194
|
Thu Mar 23 09:04:38 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | Remove EURICA rails | We remove partially the floor rails of EURICA
to proof that it is possible to move BRIKEN |
  |
193
|
Thu Mar 23 09:01:33 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | ELOG Start Preparation | We started the preparation of 2017 campaign |
|
192
|
Fri Dec 9 05:25:26 2016 |
PV | Photo and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment | This Pb shielding structure is right behind
the variable degrader |
 |
191
|
Thu Dec 8 04:17:49 2016 |
PV | Installing BRIKEN ELOG 2016 in RIBF local network to a personal computer | All the RIBF123 elog website (including
Takechi and Fallon experiment) can be
downloaded and installed from the following |
|
190
|
Tue Nov 29 00:30:42 2016 |
PV,SN | Sillicon dE bias voltage increased | We increase the bias voltage of the dE
detector from 20 V to 100 V
Leakage current: |
|
189
|
Mon Nov 28 16:18:07 2016 |
AE | DAQ synchronization | Please see: https://elog.ph.ed.ac.uk/AIDA/493 |
|
188
|
Mon Nov 28 10:48:21 2016 |
JLT | Online analysis | Comparison of current spectra with spectra
from Takechi's run
|
|
187
|
Mon Nov 28 05:59:28 2016 |
briken | run |
======= START =======
Date 2016/11/28
Start
time : 11:12
BRIKEN run : 056
Daq Conf.
File : 161128Conf_BrikenFull.xlsx
DLT File |
|
186
|
Mon Nov 28 01:22:50 2016 |
BRIKEN collaboration | Elog RIBF123 & BigRIPS | Full RIB123 Elog entries for Takechi && Fallon
parasitic experiments
Update:03Dec16
|
6x |
185
|
Sun Nov 27 23:14:49 2016 |
BRIKEN coll | run 036 | ======= START =======
Date 2016/11/27
Start time : 19:28
|
|
184
|
Sun Nov 27 11:23:54 2016 |
PV, GK, AE, TD | 40Mg. Run 35 | ======= START =======
Date 2016/11/27
Start time : 18:59
|
|
183
|
Sun Nov 27 11:15:42 2016 |
PV, GK, AE, TD | 40Mg. Run 34 | ======= START =======
Date 2016/11/27
Start time : 17:29
|
|
182
|
Sun Nov 27 11:07:02 2016 |
PV, GK, AE, TD | 40Mg. Run 33 - junk | ======= START =======
Date 2016/11/27
Start time : 17:17
|
|
181
|
Sun Nov 27 10:47:20 2016 |
PV,TD,GK | 40Mg. Run 32 | ======= START =======
Date 2016/11/27
Start time : 16:20
|
|
180
|
Sun Nov 27 07:10:29 2016 |
BRIKEN colaboration | Run 31 | ======= START =======
Date 2016/11/27
Start time : 13:53
|
|
179
|
Sun Nov 27 04:38:15 2016 |
BRIKEN collaboration | Run 030 | ======= START =======
Date 2016/11/27
Start time : 10:41
|
|
178
|
Sun Nov 27 04:36:16 2016 |
BRIKEN collaboration | Run 020-023 | ======= START =======
Date 2016/11/26
Start time : 20:05
|
|
177
|
Sat Nov 26 20:50:13 2016 |
GK, AT&AT | run 16-19 | ======= START =======
Date 2016/11/26
Start time : 17:21
|
 |
176
|
Sat Nov 26 20:48:16 2016 |
BRIKEN collaboration | run | ===== Start of measurements 41Al ====== |
|
175
|
Sat Nov 26 16:54:17 2016 |
AT & AT | Clovers | Calibration of clovers |
|