Fri May 26 04:20:54 2017, JLT,AA,AT, CLOVER 60Co
|
60Co No AIDA, Efficiency calibration
Start: 12:21
|
Wed May 24 13:22:46 2017, JLT,AT,KR,SG,RY,..., CLOVER 152Eu
|
We connect the pulser to both CLOVERs
G7: It looks OK except for the G7-Green as before
|
Wed Jul 20 16:12:58 2016, S. Go, ..., CLOVER  
|
Mounting of the CLOVER detectors in position
CLOVER G7: right of beam
|
Wed Jul 20 16:40:57 2016, S. Go, J.Agramunt, A.Tolosa, J.L. Tain,..., CLOVER
|
Calibration and resolution check
CLOVER detectors were calibrated in energy with 60Co and 137Cs
|
Tue Oct 11 15:47:45 2016, N Brewer, S Go et al, CLOVER   
|
Both COVER detectors are installed in place.
See photos.
|
Thu Oct 13 04:36:58 2016, JL Tain et al, CLOVER
|
CLOVER energy calibration
Short run with 137Cs and 60Co sources at BRIKEN detector center
|
Thu Oct 13 23:38:26 2016, JL Tain et al, CLOVER  
|
Energy and efficiency calibration
We make calibrations for the remaining D4 CLOVER detector
|
Tue Nov 1 09:27:02 2016, Alvaro Tolosa, CLOVER 
|
Efficiency calibration
File "cloversEff.ods" and "cloversEff.xls" contains the experimental efficiency from different measurements
|
Wed Mar 29 07:34:16 2017, J. Agramunt, BrikenTools repository installed at d05
|
The last version of Briken tools repository has ben installed at d05, this repository includes the Merger and the BrikenOffline codes, as well as a CommonTools
folder to share scripts and code.
For update versions, just type in the desired directory "svn update". |
Wed Nov 9 02:02:22 2016, Iris, Boron rubber from India  
|
The boron rubber from India is BR-2871, price US-$ 2700 for 2pc 1m x 2m x 3.3mm.
52% B content, density 1.61 g/cm3 |
Fri May 8 03:20:48 2015, J.Agramunt J.L.Tain K.Gabor, BnCorrelation
|
We run all the night until the end of beam time, and the Bn correlations are more clear now. |
Fri Oct 26 15:15:55 2018, JA, ATS, ATD, JLT, AA, Background measurements
|
No pulser (inhibit in clock)
DLT: 181026_2244_Bkg_NoPulser_114.dlt
|
Sat Oct 21 17:30:23 2017, JA, ATD, JLT, Background measurement overnight  
|
22/10/2017
Start: 01:26
Run: 037
|
Tue Oct 16 09:00:02 2018, ATD & JLT, Background measurement overnight
|
18/10/16 START: 16:56
18/10/17 STOP: 9:51
|
Thu Nov 3 05:46:48 2016, Iris, Ale, Background measurement
|
Background measurement for threshold determination
|
Sat Nov 5 01:26:46 2016, Jose,Iris,Alvaro, Alejandro, Krzysztof, Background measurement 7x
|
Measurement overnight
Start: around 1:00
|
Thu May 25 14:31:46 2017, AT, JLT, AA, AIM, Background measurement 7x
|
Background, No AIDA
Start:22:31
|
Thu Nov 24 14:57:55 2016, AT, Background Beam ON 
|
Starting from today 12:22, the background generated by the different setups on BigRips is monitorized.
- 30 min aprox Beam off
|
Fri Nov 25 03:49:44 2016, AT, Background Beam ON
|
16/11/25 12h28min: Background measurement beam ON 19B |
Fri Nov 25 03:37:23 2016, AT, Background Beam OFF/ON  
|
16/11/24 21h06min: Background measurement Beam OFF + Beam ON tunning and 22C
21:41 : Until now Beam OFF, BigRips team tunning the machine. An online is saved
|