ID |
Date |
Author |
Subject |
354
|
Tue Oct 31 06:57:53 2017 |
OH, TD | AIDA Oct17 Beam Test Analysis |
PDF file attached with the preliminary analysis of the October 2017 AIDA in beam test. |
Attachment 1: AIDA_Test_Results.pdf
|
|
14
|
Sun May 3 10:10:13 2015 |
J.L. Tain, J. Agramunt, G. Kiss | 94Se setting measurement |
94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
Ratio to 1st 110Zr: U=2.00, D=1.89, US=1.84
Notes:
-Compared to the 1st 94Se setting measurement (12:19-13:19)
there is a drop of 25% in the rate without apparent reason |
25
|
Wed May 6 05:10:14 2015 |
J.L. Tain, J. Agramunt, G. Kiss | 94Se setting measurement |
After the long shutdown the beam is back at 00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat unstable (short time)
Measurement in the morning:
File: 150506_0846_0915_94Se.root
Average rate per tube (n/s): U=3.39 D=0.93B=0.40
Notes:
-The rate has increased by 3.5 in the detectors close to EURICA (!?)
-The rate at the detector below the MUSIC is substantial.
From the different magnitudes it is clear that neutrons are originated
both outside and inside EURICA. |
143
|
Tue Nov 8 14:28:54 2016 |
Many | 717273Ni run |
F7 CH2 F11 C-6mm
Total degrader thickness 6mm
Start:
RUN: 005
File: 161108_2251_717273Ni_005.dlt
Stop: 23:59
Run: 005
Rates:
F11R: 2600 cps
BRIKEN: 740 cps
Root file: 161109_0005_717273Ni.root
Counts:
F11R: 5.36294e+06
BRIKEN: 1.42823e+06
Corr_BR_F11R: 1.41452e+06 |
144
|
Tue Nov 8 15:10:24 2016 |
Many | 717273Ni Run |
F7 OUT F11 C-6mm
Start: 00:09
Run: 006
DLT: 161108_2251_717273Ni_006.dlt
Rates:
F11R: 1200 cps
BRIKEN: 270 cps (22.5%)
They were tuning during this run.
Stop: 0042
Root file: 161109_0042_717273Ni.root |
141
|
Tue Nov 8 12:51:08 2016 |
Many | 717273Ni |
After removing the lead wall.
Start: 21:45
DLT: 161108_2145_717273Ni_001.dlt
During the first part we were changing the degrader.
Now they remove the C-6mm target.
So we increase the adjustable degrader to 5.4mm
keeping the 8mm thick plate for implantation.
We stop and start a new DLT file at 22:02
DLT: 161108_2145_717273Ni_002.dlt
Stop: 22:48
NO ROOT FILE! |
140
|
Tue Nov 8 12:30:33 2016 |
Tain, Ale (who are not on shift) | 71,72,73Ni run |
71,72,73Ni run
We started at approximately 21:00, only online, not writing on tape.
The lead is still in the way. We removed the degrader (fully) and the effect is a 5 % reduction of the neutron flux
(determined using the rate of the rateF11/rateBRIKEN before and after the change). |
142
|
Tue Nov 8 13:49:58 2016 |
Many | 71,72,73Ni |
F7 CH2 F11 Empty
We remove the 8mm Al plate from inside BRIKEN infront of AIDA
Move AIDA to the central position. We put a 5mm Al plate in front
of the degrader.
Degrader 5.4mm + 5mm
Start: 22:51
DLT: 161108_2251_717273Ni_03.dlt
We remove some degrader:2.2mm off
Then we start a new run: 004
Stop:23:26
To put the C-6mm target in F11
ROOT file: 161108_2323_717273Ni.root |
116
|
Sat Nov 5 17:07:27 2016 |
Tain, Alvaro, Jorge | 62Ni in F7 |
62Ni beam in F7 ON CH2 target
Strat with C target ladder in F11 in empty position.
They changed to C 6mm after a while (5-10min) but we
didnt realized that!
THERE ARE NO APPRECIABLE DIFFERENCES WITH THE C-TARGET IN OR OUT!
DLT: 161106_0210_62Ni_F7_empty_002.dlt
Start: 02:10
Stop: 02:32
tlife: 1292.80 s
ROOT file: 161106_0232_62Ni_F7_empty.root
Rates at 2:19
F3: 2800 cps
F11: 1200 cps
BRIKE: 32 cps
VPLT: 17 cps
VPLR: 1 cps
Counts:
RateBRIKEN: 47703 (36.9 cps)
RateF11R: 1688270 (1305.90 cps)
Corr_BR_F11R: 47603
(all neutrons are correlated with a particle going through F11)
RateBRVPLT: 23826 (18.43 cps)
Corr_BR_VPLT: 7557
(15.8% of the neutrons are correlated with a particle
going through plastic veto top)
RateBRVPLB: 1865 (1.44 cps)
(the rate is 12.8 times smaller than top detector) |
Attachment 1: 161106_0232_62Ni_F7_empty_Rates.pdf
|
|
Attachment 2: 161106_0232_62Ni_F7_empty_F11.pdf
|
|
Attachment 3: 161106_0232_62Ni_F7_empty_CorrBRF11R.pdf
|
|
Attachment 4: 161106_0232_62Ni_F7_empty_VPL.pdf
|
|
Attachment 5: 161106_0232_62Ni_F7_empty_CorrBRVPL.pdf
|
|
114
|
Sat Nov 5 15:07:11 2016 |
Tain, Ale | 62Ni beam on F11 C-6mm |
62Ni on 6 mm C target between MUSICs
The background before was 0.36 neutrons/s
Now it is around 10 n/s
With 3100 counts/s at F3 we have of the order of 25 neutrons/s
There is an slightly higher than 10 factor between the rate of
the plastic top and bottom (13 cts/s vs 1ct/s).
Rate at F11 (plastic) 900 cts/s.
We start a proper measurement with DLT
Reset Timestamp
They will measure with 6mm C target (between MUSICS) for
about 45 minutes and then 15 min without target.
CH2 target at F7 is OUT (beam going directly to F11).
DLT: 161106_0026_62Ni_F11_C6mm_000
Run: 000
Start: 00:27
Stop: 01:17
tlife=3007 s
At 00:37
Rate at F3: 3000 cps
Rate at F11: 900 cps
Rate at BRIKEN: 25 n/s
Rate at VPLT:13 cps
Rate at VPLB: 0.8 cps
Root File: 161106_0117_62Ni_F11_C6mm.root
Figure with rates: F11 (black), BRIKEN (red), Clovers (green)
V_PL_T (blue), V_PL_B (pink)
Figure with F11 spectra: Right (red), Left (blue)
Figure with time correlation between F11 and BRIKEN
The number of correlations (integrated spectrum minus flat background)
is 73063 very close the number of detected neutrons 73899
The difference 833 agrees well with the expected number of background
neutrons. That is: for every neutron detected in BRIKEN there was an
ion passing through F11 (!?).
There is a funny double structure in the first 20 microsec.
94% of the neutrons are detected within 200microsec
Figure with the spectra of Veto plastics Top (red) and
bottom (blue). There are 7.5 times more counts in T than in B.
One can see in the Top peaks at 3MeV and 12MeV
(corrected from 6 and 25 MeV: wrong calibration!!)
and show signals up to very high energy (GeV)
Figure with the time correlation between Veto Plastics and BRIKEN
Top (red) Bottom (blue). There is a time correlation with Top veto plastic
for 15% of the neutrons in BRIKEN (11440). There are 18 times less
correlations with the Bottom plastic.
WARNING: The correlation was done for signals above "20MeV"
in the V_PL_T spectra i.e. only including the second bump" |
Attachment 1: 161106_0117_62Ni_F11_C6mm_Rates.pdf
|
|
Attachment 2: 161106_0117_62Ni_F11_C6mm_F11.pdf
|
|
Attachment 3: 161106_0117_62Ni_F11_C6mm_CorrBRF11R.pdf
|
|
Attachment 4: 161106_0117_62Ni_F11_C6mm_VPL.pdf
|
|
Attachment 5: 161106_0117_62Ni_F11_C6mm_CorrBRVPL.pdf
|
|
115
|
Sat Nov 5 16:27:13 2016 |
Tain,Ale,Jorge,Alvaro | 62Ni beam in F11 empty target |
Empty position of the target ladder at F11
(hole is smaller than beam size)
CH2 target at F7 is OUT
DLT 161106_0126_62Ni_F11_empty_001
Start: 01:26
Stop: 01:40
NO ROOT FILE!!
At 01:32:
Rate at F3: 2600 cps
Rate at F11: 850 cps
Rate at BRIKEN: 13 n/s
Rate at VPLT: 3 cps
Rate at VPLB: 0.1 cps |
120
|
Sun Nov 6 07:16:59 2016 |
Tain et al. | 58Ni on F7 CH2 F11 empty/C6mm |
CH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later
Start: 16:16
Stop: 17:25
Change to C-6mm at 16:47 (at 544E6 ms in Timestamp units)
ROOT file: 161106_1725_58Ni_F7CH2.root
Rates:
F11R: 2000 cps
BRIKEN: 20 cps -> 35 cps
VPLT: 16 cps -> 40 cps
VPLB: 1.5 cps -> 5.5 cps
Figures Rate BRIKEN (red) Rate V_PL_T (blue)
Counts:
RateF11R: 8006721
RateBRIKEN: 111089 (1.4 neutron/100 particles)
Corr_BR_F11R: 108817 (98%)
RateBRVPLT: 115440
Corr_BR_VPLT: 21486 (19%)
RateBRVPLB: 16109 |
Attachment 1: 161106_1725_58Ni_F7CH2_Rates.pdf
|
|
Attachment 2: 161106_1725_58Ni_F7CH2_RatesRings.pdf
|
|
118
|
Sun Nov 6 06:27:49 2016 |
Tain et al. | 58Ni on F11 C-6mm in |
New calibration in V_PL_T and V_PL_R (Energyx1/2)
Start: 15:15
Stop: 15:35
File: 161106_1535_58Ni_F11_C6mm.root
Rates
F11_PL_R: 1300 cps
BRIKEN: 22 cps
V_PL_T: 7 cps
V_PL_B: 0.3 cps |
119
|
Sun Nov 6 06:39:23 2016 |
Tain et al. | 58Ni on F11 C-6mm |
58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to 1MeV
Start: 15:37
Stop: 1609
ROOT file:
They put the empty position of the F11 target ladder
at 15:48.
BRIKEN neutron count rate was reduced by a factor 2!
Also veto plastic det.
Rates:
F3: 4000 cps
F11_PL_R: 1350 cps
BRIKEN: 23 cps -> 14 cps
VPLT: 28 cps -> 12 cps
VPLB: 4 cps -> 1 cps
ROOT File: 161106_1609_58Ni_F11_empty.root
Figures Rate BRIKEN (red) Rate V_PL_T (blue)
Counts:
RateF11R: 2512767
RateBRIKEN: 30363 (1.2 neutron/100 particles)
Corr_BR_F11R: 29176 (96%)
RateBRVPLT: 31275
Corr_BR_VPLT: 5424 (17%)
RateBRVPLB: 3764 |
Attachment 1: 161106_1609_58Ni_F11_empty_Rates.pdf
|
|
137
|
Tue Nov 8 08:31:52 2016 |
Tain et al | 424344Ca run |
Sequence of settings:
1) No target at F7 and Empty target at F11 (up to t=1E6ms)
2) No target at F7 and C-6mm target at F11 (up to t=5.1E6ms)
3) CH2 (10mm) target at F7 and C-6mm target at F11 (from t=5.3E6ms up to 6.8E6)
4) CH2 (10mm) target at F7 and Empty target at F11 (from t=6.8ms up to crash 7.1ms)
DAQ chash because start of Clover LN2 filling!
Counts accumulated in the the same time channel at the end.
Start: 16:29 Run: 000
Stop: 18:28 Run: 000
DLT filename: 161108_1629_424344Ca_000.dlt
ROOT filename: 161108_1828_424344Ca.root |
170
|
Sat Nov 26 00:15:12 2016 |
AT | 41Al run0 |
08:15 BigRips tunning for centering 41Al. Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
08:45
Beam Off for intervention
08:50
Degrader is modified to 3mm Pb
09:44
Acquisition is stopped Files:
161126_0815_000.dlt
161126_0815_000.root
Rates:
BRIKEN : 85.2 Hz
F11R : 33.5 Hz
Daq Conf. File : 161125Conf_BrikenFull.xlsx |
Attachment 1: 161126_0815_000_RateBRIKEN.svg
|
|
174
|
Sat Nov 26 16:21:08 2016 |
Briken collaboration | 41Al run 2-15 |
13:08 Beam is still OFF. Background acquisition is started.
Degrader:
3 mm Pb ONLY!
13:25 Signal cables for clover G7 are connected, now G7 spectra are visible in ONLINE.
13:35 Beam Off!
14:00 Beam ON
15:08 Beam OFF, still problems with beam!
15:11 Beam ON
15:18 Acquisition is stopped. Files
161126_1308_002.dlt to 161126_1308_015.dlt
161126_1308_002.root (online)
Rates:
F11R : 4.2 & 1.0 & 9.3 Hz
BRIKEN : 150 & 12.9 & 160 Hz |
172
|
Sat Nov 26 06:37:37 2016 |
AT | 41Al run 1 |
11:07 New acquisition is started for tungsten degraders
1mm W + 1mm Al
0.5mm W + 1mm Al
3mm Pb (fixed on the beam)
11:14 Online is saved and then cleared
file: 161126_1107_001_1114.root
Rates:
F11R : 10.5Hz
BRIKEN : 170 Hz
11:18 Tungsten degraders are removed.
11:20 Beam Off
11:30 Beam ON
OBS: Something happens in between with the beam intensity!!!
Rates:
F11R : 10.5Hz && 4.54 Hz
BRIKEN : 177.7 Hz && 160 Hz
11:41 Beam OFF
11:55 Acquisition is stopped. Files
161126_1107_001.dlt (full run)
161126_1107_001.root (Online from 11:18) |
184
|
Sun Nov 27 11:23:54 2016 |
PV, GK, AE, TD | 40Mg. Run 35 |
======= START =======
Date 2016/11/27
Start time : 18:59
BRIKEN run : 035
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1859
AIDA run : R23_0
AIDA start : 19:19
BigRIPS run : 40Mg-1034
BigRIPS start : 18:33
---------------------------
Shifters: PV, AE, GK, TD
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
2016/11/27
19:19: There is a transient, AIDA DAQ found stopped due the incompleted LN2 filling.
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/27
BRIKEN run : 035
BRIKEN stop : 19:23
ROOT online :
AIDA run : R23_4
AIDA stop : 19:19
BigRIPS RUN : 1034 |
183
|
Sun Nov 27 11:15:42 2016 |
PV, GK, AE, TD | 40Mg. Run 34 |
======= START =======
Date 2016/11/27
Start time : 17:29
BRIKEN run : 034
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1729
AIDA run : R22_2
AIDA start : 17:29
BigRIPS run : 40Mg-1033
BigRIPS start : 17:24
---------------------------
Shifters: PV, AE, GK, TD
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
2016/11/27
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/27
BRIKEN run : 034
BRIKEN stop : 18:28
ROOT online :
AIDA run : R22_14
AIDA stop :
BigRIPS RUN : 1033 |