AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 15 of 21  ELOG logo
Entry  Tue Oct 31 06:57:53 2017, OH, TD, AIDA Oct17 Beam Test Analysis AIDA_Test_Results.pdf
PDF file attached with the preliminary analysis of the October 2017 AIDA in beam test.
Entry  Sun May 3 10:10:13 2015, J.L. Tain, J. Agramunt, G. Kiss, 94Se setting measurement 
94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
Entry  Wed May 6 05:10:14 2015, J.L. Tain, J. Agramunt, G. Kiss, 94Se setting measurement 
After the long shutdown the beam is back at 00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat unstable (short time)
Measurement in the morning:
Entry  Tue Nov 8 14:28:54 2016, Many, 717273Ni run 
F7 CH2 F11 C-6mm
Total degrader thickness 6mm
Entry  Tue Nov 8 15:10:24 2016, Many, 717273Ni Run 
F7 OUT F11 C-6mm

Start: 00:09
Entry  Tue Nov 8 12:51:08 2016, Many, 717273Ni  
After removing the lead wall.

Start: 21:45
Entry  Tue Nov 8 12:30:33 2016, Tain, Ale (who are not on shift), 71,72,73Ni run 
71,72,73Ni  run

We started at approximately 21:00, only online, not writing on tape. 
Entry  Tue Nov 8 13:49:58 2016, Many, 71,72,73Ni 
F7 CH2 F11 Empty

We remove the 8mm Al plate from inside BRIKEN infront of AIDA
Entry  Sat Nov 5 17:07:27 2016, Tain, Alvaro, Jorge, 62Ni in F7 161106_0232_62Ni_F7_empty_Rates.pdf161106_0232_62Ni_F7_empty_F11.pdf161106_0232_62Ni_F7_empty_CorrBRF11R.pdf161106_0232_62Ni_F7_empty_VPL.pdf161106_0232_62Ni_F7_empty_CorrBRVPL.pdf
62Ni beam in F7 ON CH2 target

Strat with C target ladder in F11 in empty position.
Entry  Sat Nov 5 15:07:11 2016, Tain, Ale, 62Ni beam on F11 C-6mm 161106_0117_62Ni_F11_C6mm_Rates.pdf161106_0117_62Ni_F11_C6mm_F11.pdf161106_0117_62Ni_F11_C6mm_CorrBRF11R.pdf161106_0117_62Ni_F11_C6mm_VPL.pdf161106_0117_62Ni_F11_C6mm_CorrBRVPL.pdf
62Ni on 6 mm C target between MUSICs

The background before was 0.36 neutrons/s
Entry  Sat Nov 5 16:27:13 2016, Tain,Ale,Jorge,Alvaro, 62Ni beam in F11 empty target 
Empty position of the target ladder at F11
(hole is smaller than beam size)
Entry  Sun Nov 6 07:16:59 2016, Tain et al., 58Ni on F7 CH2 F11 empty/C6mm 161106_1725_58Ni_F7CH2_Rates.pdf161106_1725_58Ni_F7CH2_RatesRings.pdf
CH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later
Entry  Sun Nov 6 06:27:49 2016, Tain et al., 58Ni on F11 C-6mm in 
New calibration in V_PL_T and V_PL_R (Energyx1/2)

Start: 15:15
Entry  Sun Nov 6 06:39:23 2016, Tain et al., 58Ni on F11 C-6mm 161106_1609_58Ni_F11_empty_Rates.pdf
58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to 1MeV
Entry  Tue Nov 8 08:31:52 2016, Tain et al, 424344Ca run 
Sequence of settings:
1) No target at F7 and Empty target at F11 (up to t=1E6ms)
2) No target at F7 and C-6mm target at F11 (up to t=5.1E6ms)
Entry  Sat Nov 26 00:15:12 2016, AT, 41Al run0 161126_0815_000_RateBRIKEN.svg
08:15    BigRips tunning for centering 41Al. Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
Entry  Sat Nov 26 16:21:08 2016, Briken collaboration, 41Al run 2-15 
13:08 Beam is still OFF. Background acquisition is started.
Degrader:
3 mm Pb   ONLY!
Entry  Sat Nov 26 06:37:37 2016, AT, 41Al run 1 
11:07  New acquisition is started for tungsten degraders 
1mm W + 1mm Al
0.5mm W + 1mm Al 
Entry  Sun Nov 27 11:23:54 2016, PV, GK, AE, TD , 40Mg. Run 35  
=======    START    =======
Date 2016/11/27
Start time : 18:59
Entry  Sun Nov 27 11:15:42 2016, PV, GK, AE, TD , 40Mg. Run 34 
=======    START    =======
Date 2016/11/27
Start time : 17:29
ELOG V3.1.3-7933898