ID |
Date |
Author |
Subject |
Text |
 |
31
|
Sat Jul 9 21:00:54 2016 |
J.L. Tain | Hardware | A list of the available hardware |
 |
30
|
Sat Jul 9 20:44:31 2016 |
J.L. Tain | BRIKEN neutron detector | START
Assembly and commissioning of BRIKEN neutron
detector
|
|
29
|
Mon May 11 09:14:54 2015 |
G. Kiss | 252Cf_data_sheet | The activity of the 252Cf source, used
for the calibration was 3.7 MBq at 15.05.2006.
Unfortunately, uncertainty is missing from |
|
28
|
Fri May 8 03:20:48 2015 |
J.Agramunt J.L.Tain K.Gabor | BnCorrelation | We run all the night until the end of beam
time, and the Bn correlations are more clear
now. |
|
27
|
Thu May 7 08:36:56 2015 |
J.L. Tain, J. Agramunt, A. Estrade, G.Kiss, T. Davinson, C.Griffin | First BRIKEN_v.0 beta-delayed neutron correlations? | During the 98,100Kr setting run we observe
in the time correlation plot (middle right |
|
26
|
Wed May 6 11:41:24 2015 |
J. Agramunt, A. Estrade | First online combined analysis | Screen shot of the rudimentary on-line
analysis of the combined data:
BRIKEN-AIDA-BigRIPS
|
|
25
|
Wed May 6 05:10:14 2015 |
J.L. Tain, J. Agramunt, G. Kiss | 94Se setting measurement | After the long shutdown the beam is back at
00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat |
|
24
|
Wed May 6 04:57:24 2015 |
J.L. Tain, J. Agramunt, G. Kiss | New degrader thickness | The Al degrader thickness was reduced to 4.8mm |
|
23
|
Tue May 5 05:29:26 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Ambient background measurement | Beam still down. New background measurement
with new RIKEN tube below the MUSIC chamber
|
|
22
|
Tue May 5 05:17:36 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Ambient background measurement |
Failure of
a quadrupole triplet at BigRIPS (some time
after earthquake)
We take the chance of |
|
21
|
Tue May 5 05:04:00 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Change of degrader thickness | For EURICA measurements degrader thickness
were increased
trying to decrease MACI and AIDA trigger |
|
20
|
Tue May 5 02:19:58 2015 |
j.Agramunt J.L.Tain K.Gabor | The Lower polyethylene pieces was swamped | The Lower polyethylene pieces was swamped.
In the photo beam comes from the
left. |
|
19
|
Mon May 4 15:03:47 2015 |
J.Agramunt J.L.Tain K.Gabor | New detector placed under the beam line | New detector placed under the beam
line, below MUSIC chamber
This detector replace the USA tubes |
  |
18
|
Mon May 4 04:14:18 2015 |
J.Agramunt J.L.Tain K.Gabor | AIDA trigger plugged in Mod2 Ch12 | AIDA trigger plugged in Mod2 Ch12 |
|
17
|
Mon May 4 03:20:00 2015 |
Shunji Nishimura | RNC New Rule | We have some new rule about the data taken
at RNC from this year.
Shunji |
|
16
|
Mon May 4 02:36:16 2015 |
J.Agramunt J.L.Tain K.Gabor | Maki trigger plugged in Mod2 Ch9 | |
|
15
|
Mon May 4 02:26:14 2015 |
J.Agramunt J.L.Tain K.Gabor | F11 trigger plugged in Mod2 Ch16 of Briken daq | |
|
14
|
Sun May 3 10:10:13 2015 |
J.L. Tain, J. Agramunt, G. Kiss | 94Se setting measurement | 94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
|
|
13
|
Sun May 3 10:07:25 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Photos of new PE shielding | Photos of the general arrangement and details
of the new PE blocks |
  |
12
|
Sun May 3 09:04:07 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Summary of neutron measurements |
U: (Up: 2 RIKEN tubes at 40cm from AIDA)
D: (Down: 12 RIKEN tubes at 80cm from AIDA)
|
|