AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 15 of 21  ELOG logo
ID Date Author Subjectdown
  354   Tue Oct 31 06:57:53 2017 OH, TDAIDA Oct17 Beam Test Analysis
PDF file attached with the preliminary analysis of the October 2017 AIDA in beam test.
Attachment 1: AIDA_Test_Results.pdf
AIDA_Test_Results.pdf AIDA_Test_Results.pdf AIDA_Test_Results.pdf AIDA_Test_Results.pdf AIDA_Test_Results.pdf AIDA_Test_Results.pdf AIDA_Test_Results.pdf AIDA_Test_Results.pdf
  14   Sun May 3 10:10:13 2015 J.L. Tain, J. Agramunt, G. Kiss94Se setting measurement
94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
Ratio to 1st 110Zr: U=2.00,  D=1.89,  US=1.84
Notes:
-Compared to the 1st 94Se setting measurement (12:19-13:19)
there is a drop of 25% in the rate without apparent reason
  25   Wed May 6 05:10:14 2015 J.L. Tain, J. Agramunt, G. Kiss94Se setting measurement
After the long shutdown the beam is back at 00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat unstable (short time)
Measurement in the morning:
File: 150506_0846_0915_94Se.root
Average rate per tube (n/s): U=3.39 D=0.93B=0.40
Notes:
-The rate has increased by 3.5 in the detectors close to EURICA (!?)
-The rate at the detector below the MUSIC is substantial. 
From the different magnitudes it is clear that neutrons are originated
both outside and inside EURICA.
  143   Tue Nov 8 14:28:54 2016 Many717273Ni run
F7 CH2 F11 C-6mm
Total degrader thickness 6mm

Start:
RUN: 005
File: 161108_2251_717273Ni_005.dlt
Stop: 23:59
Run: 005

Rates:
F11R: 2600 cps
BRIKEN: 740 cps

Root file: 161109_0005_717273Ni.root


Counts: 
F11R: 5.36294e+06
BRIKEN: 1.42823e+06
Corr_BR_F11R: 1.41452e+06
  144   Tue Nov 8 15:10:24 2016 Many717273Ni Run
F7 OUT F11 C-6mm

Start: 00:09
Run: 006
DLT: 161108_2251_717273Ni_006.dlt

Rates:
F11R: 1200 cps
BRIKEN: 270 cps (22.5%)

They  were tuning during this run.

Stop: 0042

Root file: 161109_0042_717273Ni.root
  141   Tue Nov 8 12:51:08 2016 Many717273Ni
After removing the lead wall.

Start: 21:45
DLT: 161108_2145_717273Ni_001.dlt

During the first part we were changing the degrader.
Now they remove the C-6mm target.

So we increase the adjustable degrader to 5.4mm 
keeping the 8mm thick plate for implantation.

We stop and start a new DLT file at 22:02
DLT: 161108_2145_717273Ni_002.dlt
Stop: 22:48


NO ROOT FILE!
  140   Tue Nov 8 12:30:33 2016 Tain, Ale (who are not on shift)71,72,73Ni run
71,72,73Ni  run

We started at approximately 21:00, only online, not writing on tape. 

The lead is still in the way. We removed the degrader (fully) and the effect is a 5 % reduction of the neutron flux 
(determined using the rate of the rateF11/rateBRIKEN  before and after the change).
  142   Tue Nov 8 13:49:58 2016 Many71,72,73Ni
F7 CH2 F11 Empty

We remove the 8mm Al plate from inside BRIKEN infront of AIDA
Move AIDA to the central position. We put a 5mm Al plate in front
of the degrader.

Degrader 5.4mm + 5mm

Start: 22:51
DLT: 161108_2251_717273Ni_03.dlt

We remove some degrader:2.2mm off
Then we start a new run: 004

Stop:23:26
To put the C-6mm target in F11

ROOT file: 161108_2323_717273Ni.root
  116   Sat Nov 5 17:07:27 2016 Tain, Alvaro, Jorge62Ni in F7
62Ni beam in F7 ON CH2 target

Strat with C target ladder in F11 in empty position.
They changed to C 6mm after a while (5-10min) but we 
didnt realized that!

THERE ARE NO APPRECIABLE DIFFERENCES WITH THE C-TARGET IN OR OUT!

DLT: 161106_0210_62Ni_F7_empty_002.dlt
Start: 02:10
Stop: 02:32
tlife: 1292.80 s

ROOT file: 161106_0232_62Ni_F7_empty.root

Rates at 2:19
F3: 2800 cps
F11: 1200 cps
BRIKE: 32 cps
VPLT: 17 cps
VPLR: 1 cps

Counts:
RateBRIKEN: 47703 (36.9 cps)

RateF11R: 1688270 (1305.90 cps)

Corr_BR_F11R: 47603 
(all neutrons are correlated with a particle going through F11)

RateBRVPLT: 23826 (18.43 cps)
Corr_BR_VPLT: 7557 
(15.8% of the neutrons are correlated with a particle 
going through plastic veto top) 

RateBRVPLB: 1865 (1.44 cps)
(the rate is 12.8 times smaller than top detector)
Attachment 1: 161106_0232_62Ni_F7_empty_Rates.pdf
161106_0232_62Ni_F7_empty_Rates.pdf
Attachment 2: 161106_0232_62Ni_F7_empty_F11.pdf
161106_0232_62Ni_F7_empty_F11.pdf
Attachment 3: 161106_0232_62Ni_F7_empty_CorrBRF11R.pdf
161106_0232_62Ni_F7_empty_CorrBRF11R.pdf
Attachment 4: 161106_0232_62Ni_F7_empty_VPL.pdf
161106_0232_62Ni_F7_empty_VPL.pdf
Attachment 5: 161106_0232_62Ni_F7_empty_CorrBRVPL.pdf
161106_0232_62Ni_F7_empty_CorrBRVPL.pdf
  114   Sat Nov 5 15:07:11 2016 Tain, Ale62Ni beam on F11 C-6mm
62Ni on 6 mm C target between MUSICs

The background before was 0.36 neutrons/s
Now it is around 10 n/s
With 3100 counts/s at F3 we have of the order of 25 neutrons/s
There is an slightly higher than 10 factor between the rate of 
the plastic top and bottom (13 cts/s vs 1ct/s).
Rate at F11 (plastic) 900 cts/s.

We start a proper measurement with DLT
Reset Timestamp

They will measure with 6mm C target (between MUSICS) for 
about 45 minutes and then 15 min without target.
CH2 target at F7 is OUT (beam going directly to F11).

DLT: 161106_0026_62Ni_F11_C6mm_000
Run: 000

Start: 00:27
Stop: 01:17
tlife=3007 s

At 00:37
Rate at F3: 3000 cps
Rate at F11: 900 cps
Rate at BRIKEN: 25 n/s
Rate at VPLT:13 cps
Rate at VPLB: 0.8 cps

Root File: 161106_0117_62Ni_F11_C6mm.root


Figure with rates: F11 (black), BRIKEN (red), Clovers (green)
V_PL_T (blue), V_PL_B (pink)

Figure with F11 spectra: Right (red), Left (blue)

Figure with time correlation between F11 and BRIKEN
The number of correlations (integrated spectrum minus flat background)
is 73063 very close the number of detected neutrons 73899
The difference 833 agrees well with the expected number of background
neutrons. That is: for every neutron detected in BRIKEN there was an 
ion passing through F11 (!?).
There is a funny double structure in the first 20 microsec.
94% of the neutrons are detected within 200microsec

Figure with the spectra of Veto plastics Top (red) and
bottom (blue). There are 7.5 times more counts in T than in B.
One can see in the Top peaks at 3MeV and 12MeV 
(corrected from 6 and 25 MeV: wrong calibration!!)
and show signals up to very high energy (GeV)

Figure with the time correlation between Veto Plastics and BRIKEN
Top (red) Bottom (blue). There is a time correlation with Top veto plastic
for 15% of the neutrons in BRIKEN (11440). There  are 18 times less 
correlations with the Bottom plastic. 
WARNING: The correlation was done for signals above "20MeV"
in the V_PL_T spectra i.e. only including the second bump"
Attachment 1: 161106_0117_62Ni_F11_C6mm_Rates.pdf
161106_0117_62Ni_F11_C6mm_Rates.pdf
Attachment 2: 161106_0117_62Ni_F11_C6mm_F11.pdf
161106_0117_62Ni_F11_C6mm_F11.pdf
Attachment 3: 161106_0117_62Ni_F11_C6mm_CorrBRF11R.pdf
161106_0117_62Ni_F11_C6mm_CorrBRF11R.pdf
Attachment 4: 161106_0117_62Ni_F11_C6mm_VPL.pdf
161106_0117_62Ni_F11_C6mm_VPL.pdf
Attachment 5: 161106_0117_62Ni_F11_C6mm_CorrBRVPL.pdf
161106_0117_62Ni_F11_C6mm_CorrBRVPL.pdf
  115   Sat Nov 5 16:27:13 2016 Tain,Ale,Jorge,Alvaro62Ni beam in F11 empty target
Empty position of the target ladder at F11
(hole is smaller than beam size)

CH2 target at F7 is OUT

DLT 161106_0126_62Ni_F11_empty_001

Start: 01:26
Stop: 01:40

NO ROOT FILE!!

At 01:32:
Rate at F3: 2600 cps
Rate at F11: 850 cps
Rate at BRIKEN: 13 n/s
Rate at VPLT: 3 cps
Rate at VPLB: 0.1 cps
  120   Sun Nov 6 07:16:59 2016 Tain et al.58Ni on F7 CH2 F11 empty/C6mm
CH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later

Start: 16:16
Stop: 17:25

Change to C-6mm at 16:47 (at 544E6 ms in Timestamp units)

ROOT file: 161106_1725_58Ni_F7CH2.root

Rates:
F11R: 2000 cps
BRIKEN: 20 cps -> 35 cps
VPLT: 16 cps -> 40 cps
VPLB: 1.5 cps -> 5.5 cps

Figures Rate BRIKEN (red) Rate V_PL_T (blue)

Counts:
RateF11R: 8006721

RateBRIKEN: 111089 (1.4 neutron/100 particles)

Corr_BR_F11R: 108817 (98%)

RateBRVPLT: 115440

Corr_BR_VPLT: 21486 (19%)

RateBRVPLB: 16109
Attachment 1: 161106_1725_58Ni_F7CH2_Rates.pdf
161106_1725_58Ni_F7CH2_Rates.pdf
Attachment 2: 161106_1725_58Ni_F7CH2_RatesRings.pdf
161106_1725_58Ni_F7CH2_RatesRings.pdf
  118   Sun Nov 6 06:27:49 2016 Tain et al.58Ni on F11 C-6mm in
New calibration in V_PL_T and V_PL_R (Energyx1/2)

Start: 15:15
Stop: 15:35

File: 161106_1535_58Ni_F11_C6mm.root

Rates
F11_PL_R: 1300 cps
BRIKEN: 22 cps
V_PL_T: 7 cps
V_PL_B: 0.3 cps
  119   Sun Nov 6 06:39:23 2016 Tain et al.58Ni on F11 C-6mm
58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to 1MeV

Start: 15:37
Stop: 1609

ROOT file: 

They put the empty position of the F11 target ladder 
at 15:48. 
BRIKEN neutron count rate was reduced by a factor 2!
Also veto plastic det.
 
Rates:
F3: 4000 cps
F11_PL_R: 1350 cps
BRIKEN: 23 cps -> 14 cps
VPLT: 28 cps -> 12 cps
VPLB: 4 cps -> 1 cps

ROOT File: 161106_1609_58Ni_F11_empty.root

Figures Rate BRIKEN (red) Rate V_PL_T (blue)

Counts:
RateF11R: 2512767

RateBRIKEN: 30363 (1.2 neutron/100 particles)

Corr_BR_F11R: 29176 (96%)

RateBRVPLT: 31275

Corr_BR_VPLT: 5424 (17%)

RateBRVPLB: 3764
Attachment 1: 161106_1609_58Ni_F11_empty_Rates.pdf
161106_1609_58Ni_F11_empty_Rates.pdf
  137   Tue Nov 8 08:31:52 2016 Tain et al424344Ca run
Sequence of settings:
1) No target at F7 and Empty target at F11 (up to t=1E6ms)
2) No target at F7 and C-6mm target at F11 (up to t=5.1E6ms)
3) CH2 (10mm) target at F7 and C-6mm target at F11 (from t=5.3E6ms up to 6.8E6)
4) CH2 (10mm) target at F7 and Empty target at F11 (from t=6.8ms up to crash 7.1ms)

DAQ chash because start of Clover LN2 filling!
Counts accumulated in the the  same time channel at the end.

Start: 16:29 Run: 000
Stop: 18:28 Run: 000

DLT filename: 161108_1629_424344Ca_000.dlt
ROOT filename: 161108_1828_424344Ca.root
  170   Sat Nov 26 00:15:12 2016 AT41Al run0
08:15    BigRips tunning for centering 41Al. Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers

08:45    
Beam Off for intervention

08:50    
Degrader is modified to 3mm Pb

09:44    
Acquisition is stopped Files:
161126_0815_000.dlt
161126_0815_000.root

Rates:
BRIKEN	:  85.2 Hz
F11R	: 33.5 Hz

Daq Conf. File	: 161125Conf_BrikenFull.xlsx
Attachment 1: 161126_0815_000_RateBRIKEN.svg
161126_0815_000_RateBRIKEN.svg
  174   Sat Nov 26 16:21:08 2016 Briken collaboration41Al run 2-15
13:08 Beam is still OFF. Background acquisition is started.
Degrader:
3 mm Pb   ONLY!

13:25 Signal cables for clover G7 are connected, now G7 spectra are visible in ONLINE.

13:35 Beam Off!

14:00 Beam ON

15:08 Beam OFF, still problems with beam!

15:11 Beam ON 

15:18 Acquisition is stopped. Files 
   161126_1308_002.dlt to 161126_1308_015.dlt
   161126_1308_002.root (online)

Rates:
F11R	:  4.2 & 1.0  & 9.3 Hz
BRIKEN	:  150 & 12.9 & 160 Hz
  172   Sat Nov 26 06:37:37 2016 AT41Al run 1
11:07  New acquisition is started for tungsten degraders 
1mm W + 1mm Al
0.5mm W + 1mm Al 
3mm Pb (fixed on the beam)

11:14  Online is saved and then cleared
file:   161126_1107_001_1114.root

Rates:
F11R	:   10.5Hz
BRIKEN	:  170 Hz

11:18 Tungsten degraders are removed.

11:20 Beam Off

11:30 Beam ON

OBS:  Something happens in between with the beam intensity!!!  
Rates:
F11R	:   10.5Hz   &&  4.54 Hz
BRIKEN	:  177.7 Hz  && 160 Hz

11:41 Beam OFF

11:55 Acquisition is stopped. Files
 161126_1107_001.dlt  (full run)
 161126_1107_001.root  (Online from 11:18)
  184   Sun Nov 27 11:23:54 2016 PV, GK, AE, TD 40Mg. Run 35
=======    START    =======
Date 2016/11/27
Start time	: 18:59
BRIKEN run	: 035
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1859
AIDA run	: R23_0
AIDA start	: 19:19
BigRIPS run	: 40Mg-1034
BigRIPS start	: 18:33
 
---------------------------
Shifters:  PV, AE, GK, TD
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27
19:19: There is a transient, AIDA DAQ found stopped due the incompleted LN2 filling.

------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 035
BRIKEN stop	: 19:23
ROOT online	: 
AIDA run	: R23_4
AIDA stop	: 19:19
BigRIPS RUN	: 1034
  183   Sun Nov 27 11:15:42 2016 PV, GK, AE, TD 40Mg. Run 34
=======    START    =======
Date 2016/11/27
Start time	: 17:29
BRIKEN run	: 034
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1729
AIDA run	: R22_2
AIDA start	: 17:29
BigRIPS run	: 40Mg-1033
BigRIPS start	: 17:24
 
---------------------------
Shifters:  PV, AE, GK, TD
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27


------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 034
BRIKEN stop	: 18:28
ROOT online	: 
AIDA run	: R22_14
AIDA stop	: 
BigRIPS RUN	: 1033
ELOG V3.1.4-unknown