ID |
Date |
Author |
Subject |
Text |
 |
11
|
Sat May 2 19:32:08 2015 |
AE | transfer data AIDA->BRIKEN | A test program for online data transfer is
available in aidas1 PC at:
|
|
10
|
Sat May 2 03:52:14 2015 |
J.L. Tain | 3He tube description | 3He tube drawings and technical details:
RIKEN, UPC, GSI, ORNL-1, ORNL-2 |
   |
9
|
Mon Apr 27 10:18:21 2015 |
K.Gabor S.Nishimura J.Agramunt | ORNL 3He tube at RIKEN | |
|
8
|
Mon Apr 27 04:40:43 2015 |
G. Kiss, J. Agramunt | neutron background at Eurica | Based on an about 8h long background measurement,
the neutron background at the Eurica site
was found to be about 0.006 neutron / sec |
|
7
|
Sat Apr 25 08:25:42 2015 |
G. Kiss, J. Agramunt | BRIKEN Test setup | Altogether 16 tubes are mounted for
the parasitic detector test (see the attached
photos): |
   |
6
|
Wed Feb 25 07:38:42 2015 |
A. Estrade J. Agramunt | Usage of synchronization test programs | In order to access to the synchronization
test, we prepare two programs in the PC
briken1 ( 10.32.6.54). |
 |
5
|
Tue Feb 24 09:34:54 2015 |
J. Agramunt, H. Baba, A. Estrade | [DAQ] DAQ correlation test |
We have performed a successful test of the
integration of independent DAQ systems based |
   |
4
|
Mon Feb 16 00:29:00 2015 |
Gabor KISS | Polyethyelene | The polyethelene arrived at RIKEN. Except
4 neighboring holes (located at the inner
ring) the alignment is OK. |
 |
3
|
Fri Oct 31 12:58:49 2014 |
Robert Grzywacz | Entry test - preamps | Here is a picture of one of our Mesytec preamplifiers.
We have located all seven of them.
They have 16 input channels and a common |
|
2
|
Fri Oct 31 11:36:57 2014 |
Alfredo Estrade | BRIKEN elog: take 2 | A elog for the setup of the
BRIKEN detector is now operational at |
|
1
|
Fri Oct 31 09:47:59 2014 |
Alfredo Estrade | BRIKEN elog: Hello world! | A elog for the setup of the BRIKEN detector
is now operational at https://elog.ph.ed.ac.uk/BRIKEN/
We have setup |
|