Entry  Mon Nov 7 04:49:57 2016, Tain, Ale, AIDA plastic (veto) and Si de calibration 
AIDA plastic (veto) and Si de calibration

For the calibration the Compton edge of the spectrum seen in the detectors was used.
Entry  Tue Oct 31 06:57:53 2017, OH, TD, AIDA Oct17 Beam Test Analysis AIDA_Test_Results.pdf
PDF file attached with the preliminary analysis of the October 2017 AIDA in beam test.
Entry  Sun May 3 10:10:13 2015, J.L. Tain, J. Agramunt, G. Kiss, 94Se setting measurement 
94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
Entry  Wed May 6 05:10:14 2015, J.L. Tain, J. Agramunt, G. Kiss, 94Se setting measurement 
After the long shutdown the beam is back at 00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat unstable (short time)
Measurement in the morning:
Entry  Tue Nov 8 14:28:54 2016, Many, 717273Ni run 
F7 CH2 F11 C-6mm
Total degrader thickness 6mm
Entry  Tue Nov 8 15:10:24 2016, Many, 717273Ni Run 
F7 OUT F11 C-6mm

Start: 00:09
Entry  Tue Nov 8 12:51:08 2016, Many, 717273Ni  
After removing the lead wall.

Start: 21:45
Entry  Tue Nov 8 12:30:33 2016, Tain, Ale (who are not on shift), 71,72,73Ni run 
71,72,73Ni  run

We started at approximately 21:00, only online, not writing on tape. 
Entry  Tue Nov 8 13:49:58 2016, Many, 71,72,73Ni 
F7 CH2 F11 Empty

We remove the 8mm Al plate from inside BRIKEN infront of AIDA
Entry  Sat Nov 5 17:07:27 2016, Tain, Alvaro, Jorge, 62Ni in F7 161106_0232_62Ni_F7_empty_Rates.pdf161106_0232_62Ni_F7_empty_F11.pdf161106_0232_62Ni_F7_empty_CorrBRF11R.pdf161106_0232_62Ni_F7_empty_VPL.pdf161106_0232_62Ni_F7_empty_CorrBRVPL.pdf
62Ni beam in F7 ON CH2 target

Strat with C target ladder in F11 in empty position.
Entry  Sat Nov 5 15:07:11 2016, Tain, Ale, 62Ni beam on F11 C-6mm 161106_0117_62Ni_F11_C6mm_Rates.pdf161106_0117_62Ni_F11_C6mm_F11.pdf161106_0117_62Ni_F11_C6mm_CorrBRF11R.pdf161106_0117_62Ni_F11_C6mm_VPL.pdf161106_0117_62Ni_F11_C6mm_CorrBRVPL.pdf
62Ni on 6 mm C target between MUSICs

The background before was 0.36 neutrons/s
Entry  Sat Nov 5 16:27:13 2016, Tain,Ale,Jorge,Alvaro, 62Ni beam in F11 empty target 
Empty position of the target ladder at F11
(hole is smaller than beam size)
Entry  Sun Nov 6 07:16:59 2016, Tain et al., 58Ni on F7 CH2 F11 empty/C6mm 161106_1725_58Ni_F7CH2_Rates.pdf161106_1725_58Ni_F7CH2_RatesRings.pdf
CH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later
Entry  Sun Nov 6 06:27:49 2016, Tain et al., 58Ni on F11 C-6mm in 
New calibration in V_PL_T and V_PL_R (Energyx1/2)

Start: 15:15
Entry  Sun Nov 6 06:39:23 2016, Tain et al., 58Ni on F11 C-6mm 161106_1609_58Ni_F11_empty_Rates.pdf
58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to 1MeV
Entry  Tue Nov 8 08:31:52 2016, Tain et al, 424344Ca run 
Sequence of settings:
1) No target at F7 and Empty target at F11 (up to t=1E6ms)
2) No target at F7 and C-6mm target at F11 (up to t=5.1E6ms)
Entry  Sat Nov 26 00:15:12 2016, AT, 41Al run0 161126_0815_000_RateBRIKEN.svg
08:15    BigRips tunning for centering 41Al. Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
Entry  Sat Nov 26 16:21:08 2016, Briken collaboration, 41Al run 2-15 
13:08 Beam is still OFF. Background acquisition is started.
Degrader:
3 mm Pb   ONLY!
Entry  Sat Nov 26 06:37:37 2016, AT, 41Al run 1 
11:07  New acquisition is started for tungsten degraders 
1mm W + 1mm Al
0.5mm W + 1mm Al 
Entry  Sun Nov 27 11:23:54 2016, PV, GK, AE, TD , 40Mg. Run 35  
=======    START    =======
Date 2016/11/27
Start time : 18:59