ID |
Date |
Author |
Subject |
Text |
 |
215
|
Wed Mar 29 18:42:25 2017 |
RCF | 40Mg Run 003 |
Date: 30/03/2017
|
 |
214
|
Wed Mar 29 18:16:58 2017 |
RCF | 40Mg Run 002 |
Date: 30/03/2017
|
|
213
|
Wed Mar 29 17:15:21 2017 |
JLT | New Config file | New configuration file:
170330_Conf_BrikenFull.xlsx
|
|
212
|
Wed Mar 29 15:16:17 2017 |
Many | 40Mg Run 001 | Date: 29/03/2017
Start: 23:13
|
|
211
|
Wed Mar 29 14:14:58 2017 |
Many | 40Mg RUN 000 | Date: 29/03/2017
Start: 22:13
|
|
210
|
Wed Mar 29 13:31:37 2017 |
J Agramunt, R. Caballero, T. Davinson, C. Griffin, O. Hall, D. Kahl, G. Kiss, J. Liu, S. Nishimura, V. Phong, JL Tain | Start of parasitic | Start of parasitic Ca beam
(main experiment "New isotope search", Ahn
et al.)
|
|
209
|
Wed Mar 29 11:02:40 2017 |
PV, Liu, JA, JLT | F11 plastic | New calibration of F11 plastic
We decided to have both a low gain and a |
|
208
|
Wed Mar 29 07:34:16 2017 |
J. Agramunt | BrikenTools repository installed at d05 | The last version of Briken tools repository
has ben installed at d05, this repository
includes the Merger and the BrikenOffline |
|
207
|
Wed Mar 29 03:02:02 2017 |
J. Agramunt | Synchronization test procedure (update) | To Launch the processes:
Open 4 terminals:
|
|
206
|
Tue Mar 28 17:02:19 2017 |
DK | Applying Biases | Today, Gabor and I discussed with Nathan from
ORNL about the biasing system used for Ge,
3He, Plastic, and others. Phong is also |
|
205
|
Tue Mar 28 09:10:09 2017 |
Many | 152Eu | 152Eu source inside BRIKEN for CLOVER calibration.
Also calibration of Si-dE with 60Co source
and AIDA_PL calibration with 60Co source.
|
 |
204
|
Tue Mar 28 06:56:15 2017 |
PV, Liu, JA, JLT | F11 Plastic | Calibration of new F11 plastic
(see photo)
|
  |
203
|
Mon Mar 27 11:53:15 2017 |
PV,Liu | Turn on dE detector | We applied a bias voltage of 100 V to the
dE detector
Current read = 0.660 uA |
   |
202
|
Mon Mar 27 09:32:55 2017 |
JLT JA CG OH DK TD RC VP GK LJ SN | 252Cf | 252Cf at the center for BRIKEN calibration
|
  |
201
|
Mon Mar 27 03:50:13 2017 |
JLT JA CG OH DK TD RC VP SN | Background | Background measurement while they play with
the beam.
|
|
200
|
Sat Mar 25 13:42:23 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. Caballero | Background | BRIKEN system powered and DACQ started after
movement.
All looks fine.
|
|
199
|
Sat Mar 25 13:33:12 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. Caballero | BRIKEN+AIDA relocated | We moved AIDA+BRIKEN by 107cm upstream.
See attached photos.
|
 |
198
|
Fri Mar 24 03:28:39 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | Background | Background measurement overnight
Start: 19:45
|
|
197
|
Thu Mar 23 10:03:51 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | 252Cf | 252Cf source at the center for calibration
23/03/2017
|
|
195
|
Thu Mar 23 09:30:58 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | Power-up and 1st spectrum | Crates powered up.
DACQ started.
New directory: /data/1703Preparation/
|
|