  31   Sat Jul 9 21:00:54 2016 J.L. TainHardwareA list of the available hardware  Hardware.xlsxHardware.pdf 
  30   Sat Jul 9 20:44:31 2016 J.L. TainBRIKEN neutron detectorSTART
Assembly and commissioning of BRIKEN neutron
detector 
  
  29   Mon May 11 09:14:54 2015 G. Kiss252Cf_data_sheetThe activity of the 252Cf source, used
for the calibration was 3.7 MBq at 15.05.2006.
Unfortunately, uncertainty is missing from
 252Cf_15_05_2006_3p7MBq.jpg 
  28   Fri May 8 03:20:48 2015 J.Agramunt J.L.Tain K.GaborBnCorrelationWe run all the night until the end of beam
time, and the Bn correlations are more clear
now.
 BnCorr.pdf 
  27   Thu May 7 08:36:56 2015 J.L. Tain, J. Agramunt, A. Estrade, G.Kiss, T. Davinson, C.GriffinFirst BRIKEN_v.0 beta-delayed neutron correlations?During the 98,100Kr setting run we observe

in the time correlation plot (middle right
 Screenshot_from_2015-05-07_16_01_27.png 
  26   Wed May 6 11:41:24 2015 J. Agramunt, A. EstradeFirst online combined analysisScreen shot of the rudimentary on-line
analysis of the combined data:
BRIKEN-AIDA-BigRIPS
 Screenshot_from_2015-05-06_19_12_29.png 
  25   Wed May 6 05:10:14 2015 J.L. Tain, J. Agramunt, G. Kiss94Se setting measurementAfter the long shutdown the beam is back at
00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat
  
  24   Wed May 6 04:57:24 2015 J.L. Tain, J. Agramunt, G. KissNew degrader thicknessThe Al degrader thickness was reduced to 4.8mm   
  23   Tue May 5 05:29:26 2015 J.L. Tain, J. Agramunt, G. KissAmbient background measurementBeam still down. New background measurement
with new RIKEN tube below the MUSIC chamber
  
  22   Tue May 5 05:17:36 2015 J.L. Tain, J. Agramunt, G. KissAmbient background measurement

Failure of
a quadrupole triplet at BigRIPS (some time
after earthquake)

We take the chance of
  
  21   Tue May 5 05:04:00 2015 J.L. Tain, J. Agramunt, G. KissChange of degrader thicknessFor EURICA measurements degrader thickness
were increased
trying to decrease MACI and AIDA trigger
  
  20   Tue May 5 02:19:58 2015 j.Agramunt J.L.Tain K.Gabor The Lower polyethylene pieces was swampedThe Lower polyethylene pieces was swamped.
In the photo beam comes from the
left.
 photo-4.JPG 
  19   Mon May 4 15:03:47 2015 J.Agramunt J.L.Tain K.Gabor New detector placed under the beam line New detector placed under the beam
line, below MUSIC chamber
This detector replace the USA tubes
 photo_2-2.JPGphoto_1-2.JPGphoto_3-2.JPG 
  18   Mon May 4 04:14:18 2015 J.Agramunt J.L.Tain K.GaborAIDA trigger plugged in Mod2 Ch12AIDA trigger plugged in Mod2 Ch12   
  17   Mon May 4 03:20:00 2015 Shunji NishimuraRNC New RuleWe have some new rule about the data taken
at RNC from this year. 
Shunji
 kanri_e.pdf 
  16   Mon May 4 02:36:16 2015 J.Agramunt J.L.Tain K.GaborMaki trigger plugged in Mod2 Ch9    
  15   Mon May 4 02:26:14 2015 J.Agramunt J.L.Tain K.GaborF11 trigger plugged in Mod2 Ch16 of Briken daq    
  14   Sun May 3 10:10:13 2015 J.L. Tain, J. Agramunt, G. Kiss94Se setting measurement94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
  
  13   Sun May 3 10:07:25 2015 J.L. Tain, J. Agramunt, G. KissPhotos of new PE shieldingPhotos of the general arrangement and details
of the new PE blocks
 20150502_195020.jpg20150502_194340.jpg20150502_192253.jpg 
  12   Sun May 3 09:04:07 2015 J.L. Tain, J. Agramunt, G. KissSummary of neutron measurements
U: (Up: 2 RIKEN tubes at 40cm from AIDA)
D: (Down: 12 RIKEN tubes at 80cm from AIDA)
  