Tue Oct 31 06:57:53 2017, OH, TD, AIDA Oct17 Beam Test Analysis
|
| PDF file attached with the preliminary analysis of the October 2017 AIDA in beam test. |
Sun May 3 10:10:13 2015, J.L. Tain, J. Agramunt, G. Kiss, 94Se setting measurement
|
94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
|
Wed May 6 05:10:14 2015, J.L. Tain, J. Agramunt, G. Kiss, 94Se setting measurement
|
After the long shutdown the beam is back at 00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat unstable (short time)
Measurement in the morning:
|
Tue Nov 8 14:28:54 2016, Many, 717273Ni run
|
F7 CH2 F11 C-6mm
Total degrader thickness 6mm
|
Tue Nov 8 15:10:24 2016, Many, 717273Ni Run
|
F7 OUT F11 C-6mm
Start: 00:09
|
Tue Nov 8 12:51:08 2016, Many, 717273Ni
|
After removing the lead wall.
Start: 21:45
|
Tue Nov 8 12:30:33 2016, Tain, Ale (who are not on shift), 71,72,73Ni run
|
71,72,73Ni run
We started at approximately 21:00, only online, not writing on tape.
|
Tue Nov 8 13:49:58 2016, Many, 71,72,73Ni
|
F7 CH2 F11 Empty
We remove the 8mm Al plate from inside BRIKEN infront of AIDA
|
Sat Nov 5 17:07:27 2016, Tain, Alvaro, Jorge, 62Ni in F7    
|
62Ni beam in F7 ON CH2 target
Strat with C target ladder in F11 in empty position.
|
Sat Nov 5 15:07:11 2016, Tain, Ale, 62Ni beam on F11 C-6mm    
|
62Ni on 6 mm C target between MUSICs
The background before was 0.36 neutrons/s
|
Sat Nov 5 16:27:13 2016, Tain,Ale,Jorge,Alvaro, 62Ni beam in F11 empty target
|
Empty position of the target ladder at F11
(hole is smaller than beam size)
|
Sun Nov 6 07:16:59 2016, Tain et al., 58Ni on F7 CH2 F11 empty/C6mm 
|
CH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later
|
Sun Nov 6 06:27:49 2016, Tain et al., 58Ni on F11 C-6mm in
|
New calibration in V_PL_T and V_PL_R (Energyx1/2)
Start: 15:15
|
Sun Nov 6 06:39:23 2016, Tain et al., 58Ni on F11 C-6mm
|
58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to 1MeV
|
Tue Nov 8 08:31:52 2016, Tain et al, 424344Ca run
|
Sequence of settings:
1) No target at F7 and Empty target at F11 (up to t=1E6ms)
2) No target at F7 and C-6mm target at F11 (up to t=5.1E6ms)
|
Sat Nov 26 00:15:12 2016, AT, 41Al run0
|
08:15 BigRips tunning for centering 41Al. Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
|
Sat Nov 26 16:21:08 2016, Briken collaboration, 41Al run 2-15
|
13:08 Beam is still OFF. Background acquisition is started.
Degrader:
3 mm Pb ONLY!
|
Sat Nov 26 06:37:37 2016, AT, 41Al run 1
|
11:07 New acquisition is started for tungsten degraders
1mm W + 1mm Al
0.5mm W + 1mm Al
|
Sun Nov 27 11:23:54 2016, PV, GK, AE, TD , 40Mg. Run 35
|
======= START =======
Date 2016/11/27
Start time : 18:59
|
Sun Nov 27 11:15:42 2016, PV, GK, AE, TD , 40Mg. Run 34
|
======= START =======
Date 2016/11/27
Start time : 17:29
|