AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN, Page 13 of 21
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
411 Entries
Goto page
Previous
1
,
2
,
3
...
12
, 13,
14
...
19
,
20
,
21
Next
All
ID
Date
Author
Subject
Text
174
Sat Nov 26 16:21:08 2016
Briken collaboration
41Al run 2-15
13:08 Beam is still OFF. Background acquisition
is started.
Degrader:
173
Sat Nov 26 09:31:05 2016
Gabor Kiss, Ariel Tarifeno, Alvaro Tolosa
Output signals from G7Red
Preamplifier of crystal G7Red was replaced.
Output signals from G7Red are weird.
172
Sat Nov 26 06:37:37 2016
AT
41Al run 1
11:07 New acquisition is started for tungsten
degraders
1mm W + 1mm Al
171
Sat Nov 26 06:30:30 2016
AT
Setup
Setup for parasitic experiments
Energy 41Al @ F11 is around 145MeV/u
170
Sat Nov 26 00:15:12 2016
AT
41Al run0
08:15 BigRips tunning for centering 41Al.
Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
169
Sat Nov 26 00:04:15 2016
AT
Elog
RIKEN Elog during Fallon Parasitic experiments
Fallon Group:
168
Fri Nov 25 23:18:04 2016
BRIKEN collaboration
Fallon Parasitic experiments
===== START OF PARASITIC EXPERIMENTS ======
167
Fri Nov 25 21:50:42 2016
AT
New Conf File
161125Conf_BrikenFull.xlsx
166
Fri Nov 25 21:49:36 2016
AT
Background Beam OFF
21:27 Beam off. Background is started.
22:10 Acquisition is stopped. Files:
165
Fri Nov 25 21:48:49 2016
AT
DACQ
19:00 Test calibration
164
Fri Nov 25 21:47:05 2016
AT
Background Beam OFF
16:17 Background beam OFF
16:27 Beam On. Acquisition stopped just after
163
Fri Nov 25 03:49:44 2016
AT
Background Beam ON
16/11/25 12h28min: Background measurement
beam ON 19B
162
Fri Nov 25 03:41:40 2016
AT
Run setups
Run setups during preparation of Fallon Parasitic
experiments (Kanungo experiment beam time)
can be found on
161
Fri Nov 25 03:37:23 2016
AT
Background Beam OFF/ON
16/11/24 21h06min: Background measurement
Beam OFF + Beam ON tunning and 22C
160
Fri Nov 25 03:15:46 2016
AT
Background Beam ON
16/11/24 19h38min:
Background measurement during tunning of
BigRips from 27-29F to 22C is started.
159
Thu Nov 24 14:57:55 2016
AT
Background Beam ON
Starting from today 12:22, the background
generated by the different setups on BigRips
is monitorized.
158
Thu Nov 24 14:36:27 2016
AT
252Cf
Check of calibrations and rates for neutron
detectors with Conf File 161107Conf_BrikenFull.xlsx
157
Thu Nov 24 02:30:56 2016
CG
RIBF123R1 Local ELogs
PDFs of the local ELog for the RIBF123R1
experiment Nov 2016
9x
156
Tue Nov 22 10:22:07 2016
PV, Liu
No current observed when turning on the HV for the D4 Clover
19:00
We've turned on the High Voltage for the
D4 Clover up to ~ 1.5 kV.
155
Tue Nov 22 10:17:57 2016
ATS, PV, LIU
252Cf
Measurement with 252Cf at Z=22.5cm from the
moderator border, opposite side from AIDA.
Clovers and Veto detectors are turned off.
Goto page
Previous
1
,
2
,
3
...
12
, 13,
14
...
19
,
20
,
21
Next
All
ELOG V3.1.4-unknown