GK KD
=======
Setup =======
Central fragment: 41Al @F8
--- Degraders ---
Fixed: 3mm Pb between Musics chambers
Included lead shieldings around the beam.
|
Sat Apr 1 17:45:01 2017, YS,CG,LIU, 37Na, run 68
|
Date: 2/04/2017
Start:01:44
BRIKEN run: 68
|
Sat Apr 1 19:48:41 2017, YS,CG,LIU, 37Na,run 70
|
Date: 2/04/2017
Start:03:47
BRIKEN run: 70
|
Sat Apr 1 16:17:59 2017, YS,CG, LIU, 37Na run 67
|
Date: 2/04/2017
Start:00:17
BRIKEN run: 67
|
Sat Apr 1 21:37:42 2017, YS, Liu, CG, 37Na run 71
|
Date: 2/04/2017
Start:04:47
BRIKEN run: 71
|
Fri Mar 31 21:45:25 2017, YS, LIU, OH, DK, 37Na run 50
|
Date: 1/04/2017
Start: 05:45
BRIKEN run: 50
|
Fri Mar 31 19:31:15 2017, YS, LIU, OH, CG, 37Na, run47
|
Date: 1/04/2017
Start: 03:30
BRIKEN run: 47
|
Fri Mar 31 20:40:47 2017, YS, LIU, OH, 37Na run 48
|
Date: 1/04/2017
Start: 04:38
BRIKEN run: 48
|
Fri Mar 31 21:00:57 2017, YS, LIU, OH, 37Na run 49
|
Date: 1/04/2017
Start: 04:59
BRIKEN run: 49
|
Fri Mar 31 22:22:40 2017, YS, LIU, DK, 37Na run 51
|
Date: 1/04/2017
Start: 06:23
BRIKEN run: 51
|
Fri Mar 31 22:45:21 2017, YS, LIU, DK, 37Na run 52
|
Date: 1/04/2017
Start: 06:45
BRIKEN run: 52
|
Sat Apr 1 18:48:20 2017, YS, LIU, CG, 37Na run 69
|
Date: 2/04/2017
Start:02:47
BRIKEN run: 69
|
Sun May 28 11:41:24 2017, YS, CLOVER energy calibration
|
Clover calibration with 152Eu
Used peaks [keV]: 121.7817, 244.6975, 344.2785, 444.000, 778.9045, 867.378, 964.100, 1112.074, 1408.011
|
Mon May 29 04:17:34 2017, YS, Clover Efficiency  
|
Clover gamma detection efficiency calculation with 152Eu
Date of the measurement: 2017-05-26 10:15
root file: 170526_1015_152Eu_noAIDA_z0cm_014.root
|
Fri Dec 1 07:29:47 2017, Vi Ho Phong, [Hardware][Configuration] Return the PB-5 Pulse generator (Pulser 2) and the 428F Linear Fan in-out modules and replace with a new Linear Fan in-out module 7x
|
The PB-5 Pulse generator labeled "Pulser 2" and the 428F Linear Fan in-out labeled "Clover G7" from BRIKEN NIM crate have to be returned to the RIBF electronics
pool because the
borrowing time is expired.
|
Sat Apr 1 10:15:44 2017, VP,OH,JLT, 37Na run 60
|
Date: 1/04/2017
Start:17:40
BRIKEN run: 60
|
Sat Apr 1 10:26:07 2017, VP,OH,JLT, 37Na run 61
|
Date: 1/04/2017
Start:18:25
BRIKEN run: 61
|