AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 16 of 21  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sat Nov 5 01:25:24 2016, Tain et al, End of Beam Line Setup 9x
Some photos of the elements in the last part of the beam line
during Takechi run.
Entry  Fri Nov 4 13:16:42 2016, JLTain,ATolosa,JAgramunt, Neutron Background Screenshot_from_2016-11-04_22-26-10.pngScreenshot_from_2016-11-04_22-35-46.pngScreenshot_from_2016-11-04_22-35-29.pngScreenshot_from_2016-11-04_22-43-32.png
Beam tuning in BigRIPS

At 19:00 access to Exp. Area was closed and the tuning
Entry  Thu Nov 3 05:27:48 2016, Alvaro, Tain, Gabor, Ale, 152Eu  161103_1426_152Eu.root
Energy calibration for clovers, 152Eu

    Reply  Fri Nov 4 03:37:27 2016, Roger Caballero, Energy calibration for Ge clovers 20161104-HpGe-EnergyCal.pdf
Energy Calibration: See attached pdf

Detector Slope Offset
Entry  Thu Nov 3 23:28:01 2016, A. Tolosa, BRIKEN Bkg + 152Eu 161104_0826_152Eu.png161104_0826_152Eu_CLOVERS.png
Measurement over night with a 152Eu source inside

Start: 22:48 (03/11/2016)
Entry  Thu Nov 3 15:09:52 2016, A. Tarifeno-Saldivia, C. Domingo-Pardo, J.L. Tain, BRIKEN neutron efficiency BRIKEN_hybrid140.svgEfficiency_vs_Energy_HybridConf_140b.svgBRIKEN_hybrid140_efficiency.xlsx
Geant4 BRIKEN Neutron efficiency calculations as a function of neutron energy and for some spectra: Ga84-vandle, Br88-endf71, Rb94-endf71, Rb95-endf71,
I137-endf71, Cf252-MCNPX
  
Entry  Thu Nov 3 14:02:49 2016, Nepal, J Ha, PV, Liu J, The degrader system has been set IMG_1318.JPGIMG_1317.JPG
We used the laser to align the degrader (see attached photos)

According to the LISE calculation, equivalent effective thickness for 6 mm of Carbon target is 4.5 mm thick Aluminum.

Therefore, we've set the degrader system as follow:
Entry  Thu Nov 3 05:46:48 2016, Iris, Ale, Background measurement 
Background measurement for threshold determination

Entry  Thu Nov 3 04:46:24 2016, Alvaro Tolosa, 252Cf 161103_1319_252Cf.root
Check of BRIKEN calibration and thresholds

Source more or less at the center
Entry  Thu Nov 3 04:40:02 2016, All, START 161103Conf_BrikenFull.xlsx
Start of commissioning preparation

Entry  Tue Nov 1 09:27:02 2016, Alvaro Tolosa, CLOVER cloversEff.xlscloversEff.ods
Efficiency calibration

File "cloversEff.ods" and "cloversEff.xls" contains the experimental efficiency from different measurements
    Reply  Tue Nov 1 13:00:55 2016, Roger Caballero, Eff callibration parameters for G7-Clover G7-Blue.pdfG7-Green.pdfG7-Red.pdfG7-Black.pdf
Efficiency calibration for the G7 clover (data acquired in July).
The attached plots show the parameters for the Jackel function (E[i]=Energy) using the points of a 152Eu source.
    Reply  Wed Nov 2 01:19:46 2016, Roger Caballero, Eff callibration parameters for D4-Clover D4-Black.pdfD4-Red.pdfD4-Green.pdfD4-Blue.pdf
Efficiency calibration for the D4 clover (data acquired in October).
The attached plots show the parameters for the Jackel function (E[i]=Energy) using the points of 152Eu, 60Co and 137Cs sources.
    Reply  Wed Nov 2 02:26:22 2016, Roger Caballero, Efficiency callibration calculator (Excel file) cloversEff.xls
Attached the updated excel file. In the first sheet there is the calculator to calculate the efficiency from an given energy.

The Jackel function used is:
Entry  Mon Oct 31 23:56:37 2016, J. Agramunt, First AIDA BRIKEN correlation plot FirstAIDA_BRIKENPlot.pdf
From the 252Cf data.
Entry  Tue Oct 18 09:41:43 2016, Alvaro Tolosa, 2016 - July, Logbook 16Jul_logbook.pdf
Paper logbook for July-2016
For correct visualization, 
please download it.
Entry  Tue Oct 18 09:36:07 2016, Alvaro Tolosa, 2016-Oct, Logbook 16Oct_logbook.pdf
Paper logbook for October-2016
For correct visualization, 
please download it.
Entry  Mon Oct 17 05:21:46 2016, Phong, Liu J J, dE detector position and output signal from preamplifier 137CsTest_ac.JPGdE_position.JPGdc.JPG
dE detector is mounted onto the back side of the shielding (attached photo: dE_position.JPG)

The detector consists of 26 strips. In this setup, the detector is devided into 2 parts corresponding to 2 readout channels. Each part consists of 13 strips
Entry  Sun Oct 16 13:30:43 2016, All, END Sashimi.jpg
... and sashimi (see photo)

The detectors (BRIKEN tubes, CLOVER, VETO detectors, AIDA) 
Entry  Sun Oct 16 12:58:34 2016, All, BRIKEN Shielding-BRIKEN-AIDA.jpgShielding-BRIKEN.jpgShieldingPlates.jpg
Installation of BRIKEN PE shielding for beam
related neutrons
Entry  Fri Oct 14 14:06:38 2016, All, First measurement of BRIKEN and AIDA 161014Conf_BrikenFull.xlsx
Friday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common clock.
Entry  Fri Oct 14 13:32:52 2016, NT BREWER, S Go, JM Allmond, Ge preamp power loss and solution.  
As previously recorded (81), on Thur Oct 13th, A NIM crate failure caused preamp power loss to the HPGe's. While D4 recovered with nominally the
same resolution as before. G7 would not recieve power to the preamps without an alarm from the NIM crate.

It was determined that there was a short along the lines of +12V and Ground , -12V and Ground, and between +-12V.
Entry  Fri Oct 14 04:42:40 2016, JL Tain et al, Electronics D4All-CsCo-zoom-newlineCL.pdfBRIKEN-newlineCL.pdf
Change of main power line for MPOD and CLOVER preamp

Entry  Fri Oct 14 04:12:50 2016, JL Tain et al, CONF 
New configuration file: 
161014Conf_BrikenFull.xlsx
ELOG V3.1.4-unknown