ID |
Date |
Author |
Subject |
Text |
 |
419
|
Thu Nov 22 07:01:36 2018 |
AT | PID high mass seting (165Pm) - RIBF148 | PID plot for the high mass setting (165Pm),
run 2018, rare earth peak experiment.
Partial statistics (~30h) from identification |
|
418
|
Tue Nov 6 21:51:54 2018 |
NT Brewer | New D4Off.conf for HV also on github |
V A V/s
V/s 1/0
------
--------------- --------- ----- ---- ------- |
|
417
|
Mon Nov 5 22:47:40 2018 |
AT, JR, FM, PA | Low threshold, 252Cf, z=0cm, perpendicular 0 deg | 252Cf at z=0cm, i.e 0 cm from the center of
the detector, source axis perpendicular
at 0 deg
|
|
416
|
Mon Nov 5 21:24:20 2018 |
AT, JR, FM, PA | Low threshold, 252Cf, z=25cm, perpendicular 90 deg | 252Cf at z=25cm, i.e 25 cm from the center
of the detector, source axis perpendicular
at 90 deg
|
|
415
|
Mon Nov 5 19:55:20 2018 |
AT, JR, FM, PA | Low threshold, 252Cf, z=0cm, perpendicular 90 deg | 252Cf at z=0cm, i.e 0 cm from the center of
the detector, source axis perpendicular
at 90 deg
|
|
414
|
Mon Nov 5 18:52:54 2018 |
MW, KR | suspicious clover G7 temp sensor |
|
|
413
|
Mon Nov 5 18:05:48 2018 |
AT, JR, FM, PA | Low threshold, 252Cf, z=25cm, perpendicular 0 deg | 252Cf at z=25cm, i.e 25 cm from the center
of the detector, source axis perpendicular
|
|
412
|
Mon Nov 5 16:43:43 2018 |
FM, PA, | Low threshold, 252Cf, z=25cm, Parallel downstream | 252Cf at z=25cm, i.e 25 cm from the center
of the detector, source axis parallel downstream
|
|
411
|
Mon Nov 5 15:10:43 2018 |
FM, PA, | Low threshold, 252Cf, z=15cm, Parallel downstream | 252Cf at z=15cm, i.e 15 cm from the center
of the detector, source axis parallel downstream
|
|
410
|
Mon Nov 5 13:43:57 2018 |
FM, PA | Low threshold, 252Cf, z=0cm, Parallel downstream | 252Cf at z=0cm,ie center of moderator, source
axis parallel downstream
Low threshold.
|
|
409
|
Mon Nov 5 12:04:08 2018 |
FM, PA, AT | Low threshold, 252Cf, z=15cm, Perpendicular 0deg | 252Cf at z=15cm,ie center of moderator, source
axis perpendicular at 0deg (typical orientation)
Low threshold.
|
|
408
|
Mon Nov 5 09:59:36 2018 |
MW, KR | suspicious clover G7 temp sensor | We observed 6 pm LN2 filling of both clovers
on Monday Nov 5th.
D4 went full within reasonable |
|
407
|
Mon Nov 5 09:32:00 2018 |
FM, JR, PA, AT | Low threshold, 252Cf, z=0cm, Perpendicular 0deg | 252Cf at z=0cm,ie center of moderator, source
axis perpendicular at 0deg (typical orientation)
Low threshold.
|
|
406
|
Mon Nov 5 06:46:30 2018 |
KR, YR, MW, JLT, ... | Clover check |
With detectors still on the floor we check
signals and found
|
 |
405
|
Fri Nov 2 14:18:54 2018 |
JLT | 136Sn at ZDS | Measurement of neutron background while
Jungclaus experiment is running
Secondary beam 136Sn at ~140MeV/u, Be target, |
|
404
|
Fri Nov 2 01:07:21 2018 |
JLT | 134Sn/133In on ZDS | Measurement of neutron background while
Jungclaus experiment is running
Secondary beam:
|
  |
403
|
Wed Oct 31 03:41:33 2018 |
JLT | 134Sn at ZDS | Measurement of neutron background while
Jungclaus experiment is running
Secondary beam 134Sn at ~140MeV/u, Au target, |
|
402
|
Wed Oct 31 00:36:34 2018 |
JLT | 133In at ZDS | Measurement of neutron background while
Jungclaus experiment is running
Secondary beam 134Sn at XXMeV, Be target, |
|
401
|
Tue Oct 30 01:01:42 2018 |
JLT, AA | Adjustment of 3He thresholds | Background with BigRIPS+ZD already working
No pulser
|
 |
400
|
Mon Oct 29 12:08:12 2018 |
JR, JA, AT | Background |
Background was measurement
Pulser: NO
|
|
399
|
Sun Oct 28 07:41:03 2018 |
AT, JA, AA | Background | Dacq was reinitialized
Background was measurement
Pulser: YES
|
|
398
|
Fri Oct 26 15:15:55 2018 |
JA, ATS, ATD, JLT, AA | Background measurements |
No pulser (inhibit in clock)
DLT: 181026_2244_Bkg_NoPulser_114.dlt
|
|
397
|
Fri Oct 26 03:57:37 2018 |
ATS & JLT | Background | Background BRIKEN control measurement
No DLT
|
|
396
|
Fri Oct 26 03:31:33 2018 |
AT2 & JA | Test pulser effect on baseline | We have tested possible change of the baseline
in the digitizer due to the pulser connection.
NO EFFECT has been
|
6x |
395
|
Fri Oct 26 03:24:25 2018 |
ATS & JLT | Background | Background BRIKEN control measurement
No DLT
|
|
394
|
Thu Oct 25 16:08:53 2018 |
ATS & JLT | Lead bricks | Lead bricks in BRIKEN hole to protect AIDA |
|
393
|
Thu Oct 25 16:04:17 2018 |
ATS & JLT | Background | Background BRIKEN control measurement
No DLT
|
|
392
|
Thu Oct 25 09:32:25 2018 |
AT & AT | Low threshold, 252Cf, z=25cm, Perpendicular 90deg | 252Cf at z=25cm,ie 25 cm upstream the beam,
source axis perpendicular at 90deg with respect
to typical
|
|
391
|
Thu Oct 25 09:18:24 2018 |
ATS & JLT | F11 plastic | F11 plastic (long plastic after MUSIC chamber)
connected to DACQ.
|
|
390
|
Thu Oct 25 09:07:00 2018 |
ATS & JLT | BRIKEN Calibration check | We put the 252Cf source and check the aligment
of 3He tubes gains:
|
|
389
|
Thu Oct 25 04:14:00 2018 |
AT & AT | Low threshold, 252Cf, z=25cm, Perpendicular 90deg | 252Cf at z=25cm,ie 25 cm upstream the beam,
source axis perpendicular at 90deg with respect
to typical
|
|
388
|
Thu Oct 25 00:53:43 2018 |
AT & AT | Low threshold, 252Cf, z=-25cm, Perpendicular 90deg | 252Cf at z=-25cm,ie 25 cm downstream the beam,
source axis perpendicular at 90deg with respect
to typical
|
|
387
|
Wed Oct 24 16:11:32 2018 |
AT & AT | Low threshold, 252Cf, z=-25cm | 252Cf at z=-25cm,ie 25 cm downstream the beam,
source axis parallel.
Low threshold.
|
|
386
|
Wed Oct 24 11:28:42 2018 |
AT & AT | Low threshold, 252Cf, z=-25cm | 252Cf at z=-25cm,ie 25 cm downstream, source
axis perpendicular, typical orientation.
Low threshold.
|
|
385
|
Wed Oct 24 11:27:51 2018 |
AT & AT | Low threshold, 252Cf, z=10cm, source axis parallel | 252Cf at z=10cm, source axis parallel upstream
to the beam.
Low threshold.
|
|
384
|
Wed Oct 24 07:42:42 2018 |
AT & AT | Low threshold, 252Cf, z=10cm, source axis parallel | 252Cf at z=10cm, source axis parallel upstream
to the beam.
Low threshold.
|
|
383
|
Wed Oct 24 03:49:01 2018 |
AT & AT | Low threshold, 252Cf, z=0cm | 252Cf at z=10cm, source axis perpendicular
to beam axis, typical orientation.
Low threshold.
|
|
382
|
Mon Oct 22 16:54:10 2018 |
AT & AT | background, low threshold, No Pulser | 18/10/23 START: 00:53
18/10/24 STOP: 10:12
Background measurements. Checking noise!
|
|
381
|
Mon Oct 22 11:42:50 2018 |
AT & AT | 252Cf, z=25cm, no clovers | 252Cf source placed using cardboard piece
at z=25cm, source axis parallel upstream
to the beam axis.
|
|
380
|
Mon Oct 22 08:15:52 2018 |
AT & AT | 252Cf, z=15cm, no clovers | 252Cf source placed using cardboard piece
at z=15cm, source axis parallel to the beam
axis.
|
|
379
|
Mon Oct 22 03:11:32 2018 |
AT & AT | background, high threshold, Pulser UPC | 18/10/22 START: 11:13
18/10/22 STOP: 15:59
Background measurements. Checking noise!
|
|
378
|
Sun Oct 21 15:16:40 2018 |
AT & AT | background, high threshold, Pulser RIKEN+ORNL | 18/10/21 START: 23:16
18/10/22 STOP: 11:06
Background measurements. Checking noise!
|
|
377
|
Sun Oct 21 11:18:31 2018 |
AT & AT | Low threshold, NO pulser, 252Cf, z=0cm | 18/10/21 START: 19:21
18/10/21 STOP: 23:04
252Cf at z=0cm, source axis perpendicular |
|
376
|
Sun Oct 21 08:58:23 2018 |
AT & AT | background, high threshold, NO pulser | 18/10/21 START: 16:58
18/10/21 STOP: 19:09
Background measurements. Checking noise!
|
|
375
|
Sun Oct 21 06:04:43 2018 |
AT & AT | background, high threshold | 18/10/21 START: 14:10
18/10/21 STOP: 16:41
Background measurements. Checking noise!
|
|
374
|
Sun Oct 21 03:19:54 2018 |
AT & AT | background, high threshold |
18/10/20 START: 20:30 approx
18/10/21 STOP: 11:20
|
|
373
|
Fri Oct 19 15:38:11 2018 |
AT & AT | 252Cf, z=0cm, no clovers, noise check individual tubes |
18/10/19 START: 23:39
18/10/20 STOP: 18:30
|
|
372
|
Fri Oct 19 11:45:12 2018 |
AT & AT | 252Cf, z=0cm, no clovers |
18/10/19 START: 19:46
18/10/19 STOP: 23:33
|
|
371
|
Fri Oct 19 11:28:31 2018 |
AT & AT | 252Cf, z=0cm, no clovers, test online dead time | During previous measurement a high dead time
in the online was observed (50%). after restarting
the crates and
|
|
370
|
Fri Oct 19 10:27:22 2018 |
AT & AT | 252Cf, z=0cm, no clovers (***** CHECK DATA) |
18/10/19 START: 18:25
18/10/19 STOP: 19:19
|
|
369
|
Fri Oct 19 04:02:36 2018 |
AT & AT | 252Cf, z=0cm, no clovers (***** CHECK DATA) |
18/10/19 START: 12:05
18/10/19 STOP: 16:44
|
|
368
|
Fri Oct 19 00:28:48 2018 |
AT2, JLT, SN | background measurement, no clovers |
18/10/19 START: 08:31
18/10/19 STOP: 10:50
|
 |
367
|
Thu Oct 18 15:24:40 2018 |
AT2, JLT, SN | 252Cf long measure, z=25cm beam upstream, no clovers |
18/10/18 START: 23:23
18/10/19 STOP: 08:23
|
|
366
|
Thu Oct 18 12:16:39 2018 |
AT2, JLT, SN | 252Cf long measure, z=15cm beam upstream, no clovers |
18/10/18 START: 20:20
18/10/18 STOP: 23:17
|
|
365
|
Thu Oct 18 08:21:18 2018 |
AT2, JLT, SN | 252Cf long measure, z=0cm, no clovers |
18/10/18 START: 17:22
18/10/18 STOP: 20:09
|
|
364
|
Thu Oct 18 03:11:56 2018 |
AT & AT | bck meas | 18/10/18 START: 10:54
18/10/1X STOP: 14:02
|
|
363
|
Thu Oct 18 00:31:55 2018 |
AT & AT | 252Cf long measure, z=0cm, threshold 5% lower | 18/10/18 START: 08:31
18/10/18 STOP: 10:50
|
|
362
|
Wed Oct 17 14:11:18 2018 |
AT & AT | 252Cf long measure, z=0cm, threshold 5% lower |
18/10/17 START: 22:04
18/10/17 STOP: 08:18
|
|
361
|
Wed Oct 17 09:20:20 2018 |
AT & AT | 252Cf long measure | 18/10/17 START: 18:16
18/10/17 STOP: 22:00
|
|
360
|
Tue Oct 16 09:00:02 2018 |
ATD & JLT | Background measurement overnight |
18/10/16 START: 16:56
18/10/17 STOP: 9:51
|
|
359
|
Tue Oct 16 08:57:56 2018 |
ATD & JLT | 252Cf source | 252Cf source Run
START:?
STOP: 16:56
|
|
358
|
Tue Oct 16 03:15:03 2018 |
ATD & JLT | Start of REP run preparation (RIBF148) | 16-Oct-2018
- Start DACQ computer: OK!
|
|
357
|
Fri Dec 1 07:29:47 2017 |
Vi Ho Phong | [Hardware][Configuration] Return the PB-5 Pulse generator (Pulser 2) and the 428F Linear Fan in-out modules and replace with a new Linear Fan in-out module | The PB-5 Pulse generator labeled "Pulser 2"
and the 428F Linear Fan in-out labeled "Clover
G7" from BRIKEN NIM crate have to be returned |
7x |
356
|
Fri Nov 24 00:45:36 2017 |
AT | ur17b BRIKEN files | List of files in BRIKEN DAQ PC:
Experiment DA1702 (including the test with |
|
355
|
Thu Nov 16 02:32:23 2017 |
BRIKEN collaboration | YSO thresholds | YSO Tests
Thresholds & calibrations
|
|
354
|
Tue Oct 31 06:57:53 2017 |
OH, TD | AIDA Oct17 Beam Test Analysis | PDF file attached with the preliminary analysis
of the October 2017 AIDA in beam test. |
|
353
|
Fri Oct 27 10:04:31 2017 |
SG, RY | LISE++ file for BRIKEN1 | Here attached the lise file for BRIKEN1 |
 |
352
|
Thu Oct 26 09:01:53 2017 |
BCR | Number of Counts vs Expected Efficiency for Proposals |
Here is a doc with an estimate
of the statistical uncertainty P1n and P2n |
|
351
|
Wed Oct 25 19:14:09 2017 |
NB | First pass efficiency for current experiment | I roughly (~10%) checked the efficiency
for 4 of the peaks from 171025_1222_1355_152EuCloverCal.root.
I checked the peaks at 122, 245, |
|
350
|
Wed Oct 25 18:12:43 2017 |
Sunflower collaboration | Gamma sources web page | http://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html |
|
349
|
Wed Oct 25 17:49:09 2017 |
JT, AM, NB, DS, DM, AT | pulser in CLOVERS | G7 pulser weird behavior
|
|
348
|
Wed Oct 25 01:02:14 2017 |
RG | Status of the YSO array | The presently used detector has 48x48x5
mm3 YSO array with 1x1mm2 segments. They
are separated with ESR. We use H8500 |
|
347
|
Tue Oct 24 13:14:47 2017 |
RY | Calibration data for clovers | for energy calibration with 152Eu source
171024_1858_152Eu_G7.root
171024_2112_152Eu_D4.root |
 |
346
|
Tue Oct 24 03:08:23 2017 |
RG, RY, MS, JA, RCF, SG, AT | light pulser YSO | light pulser measurement
SN's pulse generator 20ns width |
 |
345
|
Mon Oct 23 09:43:00 2017 |
RG, RY, MS, SG, AT | 137Cs YSO | measurement of 137Cs with YSO
after matching the gains of the
HighGain channels
|
   |
344
|
Sun Oct 22 11:32:59 2017 |
JA,ATD, JLT | New Gasific Configuration file | |
|
343
|
Sun Oct 22 11:14:35 2017 |
JA,ATD,JLT,RG,RY,SG,MS,PV,Liu,KR | 252Cf source Wasabi-BrikenYSO | 252Cf source in the middle of Wasabi and YSO
in front of Clover D4
|
|
342
|
Sun Oct 22 10:26:44 2017 |
JA,ATD,JLT,RG,RY,SG,MS,PV,Liu,KR | First Wasabi-YSO-BRIKEN correlation test | 60Co source between YSO and Wasabi in front
of D4 Clover
Briken configuration file: 171022_1811_Conf_BrikenFullYSO.xlsx |
 |
341
|
Sun Oct 22 08:52:17 2017 |
KR,JA,ATD,JLT | Clover resolution | Resolution check using 40K 1460 keV line
in the background measurement overnight
(File: 171022_0126_1101_bck.root)
|
|
340
|
Sun Oct 22 05:15:26 2017 |
RG,RY,MS,ATD,JA,JLT | Check of YSO | We start a systematic check of YSO in BRIKEN
DACQ
|
12x |
339
|
Sat Oct 21 17:30:23 2017 |
JA, ATD, JLT | Background measurement overnight | 22/10/2017
Start: 01:26
Run: 037
|
  |
338
|
Sat Oct 21 17:14:55 2017 |
JA, ATD, JLT | 252Cf efficiency calibration | Measurement of BRIKEN neutron counter efficiency
252Cf source in the (approximately) center
Wasabi and D4 clover inserted. G7 on the |
|
337
|
Sat Oct 21 17:11:03 2017 |
JA, ATD, JLT | New Gasific configuration file | Configuration file saved on 22-Oct-2017 at
00:59
after increasing all the threshold in all |
|
336
|
Sat Oct 21 17:05:21 2017 |
JA,ATD, JLT | New DACQ hardware configuration | Configuration of BRIKEN DACQ hardware:
Detector->VME->ADC->Channel
|
|
335
|
Sat Oct 21 07:26:13 2017 |
NB, RY, BD, MS | Corrected Calibration D4 | K R G B
m 0.001558636 0.0006599344 0.0015311753 0.0015807021
b -0.6545742444 0.4330534066 2.001278013 1.0994163913
|
|
334
|
Sat Oct 21 04:18:17 2017 |
NB | Draft of Instructions for HV | Setup:
|
|
333
|
Fri Oct 20 08:27:05 2017 |
BC Rasco | Analysis Slides | Here are the ORNL/UTK BRIKEN analysis slides
presented by BC Rasco on 2017/10/20.
|
|
332
|
Fri Oct 20 05:33:11 2017 |
KR, NB, SG, RY, JL, AT: | Calibration and Resolution of D4 (after Repair) | Green and Red channels were repaired by
crimping and securing the grounding of the
cables and fixing the cables securely to |
 |
331
|
Wed Oct 18 08:46:23 2017 |
NB, SG, AT, JL | Clover G7 resolution | G7 clover was on the stand
Source: 152Eu
File: 171018_1627_152Eu_G7.root
|
|
330
|
Mon Oct 16 05:52:14 2017 |
BRIKEN collaboration | START preparation | We start to check every thing for the coming
run
|
|
329
|
Thu Jun 15 10:07:56 2017 |
BRIKEN collaboration | Gamma calibrations | Clover calibrations.
- Datafiles are located in the
dac computer, path: |
  |
328
|
Thu Jun 15 03:40:17 2017 |
BRIKEN collaboration | Z-scaning 252Cf Jun17 | A scaning with 252Cf along the Z-axis of
the neutron detector is carried out. The
setup is similar to the scaning carried out |
|
327
|
Wed Jun 14 06:22:21 2017 |
Ariel, Liu, Go, Nishinmura | HV is off | To protect HPGe and 3He tubes from high
intentsity primary beam, HV of these detector
are off and the HPGe will be dismounted. |
|
326
|
Tue Jun 13 08:02:35 2017 |
briken team | 133Ba calibration | After experiment 133Ba calibration
Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx |
|
325
|
Tue Jun 13 07:35:35 2017 |
briken team | 133Ba calibration | After experiment 133Ba calibration
Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx |
|
324
|
Tue Jun 13 06:50:12 2017 |
Briken Colaboration | 152Eu calibration | After experiment 152Eu calibration
|
|
323
|
Tue Jun 13 05:18:07 2017 |
PV | How to install ELOG for BRIKEN campaign 2017a | Get ELOG software including entries for BRIKEN
campaign 2017a from mars computer:
|
|
322
|
Mon Jun 12 22:28:02 2017 |
Oscar | The SUSHIRO app guide | It's here...it's rough...but it hopefully
gets the job done |
|
321
|
Mon Jun 12 02:45:44 2017 |
Iris Dillmann AT | Setup detectors. Id of Ancillary@BRIKEN | Attachment 1: Setup detectors
Attachment 2: example of configuration file
(valid only for RIBF127). The Id of the ancillary |
 |
320
|
Mon Jun 12 02:38:27 2017 |
JA AA AIM AT AT | VME crate & new configuration | Sun Jun 4 2017 11:16:45 VME crate #1 crashed
New configuration file of BRIKEN
|
|
Draft
|
Mon May 29 07:06:56 2017 |
K. Matsui | Energy loss in Long Plastic Scintillator | After Al degrader with the optimized width
of 13 mm, the energy loss in Long Plastic
Scintillator is 546(2) MeV at F11. |
|
Draft
|
Mon May 29 05:40:49 2017 |
K. Matsui | energy loss at logn | |
|
317
|
Mon May 29 04:17:34 2017 |
YS | Clover Efficiency | Clover gamma detection efficiency calculation
with 152Eu
Date of the measurement: 2017-05-26 10:15
|
  |
316
|
Sun May 28 11:41:24 2017 |
YS | CLOVER energy calibration | Clover calibration with 152Eu
Used peaks [keV]: 121.7817, 244.6975, 344.2785, |
|
315
|
Sat May 27 11:19:57 2017 |
AIM, AT | AIDA+BRIKEN background | Background measurement AIDA+BRIKEN
AIDA is inside BRIKEN
|
|
314
|
Sat May 27 10:36:20 2017 |
JA,AT,JLT | BRIKEN DACQ | Manuals for BRIKEN DACQ:
GasificShort.pdf including "Run protocol"
and Gasific70Manual.pdf (long) |
 |
312
|
Sat May 27 04:46:55 2017 |
AIM | sources info | Here is the sunflower webpage with information
on the calibration sources:
|
|
311
|
Fri May 26 14:42:12 2017 |
JL, AT | Background | Background measurement (no AIDA)
|
|
310
|
Fri May 26 14:27:08 2017 |
AIM, AT | BRIKEN Configuration File | New configuration file of BRIKEN
Changes of 26th-May-2017
Previous config file 24th-May-2017
|
|
308
|
Fri May 26 09:07:46 2017 |
J. Agramunt | Synchronization Monitoring | We started the synchronization monitoring
programs to check that
it is OK as can be seen in the figure below
|
 |
307
|
Fri May 26 04:20:54 2017 |
JLT,AA,AT | CLOVER 60Co | 60Co No AIDA, Efficiency calibration
Start: 12:21
|
|
306
|
Fri May 26 03:52:23 2017 |
AT,AA,JLT | CLOVER, 137Cs | 137Cs, No AIDA, Efficiency calibration
Source ID: 393
|
|
305
|
Fri May 26 03:24:38 2017 |
GK,VP, AT, AA | CLOVER, 133Ba | 133Ba source efficiency calibration, no AIDA
Start: 11:23
|
|
304
|
Fri May 26 02:17:40 2017 |
AT, AIM, JLT,AA, PV, KM | 152Eu | Calibration with 152Eu source.
START time:10:15
|
|
303
|
Thu May 25 14:31:46 2017 |
AT, JLT, AA, AIM | Background measurement | Background, No AIDA
Start:22:31
|
7x |
302
|
Thu May 25 13:56:00 2017 |
AT, JLT, AA | 252Cf | 252Cf source in Z=0cm position.
Start:21:57
|
|
301
|
Thu May 25 13:42:45 2017 |
AT, PC,KR,JLT,AA | 252Cf | 252Cf source in Z=0cm position.
Start:21:41
|
|
300
|
Thu May 25 13:38:11 2017 |
AT, PC, KR, JLT, AA | Clover, detectors in new position | Both clover detectors were moved. They are
in a symmetrical position. The end on the
clover nose is of the order
|
  |
299
|
Thu May 25 13:24:02 2017 |
AT,PC,KR,JLT,AA | CLOVER, detector not in its rigth position | We have noticed that D4 is not in its right
position. That explains the different number
of counts in the
|
|
298
|
Thu May 25 12:53:47 2017 |
AT, PC, JLT, KR, AA | Clover, 60Co | 60Co source
Source ID: CD395
|
|
297
|
Thu May 25 12:49:55 2017 |
AT, JLT,PC,AA | Clover, 133Ba, LN2 filling | We started the measurement of the source when
the N2 filling started. Just to check if
there are funny things
|
|
296
|
Thu May 25 10:15:02 2017 |
A.T, G. K, A.M, A. A | CLOVER, 133Ba no pulser |
Source in position z=0 with the carton (cardboard)
high-end, high-tech holder, but no AIDA (of |
|
295
|
Thu May 25 09:51:37 2017 |
A.T, A.A | CLOVER, Ba133 | Source details:
Diameter: 25.05 mm
|
|
294
|
Wed May 24 13:22:46 2017 |
JLT,AT,KR,SG,RY,... | CLOVER 152Eu | We connect the pulser to both CLOVERs
G7: It looks OK except for the G7-Green as |
|
293
|
Wed May 24 06:42:05 2017 |
JLT,AT,AM,RY,SG | START Preparation | We start to check every thing for the coming
run
|
|
292
|
Sun Apr 2 16:18:57 2017 |
All | END OF PARASITIC RUN | |
|
291
|
Sun Apr 2 01:04:24 2017 |
JLT ID JA GK CG VP YS Liu | Background | Date: 2/04/2017
Start: 09:05
BRIKEN run: 76
|
|
290
|
Sun Apr 2 00:44:01 2017 |
ID JA GK CG VP Liu JLT | 39Al run 75 | Date: 2/04/2017
Start: 08:42
BRIKEN run: 75
|
|
289
|
Sun Apr 2 00:19:01 2017 |
ID JA GK CG YS SN Liu VP | 39Al run 74 | Date: 2/04/2017
Start: 08:17
BRIKEN run: 74
|
|
288
|
Sat Apr 1 22:41:22 2017 |
ID, GK, SN, Liu YS JLT | 38Mg run 73 | Date: 2/04/2017
Start: 06:37
BRIKEN run: 73
|
|
287
|
Sat Apr 1 22:18:00 2017 |
Liu, YS, CG, GK, SN, JLT | 38Mg run 72 | DUMMY |
|
286
|
Sat Apr 1 21:37:42 2017 |
YS, Liu, CG | 37Na run 71 | Date: 2/04/2017
Start:04:47
BRIKEN run: 71
|
|
285
|
Sat Apr 1 19:48:41 2017 |
YS,CG,LIU | 37Na,run 70 | Date: 2/04/2017
Start:03:47
BRIKEN run: 70
|
|
284
|
Sat Apr 1 18:48:20 2017 |
YS, LIU, CG | 37Na run 69 | Date: 2/04/2017
Start:02:47
BRIKEN run: 69
|
|
283
|
Sat Apr 1 17:45:01 2017 |
YS,CG,LIU | 37Na, run 68 | Date: 2/04/2017
Start:01:44
BRIKEN run: 68
|
|
282
|
Sat Apr 1 16:17:59 2017 |
YS,CG, LIU | 37Na run 67 | Date: 2/04/2017
Start:00:17
BRIKEN run: 67
|
|
281
|
Sat Apr 1 15:16:45 2017 |
JLT OH VP Liu YS | 37Na run 66 | Date: 1/04/2017
Start:23:13
BRIKEN run: 66
|
|
280
|
Sat Apr 1 14:21:31 2017 |
PV OH Liu JLT | 37Na run 65 | Date: 1/04/2017
Start:22:12
BRIKEN run: 65
|
|
279
|
Sat Apr 1 13:15:37 2017 |
JA ID OH PV | Na37 Ne36 Run 064 | Date: 1/04/2017
Start:21:13
BRIKEN run: 63
|
|
278
|
Sat Apr 1 12:15:21 2017 |
PV, OH, JLT, ID, JA | 37Na run 63 | Date: 1/04/2017
Start:20:15
BRIKEN run: 63
|
|
277
|
Sat Apr 1 11:13:42 2017 |
PV,OH,JLT | 37Na run 62 | Date: 1/04/2017
Start:19:09
BRIKEN run: 62
|
|
276
|
Sat Apr 1 10:26:07 2017 |
VP,OH,JLT | 37Na run 61 | Date: 1/04/2017
Start:18:25
BRIKEN run: 61
|
|
275
|
Sat Apr 1 10:15:44 2017 |
VP,OH,JLT | 37Na run 60 | Date: 1/04/2017
Start:17:40
BRIKEN run: 60
|
|
274
|
Sat Apr 1 08:39:47 2017 |
ID OH JLT | 36Ne 37Na run 059 | Date: 1/04/2017
Start:16:38
BRIKEN run: 59
|
|
273
|
Sat Apr 1 06:49:00 2017 |
ID,GK,JA,DK,SN,JLT | 37Na run 58 | Date: 1/04/2017
Start:14:48
BRIKEN run: 58
|
|
272
|
Sat Apr 1 05:01:24 2017 |
ID DK GK JLT | 36Ne 37Na run 057 | Date: 1/04/2017
Start:13:00
BRIKEN run: 57
|
|
271
|
Sat Apr 1 04:03:31 2017 |
ID JA DK GK | Na37 Ne36 run 056 | Date: 1/04/2017
Start:12:00
BRIKEN run: 56
|
|
270
|
Sat Apr 1 02:07:49 2017 |
ID DK JA | Run 55 | Date: 1/04/2017
Start:10:04
BRIKEN run: 55
|
|
269
|
Sat Apr 1 01:04:31 2017 |
ID DK JA | Na37 Ne36 Run 54 | Date: 1/04/2017
Start: 09:03
BRIKEN run: 54
|
|
268
|
Sat Apr 1 00:04:10 2017 |
ID GK DK Liu | 37Na or 36Ne labels? | The BigRIPS settings are all called "36Ne
setting" but the night shift labels these
runs in the BRIKEN DAQ as
|
|
267
|
Fri Mar 31 23:41:57 2017 |
ID, LIU, DK, GK | 37Na run 53 | Date: 1/04/2017
Start: 07:41
BRIKEN run: 53
|
|
266
|
Fri Mar 31 22:45:21 2017 |
YS, LIU, DK | 37Na run 52 | Date: 1/04/2017
Start: 06:45
BRIKEN run: 52
|
|
265
|
Fri Mar 31 22:22:40 2017 |
YS, LIU, DK | 37Na run 51 | Date: 1/04/2017
Start: 06:23
BRIKEN run: 51
|
|
264
|
Fri Mar 31 21:45:25 2017 |
YS, LIU, OH, DK | 37Na run 50 | Date: 1/04/2017
Start: 05:45
BRIKEN run: 50
|
|
262
|
Fri Mar 31 21:00:57 2017 |
YS, LIU, OH | 37Na run 49 | Date: 1/04/2017
Start: 04:59
BRIKEN run: 49
|
|
261
|
Fri Mar 31 20:40:47 2017 |
YS, LIU, OH | 37Na run 48 | Date: 1/04/2017
Start: 04:38
BRIKEN run: 48
|
|
260
|
Fri Mar 31 19:31:15 2017 |
YS, LIU, OH, CG | 37Na, run47 | Date: 1/04/2017
Start: 03:30
BRIKEN run: 47
|
|
259
|
Fri Mar 31 18:28:54 2017 |
JLT, YS Liu, OH, CG | 37Na run 46 | Date: 1/04/2017
Start: 02:46
BRIKEN run: 46
|
|
258
|
Fri Mar 31 18:00:41 2017 |
JLT,SN,JLiu,YS,CG | 37Na run 45 | Date: 1/04/2017
Start: 01:57
BRIKEN run: 45
|
|
257
|
Fri Mar 31 16:56:16 2017 |
JLT, YS,Liu,PV,CG | New Configuration file | New configuration file:
170331_Conf_BrikenFull.xlsx
|
|
256
|
Fri Mar 31 15:30:24 2017 |
JLT, PV, Liu, SN, CG | 34Ne run 44 | Date: 31/03/2017
Start: 23:27
BRIKEN run: 44
|
|
255
|
Fri Mar 31 14:40:56 2017 |
JLT, PV, Liu, CG | 34Ne run 43 | Date: 31/03/2017
Start: 22:19
BRIKEN run: 43
|
|
254
|
Fri Mar 31 13:04:01 2017 |
JLT JA ID PV | 32Ne Run 42 | Date: 31/03/2017
Start: 22:01
BRIKEN run: 42
|
|
253
|
Fri Mar 31 11:46:44 2017 |
ID PV CG | 40Mg Run 041 | Date: 31/03/2017
Start: 19:43
BRIKEN run: 41
|
|
252
|
Fri Mar 31 10:35:22 2017 |
PV CG JA | Run 40 | Date: 31/03/2017
Start:
BRIKEN run: 40
|
|
251
|
Fri Mar 31 09:23:45 2017 |
CG PV JA | Run 39 | Date: 31/03/2017
Start: 17:22
BRIKEN run: 039
|
|
250
|
Fri Mar 31 08:23:32 2017 |
CG PV JA | Run 38 | Date: 31/03/2017
Start: 16:21
BRIKEN run: 038
|
|
249
|
Fri Mar 31 07:17:03 2017 |
OH PV JA CG | Run 37 | Date: 31/03/2017
Start: 15:24
BRIKEN run: 037
|
|
248
|
Fri Mar 31 05:27:44 2017 |
OH,SN,JA,PV | 40Mg run 36 | Date: 31/03/2017
Start: 13:24
BRIKEN run: 036
|
|
247
|
Fri Mar 31 04:57:01 2017 |
ID,YS,JLT,OH | 40Mg run 35 | Date: 31/03/2017
Start: 12:24
BRIKEN run: 035
|
|
246
|
Fri Mar 31 03:54:26 2017 |
ID JLT | Run 034: gamma spectra background lines | There is a strong background line at ~1293
keV. According to the attached document this
could come from the
|
|
245
|
Fri Mar 31 03:26:53 2017 |
ID OH SN | 40Mg Run 034 | Date: 31/03/2017
Start: 11:23
BRIKEN run: 034
|
|
244
|
Fri Mar 31 02:26:19 2017 |
ID RCF | 40Mg Run 033 | Date: 31/03/2017
Start: 10:23
BRIKEN run: 033
|
|
243
|
Fri Mar 31 01:50:15 2017 |
ID, RCF | 40Mg Run 032 | Date: 31/03/2017
Start: 10:01
BRIKEN run: 032
|
|
242
|
Fri Mar 31 01:01:58 2017 |
ID RCF OH | Run 031 | Date: 31/03/2017
Start: 08:58
BRIKEN run: 31
|
|
241
|
Fri Mar 31 00:01:55 2017 |
ID JA DK GK Liu | Run 030 | Date: 31/03/2017
Start: 07:58
BRIKEN run: 30
|
|
240
|
Thu Mar 30 22:19:22 2017 |
Liu DK KG JA ID | Run 28-29 | Date: 31/03/2017
Start: 06:30
BRIKEN run: 28
|
|
238
|
Thu Mar 30 21:01:54 2017 |
JA DK KG Liu | Run 27 | Date: 31/03/2017
Start: 5:04
BRIKEN run: 27
|
|
237
|
Thu Mar 30 20:13:11 2017 |
JA, GK, DK | 40Mg run25 | Date: 31/03/2017
Start: 04:13
BRIKEN run: 25
|
|
236
|
Thu Mar 30 19:16:46 2017 |
GK,DK,JLiu,JA,JLT | 40 Mg run 24 | Date: 31/03/2017
Start: 03:14
BRIKEN run: 24
|
|
235
|
Thu Mar 30 18:14:59 2017 |
JLT,DK,GK, Liu | 40Mg run23 | Date: 31/03/2017
Start: 02:14
BRIKEN run: 23
|
|
234
|
Thu Mar 30 17:17:21 2017 |
JLT,GK,DK,JLiu | 40Mg run 22 | Date: 31/03/2017
Start: 01:14
BRIKEN run: 22
|
|
233
|
Thu Mar 30 16:15:24 2017 |
SN, JLT, GK, DK, JLiu | 40Mg run 21 | Date: 31/03/2017
Start: 00:12
BRIKEN run: 21
|
|
232
|
Thu Mar 30 13:35:30 2017 |
JLT,TD, JLiu,SN, GK | 40Mg run 20 | Date: 30/03/2017
Start: 21:33
BRIKEN run: 20
|
|
231
|
Thu Mar 30 12:27:44 2017 |
JLT,TD,JLiu,SN | 40Mg run 19 | Date: 30/03/2017
Start: 20:26
BRIKEN run: 19
|
|
230
|
Thu Mar 30 11:35:52 2017 |
JLT,TD,PV,JLiu | 40Mg run 18 | Date: 30/03/2017
Start: 19:33
BRIKEN run: 18
|
|
229
|
Thu Mar 30 10:26:06 2017 |
JLT,TD,PV | 40Mg run 17 | Date: 30/03/2017
Start: 18:24
BRIKEN run: 17
|
|
228
|
Thu Mar 30 09:24:45 2017 |
JLT,RC,TD,PV,SN | 40Mg run 16 | Date: 30/03/2017
Start: 17:22
BRIKEN run: 16
|
|
227
|
Thu Mar 30 07:41:58 2017 |
RCF PV SN CG JA | Run 15 | Date: 30/03/2017
Start: 16:05
BRIKEN run: 15
|
|
226
|
Thu Mar 30 07:31:09 2017 |
SN PV CG RCF JA | Run 14 | Date: 30/03/2017
Start: 15:30
BRIKEN run: 013
|
|
225
|
Thu Mar 30 06:30:06 2017 |
JA CG PV SN | Run 13 | Date: 30/03/2017
Start: 14:25
BRIKEN run: 013
|
|
224
|
Thu Mar 30 05:56:28 2017 |
JLT,JA,CG,PV | 40Mg Run 12 | Date: 30/03/2017
Start: 13:54
BRIKEN run: 012
|
|
223
|
Thu Mar 30 04:49:52 2017 |
JLT,TD | 40Mg Run 11 | Date: 30/03/2017
Start: 12:47
BRIKEN run: 011
|
|
222
|
Thu Mar 30 03:55:42 2017 |
J. Agramunt | 40Mg Run 10 | Date: 30/03/2017
Start: 11:52
|
|
221
|
Thu Mar 30 01:46:30 2017 |
J.Agramunt | 40Mg Run 009 | Date: 30/03/2017
Start: 09:47
|
|
220
|
Thu Mar 30 00:47:04 2017 |
J. Agramunt | 40Mg Run 008 | Date: 30/03/2017
Start: 08:41
|
|
219
|
Wed Mar 29 22:53:58 2017 |
J. Agramunt | 40Mg Run007 |
Date: 30/03/2017
|
|
218
|
Wed Mar 29 21:34:20 2017 |
RCF | 40Mg Run 006 |
Date: 30/03/2017
|
|
217
|
Wed Mar 29 20:27:53 2017 |
RCF | 40Mg Run005 |
Date: 30/03/2017
|
|
216
|
Wed Mar 29 19:31:21 2017 |
RCF | 40Mg Run 004 |
Date: 30/03/2017
|
|
215
|
Wed Mar 29 18:42:25 2017 |
RCF | 40Mg Run 003 |
Date: 30/03/2017
|
 |
214
|
Wed Mar 29 18:16:58 2017 |
RCF | 40Mg Run 002 |
Date: 30/03/2017
|
|
213
|
Wed Mar 29 17:15:21 2017 |
JLT | New Config file | New configuration file:
170330_Conf_BrikenFull.xlsx
|
|
212
|
Wed Mar 29 15:16:17 2017 |
Many | 40Mg Run 001 | Date: 29/03/2017
Start: 23:13
|
|
211
|
Wed Mar 29 14:14:58 2017 |
Many | 40Mg RUN 000 | Date: 29/03/2017
Start: 22:13
|
|
210
|
Wed Mar 29 13:31:37 2017 |
J Agramunt, R. Caballero, T. Davinson, C. Griffin, O. Hall, D. Kahl, G. Kiss, J. Liu, S. Nishimura, V. Phong, JL Tain | Start of parasitic | Start of parasitic Ca beam
(main experiment "New isotope search", Ahn
et al.)
|
|
209
|
Wed Mar 29 11:02:40 2017 |
PV, Liu, JA, JLT | F11 plastic | New calibration of F11 plastic
We decided to have both a low gain and a |
|
208
|
Wed Mar 29 07:34:16 2017 |
J. Agramunt | BrikenTools repository installed at d05 | The last version of Briken tools repository
has ben installed at d05, this repository
includes the Merger and the BrikenOffline |
|
207
|
Wed Mar 29 03:02:02 2017 |
J. Agramunt | Synchronization test procedure (update) | To Launch the processes:
Open 4 terminals:
|
|
206
|
Tue Mar 28 17:02:19 2017 |
DK | Applying Biases | Today, Gabor and I discussed with Nathan from
ORNL about the biasing system used for Ge,
3He, Plastic, and others. Phong is also |
|
205
|
Tue Mar 28 09:10:09 2017 |
Many | 152Eu | 152Eu source inside BRIKEN for CLOVER calibration.
Also calibration of Si-dE with 60Co source
and AIDA_PL calibration with 60Co source.
|
 |
204
|
Tue Mar 28 06:56:15 2017 |
PV, Liu, JA, JLT | F11 Plastic | Calibration of new F11 plastic
(see photo)
|
  |
203
|
Mon Mar 27 11:53:15 2017 |
PV,Liu | Turn on dE detector | We applied a bias voltage of 100 V to the
dE detector
Current read = 0.660 uA |
   |
202
|
Mon Mar 27 09:32:55 2017 |
JLT JA CG OH DK TD RC VP GK LJ SN | 252Cf | 252Cf at the center for BRIKEN calibration
|
  |
201
|
Mon Mar 27 03:50:13 2017 |
JLT JA CG OH DK TD RC VP SN | Background | Background measurement while they play with
the beam.
|
|
200
|
Sat Mar 25 13:42:23 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. Caballero | Background | BRIKEN system powered and DACQ started after
movement.
All looks fine.
|
|
199
|
Sat Mar 25 13:33:12 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. Caballero | BRIKEN+AIDA relocated | We moved AIDA+BRIKEN by 107cm upstream.
See attached photos.
|
 |
198
|
Fri Mar 24 03:28:39 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | Background | Background measurement overnight
Start: 19:45
|
|
197
|
Thu Mar 23 10:03:51 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | 252Cf | 252Cf source at the center for calibration
23/03/2017
|
|
195
|
Thu Mar 23 09:30:58 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | Power-up and 1st spectrum | Crates powered up.
DACQ started.
New directory: /data/1703Preparation/
|
|
194
|
Thu Mar 23 09:04:38 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | Remove EURICA rails | We remove partially the floor rails of EURICA
to proof that it is possible to move BRIKEN |
  |
193
|
Thu Mar 23 09:01:33 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | ELOG Start Preparation | We started the preparation of 2017 campaign |
|
192
|
Fri Dec 9 05:25:26 2016 |
PV | Photo and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experiment | This Pb shielding structure is right behind
the variable degrader |
 |
191
|
Thu Dec 8 04:17:49 2016 |
PV | Installing BRIKEN ELOG 2016 in RIBF local network to a personal computer | All the RIBF123 elog website (including
Takechi and Fallon experiment) can be
downloaded and installed from the following |
|
190
|
Tue Nov 29 00:30:42 2016 |
PV,SN | Sillicon dE bias voltage increased | We increase the bias voltage of the dE
detector from 20 V to 100 V
Leakage current: |
|
189
|
Mon Nov 28 16:18:07 2016 |
AE | DAQ synchronization | Please see: https://elog.ph.ed.ac.uk/AIDA/493 |
|
188
|
Mon Nov 28 10:48:21 2016 |
JLT | Online analysis | Comparison of current spectra with spectra
from Takechi's run
|
|
187
|
Mon Nov 28 05:59:28 2016 |
briken | run |
======= START =======
Date 2016/11/28
Start
time : 11:12
BRIKEN run : 056
Daq Conf.
File : 161128Conf_BrikenFull.xlsx
DLT File |
|
186
|
Mon Nov 28 01:22:50 2016 |
BRIKEN collaboration | Elog RIBF123 & BigRIPS | Full RIB123 Elog entries for Takechi && Fallon
parasitic experiments
Update:03Dec16
|
6x |
185
|
Sun Nov 27 23:14:49 2016 |
BRIKEN coll | run 036 | ======= START =======
Date 2016/11/27
Start time : 19:28
|
|
184
|
Sun Nov 27 11:23:54 2016 |
PV, GK, AE, TD | 40Mg. Run 35 | ======= START =======
Date 2016/11/27
Start time : 18:59
|
|
183
|
Sun Nov 27 11:15:42 2016 |
PV, GK, AE, TD | 40Mg. Run 34 | ======= START =======
Date 2016/11/27
Start time : 17:29
|
|
182
|
Sun Nov 27 11:07:02 2016 |
PV, GK, AE, TD | 40Mg. Run 33 - junk | ======= START =======
Date 2016/11/27
Start time : 17:17
|
|
181
|
Sun Nov 27 10:47:20 2016 |
PV,TD,GK | 40Mg. Run 32 | ======= START =======
Date 2016/11/27
Start time : 16:20
|
|
180
|
Sun Nov 27 07:10:29 2016 |
BRIKEN colaboration | Run 31 | ======= START =======
Date 2016/11/27
Start time : 13:53
|
|
179
|
Sun Nov 27 04:38:15 2016 |
BRIKEN collaboration | Run 030 | ======= START =======
Date 2016/11/27
Start time : 10:41
|
|
178
|
Sun Nov 27 04:36:16 2016 |
BRIKEN collaboration | Run 020-023 | ======= START =======
Date 2016/11/26
Start time : 20:05
|
|
177
|
Sat Nov 26 20:50:13 2016 |
GK, AT&AT | run 16-19 | ======= START =======
Date 2016/11/26
Start time : 17:21
|
 |
176
|
Sat Nov 26 20:48:16 2016 |
BRIKEN collaboration | run | ===== Start of measurements 41Al ====== |
|
175
|
Sat Nov 26 16:54:17 2016 |
AT & AT | Clovers | Calibration of clovers |
|
174
|
Sat Nov 26 16:21:08 2016 |
Briken collaboration | 41Al run 2-15 | 13:08 Beam is still OFF. Background acquisition
is started.
Degrader:
|
|
173
|
Sat Nov 26 09:31:05 2016 |
Gabor Kiss, Ariel Tarifeno, Alvaro Tolosa | Output signals from G7Red | Preamplifier of crystal G7Red was replaced.
Output signals from G7Red are weird.
|
   |
172
|
Sat Nov 26 06:37:37 2016 |
AT | 41Al run 1 | 11:07 New acquisition is started for tungsten
degraders
1mm W + 1mm Al
|
|
171
|
Sat Nov 26 06:30:30 2016 |
AT | Setup | Setup for parasitic experiments
Energy 41Al @ F11 is around 145MeV/u
|
|
170
|
Sat Nov 26 00:15:12 2016 |
AT | 41Al run0 | 08:15 BigRips tunning for centering 41Al.
Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
|
|
169
|
Sat Nov 26 00:04:15 2016 |
AT | Elog | RIKEN Elog during Fallon Parasitic experiments
Fallon Group:
|
|
168
|
Fri Nov 25 23:18:04 2016 |
BRIKEN collaboration | Fallon Parasitic experiments | ===== START OF PARASITIC EXPERIMENTS ====== |
|
167
|
Fri Nov 25 21:50:42 2016 |
AT | New Conf File | 161125Conf_BrikenFull.xlsx |
|
166
|
Fri Nov 25 21:49:36 2016 |
AT | Background Beam OFF | 21:27 Beam off. Background is started.
22:10 Acquisition is stopped. Files: |
|
165
|
Fri Nov 25 21:48:49 2016 |
AT | DACQ | 19:00 Test calibration |
|
164
|
Fri Nov 25 21:47:05 2016 |
AT | Background Beam OFF | 16:17 Background beam OFF
16:27 Beam On. Acquisition stopped just after |
 |
163
|
Fri Nov 25 03:49:44 2016 |
AT | Background Beam ON | 16/11/25 12h28min: Background measurement
beam ON 19B |
|
162
|
Fri Nov 25 03:41:40 2016 |
AT | Run setups | Run setups during preparation of Fallon Parasitic
experiments (Kanungo experiment beam time)
can be found on
|
|
161
|
Fri Nov 25 03:37:23 2016 |
AT | Background Beam OFF/ON | 16/11/24 21h06min: Background measurement
Beam OFF + Beam ON tunning and 22C
|
  |
160
|
Fri Nov 25 03:15:46 2016 |
AT | Background Beam ON | 16/11/24 19h38min:
Background measurement during tunning of
BigRips from 27-29F to 22C is started.
|
|
159
|
Thu Nov 24 14:57:55 2016 |
AT | Background Beam ON | Starting from today 12:22, the background
generated by the different setups on BigRips
is monitorized.
|
 |
158
|
Thu Nov 24 14:36:27 2016 |
AT | 252Cf | Check of calibrations and rates for neutron
detectors with Conf File 161107Conf_BrikenFull.xlsx
|
|
157
|
Thu Nov 24 02:30:56 2016 |
CG | RIBF123R1 Local ELogs | PDFs of the local ELog for the RIBF123R1
experiment Nov 2016 |
9x |
156
|
Tue Nov 22 10:22:07 2016 |
PV, Liu | No current observed when turning on the HV for the D4 Clover | 19:00
We've turned on the High Voltage for the
D4 Clover up to ~ 1.5 kV.
|
|
155
|
Tue Nov 22 10:17:57 2016 |
ATS, PV, LIU | 252Cf | Measurement with 252Cf at Z=22.5cm from the
moderator border, opposite side from AIDA.
Clovers and Veto detectors are turned off.
|
|
154
|
Tue Nov 22 09:26:04 2016 |
A. Tarifeno-Saldivia | Noise check | Run for checking the noise just after turn
on the crates, without high voltages on the
PREAMPS.
|
|
153
|
Tue Nov 22 08:28:36 2016 |
A. Tarifeno-Saldivia et al | New directory and Config File | A new directory in the IFICdaq computer has
been created for the parasitic measurements
during the Fallon Beam Time.
|
|
152
|
Sun Nov 20 13:02:06 2016 |
Jorge, Alavaro, Jose | DACQ | Gasific-7.0 Short Manual (Preliminary) |
|
151
|
Sun Nov 20 12:28:27 2016 |
Jorge, Alvaro, Jose | DACQ | Updated run protocol |
|
150
|
Fri Nov 11 08:07:18 2016 |
BCR SG NTB | BRIKEN Hit Visualization | These are the files used to create and
visualize the hit patterns of the BRIKEN
detector. |
  |
Draft
|
Thu Nov 10 05:05:54 2016 |
KM | How to convert ridf-file to root-file | 1. Login to briken@ribfana03.riken.jp
2. Check if the ridf-file you want
to convert is in the directory; /home/briken16/rawdata/bigrips/ |
|
148
|
Wed Nov 9 02:02:22 2016 |
Iris | Boron rubber from India | The boron rubber from India is BR-2871, price
US-$ 2700 for 2pc 1m x 2m x 3.3mm.
52% B content, density 1.61 g/cm3 |
  |
Draft
|
Wed Nov 9 01:04:35 2016 |
Iris | Drawing of present setup | This is the setup which was used for the Ni
runs (from Nov. 8th evening on).
|
|
146
|
Wed Nov 9 01:02:53 2016 |
Iris | Elog | From Nov. 9th on we use the Takechi ELOG for
the run information:
http://ribf-exp.riken.jp/elog/RIBF123/ |
|
145
|
Tue Nov 8 17:00:27 2016 |
NTB, CG, AT | Si Delta E | At least during the timeframe in between
~ 21:30 (11/08) - 23:30 (11/09) (161108_2323_717273Ni.root)
we see that the silicon dE have a very low |
|
144
|
Tue Nov 8 15:10:24 2016 |
Many | 717273Ni Run | F7 OUT F11 C-6mm
Start: 00:09
|
|
143
|
Tue Nov 8 14:28:54 2016 |
Many | 717273Ni run | F7 CH2 F11 C-6mm
Total degrader thickness 6mm
|
|
142
|
Tue Nov 8 13:49:58 2016 |
Many | 71,72,73Ni | F7 CH2 F11 Empty
We remove the 8mm Al plate from inside BRIKEN |
|
141
|
Tue Nov 8 12:51:08 2016 |
Many | 717273Ni | After removing the lead wall.
Start: 21:45
|
|
140
|
Tue Nov 8 12:30:33 2016 |
Tain, Ale (who are not on shift) | 71,72,73Ni run | 71,72,73Ni run
We started at approximately 21:00, only online, |
|
139
|
Tue Nov 8 11:51:28 2016 |
Ale | spikes on some spectra | Some spectra show spikes or do not look normal.
This should be checked.
|
|
138
|
Tue Nov 8 08:49:51 2016 |
Tain et al | Move ELOG | We will start to use the internal RIKEN ELOG
It is not clear that we can keep the present
ELOG also updated |
|
137
|
Tue Nov 8 08:31:52 2016 |
Tain et al | 424344Ca run | Sequence of settings:
1) No target at F7 and Empty target at F11
(up to t=1E6ms)
|
|
136
|
Tue Nov 8 06:39:25 2016 |
Tain. Iris | Drawing of present setup |
Attached is the present setup including all |
|
135
|
Tue Nov 8 06:13:11 2016 |
Tain et al | New plastic detector in F11 | There is a new plastic scintillator
after the MUSIC chambers
|
 |
134
|
Tue Nov 8 02:49:19 2016 |
PV, Liu | Specification of the dE silicon detector | The specification and picture of the dE silicon
detector is shown in the attached photos.
The detector has an effective area of 134 |
  |
133
|
Mon Nov 7 14:17:23 2016 |
BRIKEN collaboration | Picture of shift schedule | |
|
131
|
Mon Nov 7 13:44:26 2016 |
Alvaro, Ale, Jorge, Jose | Running Gasific and run protocol | Preliminary |
|
130
|
Mon Nov 7 13:15:07 2016 |
Alvaro, Ale, Jorge, Jose | Background | Background measurement overnight.
Start: 23:27 (07/11/2016)
|
|
129
|
Mon Nov 7 13:11:42 2016 |
Alvaro, Ale, Jose, Jorge | New directory and Config file | For second part of Takechi's run:
Directory: /data/1611Commissioning/161107Parasitic
|
|
128
|
Mon Nov 7 09:05:09 2016 |
Iris | Draft for Run sheet | Attached is the draft for the paper run sheet
(version 2). If something is missing, please
let me know. |
 |
127
|
Mon Nov 7 09:04:10 2016 |
Phong,Liu,Ale,Jose | New AIDA plastic calibration | To have a range of about 200 MeV
Ortec671 Gain from x20 to x5 (fine gain : |
|
126
|
Mon Nov 7 06:55:01 2016 |
NTB, SG | HPGe Fill line to D4 replaced | HPGe fill line to D4 replaced only small
leak (overflow) once Ge is full.
Solenoid was also wrapped to no |
|
125
|
Mon Nov 7 05:36:20 2016 |
Ale | new calibration for F11 | new calibration for F11
Using a value of 70 MeV energy loss and the |
|
124
|
Mon Nov 7 04:49:57 2016 |
Tain, Ale | AIDA plastic (veto) and Si de calibration | AIDA plastic (veto) and Si de calibration
For the calibration the Compton edge of the |
|
123
|
Mon Nov 7 04:37:33 2016 |
Phong,Liu,... | Si de and AIDA plastic calibration | 60Co source placed close to the detectors:
ROOT files:
|
|
122
|
Mon Nov 7 02:39:55 2016 |
Ale | Photo of the white board with the details on the cards and preamps at B1F | Photo of the white board with the details
on the cards and preamps at B1F |
|
121
|
Sun Nov 6 23:35:42 2016 |
Tain et al. | Overnight measurement: Ca isotopes | First 50,49,48Ca beam and then 47,46,45Ca
beam
C-6mm IN and OUT
|
  |
120
|
Sun Nov 6 07:16:59 2016 |
Tain et al. | 58Ni on F7 CH2 F11 empty/C6mm | CH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later
|
 |
119
|
Sun Nov 6 06:39:23 2016 |
Tain et al. | 58Ni on F11 C-6mm | 58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to |
|
118
|
Sun Nov 6 06:27:49 2016 |
Tain et al. | 58Ni on F11 C-6mm in | New calibration in V_PL_T and V_PL_R (Energyx1/2)
Start: 15:15
|
|
117
|
Sun Nov 6 03:12:55 2016 |
Alvaro,Jorge | Overnight measurement | Measurement during beam production
and measurement with F7 CH2 out,
F11 C-tar in/out, F7 CH2 in C-target out/in
|
|
116
|
Sat Nov 5 17:07:27 2016 |
Tain, Alvaro, Jorge | 62Ni in F7 | 62Ni beam in F7 ON CH2 target
Strat with C target ladder in F11 in empty |
    |
115
|
Sat Nov 5 16:27:13 2016 |
Tain,Ale,Jorge,Alvaro | 62Ni beam in F11 empty target | Empty position of the target ladder at F11
(hole is smaller than beam size)
|
|
114
|
Sat Nov 5 15:07:11 2016 |
Tain, Ale | 62Ni beam on F11 C-6mm | 62Ni on 6 mm C target between MUSICs
The background before was 0.36 neutrons/s
|
    |
113
|
Sat Nov 5 03:36:34 2016 |
Tain et al | Ancillary detectors | Some info on ancillary detector signals
Plastic veto detectors (Top and Botomm):
|
  |
112
|
Sat Nov 5 03:18:13 2016 |
SG BCR RCF NTB | Gamma peaks in the overnight run, related to neutron inelastic scattering | We looked at the overnight background run
(161105_0935_BackgroundOvernight.root), There
are gamma-peaks that could be related |
 |
111
|
Sat Nov 5 01:26:46 2016 |
Jose,Iris,Alvaro, Alejandro, Krzysztof | Background measurement | Measurement overnight
Start: around 1:00
|
7x |
110
|
Sat Nov 5 01:25:24 2016 |
Tain et al | End of Beam Line Setup | Some photos of the elements in the last part
of the beam line
during Takechi run.
|
9x |
109
|
Fri Nov 4 13:16:42 2016 |
JLTain,ATolosa,JAgramunt | Neutron Background | Beam tuning in BigRIPS
At 19:00 access to Exp. Area was closed and |
   |
108
|
Fri Nov 4 03:37:27 2016 |
Roger Caballero | Energy calibration for Ge clovers | Energy Calibration: See attached pdf
Detector Slope Offset
|
|
107
|
Thu Nov 3 23:28:01 2016 |
A. Tolosa | BRIKEN Bkg + 152Eu | Measurement over night with a 152Eu source
inside
|
 |
106
|
Thu Nov 3 15:09:52 2016 |
A. Tarifeno-Saldivia, C. Domingo-Pardo, J.L. Tain | BRIKEN neutron efficiency | Geant4 BRIKEN Neutron efficiency calculations
as a function of neutron energy and for some
spectra: Ga84-vandle, Br88-endf71, Rb94-endf71, |
  |
105
|
Thu Nov 3 14:02:49 2016 |
Nepal, J Ha, PV, Liu J | The degrader system has been set | We used the laser to align the degrader
(see attached photos)
According to the LISE calculation, |
 |
104
|
Thu Nov 3 05:46:48 2016 |
Iris, Ale | Background measurement | Background measurement for threshold determination
|
|
103
|
Thu Nov 3 05:27:48 2016 |
Alvaro, Tain, Gabor, Ale | 152Eu | Energy calibration for clovers, 152Eu
|
|
102
|
Thu Nov 3 04:46:24 2016 |
Alvaro Tolosa | 252Cf | Check of BRIKEN calibration and thresholds
Source more or less at the center
|
|
101
|
Thu Nov 3 04:40:02 2016 |
All | START | Start of commissioning preparation
|
|
100
|
Wed Nov 2 02:26:22 2016 |
Roger Caballero | Efficiency callibration calculator (Excel file) | Attached the updated excel file. In the first
sheet there is the calculator to calculate
the efficiency from an given energy.
|
|
99
|
Wed Nov 2 01:19:46 2016 |
Roger Caballero | Eff callibration parameters for D4-Clover | Efficiency calibration for the D4 clover (data
acquired in October).
The attached plots show the parameters for |
   |
97
|
Tue Nov 1 13:00:55 2016 |
Roger Caballero | Eff callibration parameters for G7-Clover | Efficiency calibration for the G7 clover (data
acquired in July).
The attached plots show the parameters for |
   |
96
|
Tue Nov 1 09:27:02 2016 |
Alvaro Tolosa | CLOVER | Efficiency calibration
File "cloversEff.ods" and "cloversEff.xls" |
 |
95
|
Mon Oct 31 23:56:37 2016 |
J. Agramunt | First AIDA BRIKEN correlation plot | From the 252Cf data. |
|
94
|
Tue Oct 18 09:41:43 2016 |
Alvaro Tolosa | 2016 - July, Logbook | Paper logbook for July-2016
For correct visualization,
please download it. |
|
93
|
Tue Oct 18 09:36:07 2016 |
Alvaro Tolosa | 2016-Oct, Logbook | Paper logbook for October-2016
For correct visualization,
please download it. |
|
92
|
Mon Oct 17 05:21:46 2016 |
Phong, Liu J J | dE detector position and output signal from preamplifier | dE detector is mounted onto the back side
of the shielding (attached photo: dE_position.JPG)
|
  |
91
|
Sun Oct 16 13:30:43 2016 |
All | END | ... and sashimi (see photo)
The detectors (BRIKEN tubes, CLOVER, VETO |
|
90
|
Sun Oct 16 12:58:34 2016 |
All | BRIKEN | Installation of BRIKEN PE shielding for beam
related neutrons
|
  |
89
|
Fri Oct 14 14:06:38 2016 |
All | First measurement of BRIKEN and AIDA | Friday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common
clock.
|
|
88
|
Fri Oct 14 13:32:52 2016 |
NT BREWER, S Go, JM Allmond | Ge preamp power loss and solution. | As previously recorded (81), on Thur Oct
13th, A NIM crate failure caused preamp power
loss to the HPGe's. While D4 recovered |
|
87
|
Fri Oct 14 04:42:40 2016 |
JL Tain et al | Electronics | Change of main power line for MPOD and CLOVER
preamp
|
 |
86
|
Fri Oct 14 04:12:50 2016 |
JL Tain et al | CONF | New configuration file:
161014Conf_BrikenFull.xlsx |
|
85
|
Thu Oct 13 23:42:27 2016 |
JL Tain et al | Background | Background measurement overnight
Start: 01:17
|
|
84
|
Thu Oct 13 23:41:25 2016 |
JL Tain et al | 252Cf | New BRIKEN energy calibration
|
|
83
|
Thu Oct 13 23:39:58 2016 |
JL Tain et al | VETO Det | Energy calibration of plastic and NaI detectors
|
    |
82
|
Thu Oct 13 23:38:26 2016 |
JL Tain et al | CLOVER | Energy and efficiency calibration
We make calibrations for the remaining D4 |
  |
81
|
Thu Oct 13 12:58:31 2016 |
JL Tain et al | INCIDENT | NIM Crate Failure. Lost of CLOVER G7
One of the 2 NIM crates, the one containing |
|
80
|
Thu Oct 13 04:36:58 2016 |
JL Tain et al | CLOVER | CLOVER energy calibration
Short run with 137Cs and 60Co sources at |
|
79
|
Wed Oct 12 11:30:53 2016 |
Ariel Tarifeno, Alvaro Toloza, JL Tain, J. Agramunt, et al | BRIKEN Z scan | Scanning of the BRIKEN detector with the 252Cf
source
along the longitudinal axis (Z axis)
|
|
78
|
Wed Oct 12 05:06:57 2016 |
JL Tain et al | Noise | Gamma source close to ORNL2 tube
In order to investigate the origin of the |
 |
77
|
Wed Oct 12 03:47:14 2016 |
JL Tain et al | Background | Background measurement over night with CLOVER
and VETO detectors
|
|
76
|
Tue Oct 11 17:11:28 2016 |
A. Tarifeno-Saldivia et al... | ROOT macro | ROOT macro for calculation of neutron rates
in the BRIKEN detector
|
|
75
|
Tue Oct 11 15:58:01 2016 |
JL Tain et al | VETO Det | Check of Plastic and NaI veto detectors and
DACQ settings
|
  |
74
|
Tue Oct 11 15:47:45 2016 |
N Brewer, S Go et al | CLOVER | Both COVER detectors are installed in place.
See photos.
|
   |
73
|
Sun Oct 9 18:19:01 2016 |
JL Tain et al | Noise | Optimization of ADC thresholds
In order to try to reduce the grass-like |
 |
72
|
Sun Oct 9 15:49:41 2016 |
JL Tain et al | Power shutdown | Due to maintenance operations of the Wako
electrical
company there is a risk of power shutdowns |
|
71
|
Sun Oct 9 04:20:47 2016 |
JL Tain et al | Noise | We check for the appearance of spurious signals
in the preamplifiers.
|
 |
70
|
Sat Oct 8 01:18:51 2016 |
JL Tain et al | DACQ | We increased the pretrigger delay for ADC5
from 350 to 400 |
|
68
|
Fri Oct 7 10:42:52 2016 |
JL Tain et al | Noise | We investigate the effect on the noise in
ORNL tubes of using a differential PA.
|
|
67
|
Fri Oct 7 08:35:15 2016 |
JL Tain et al | Noise | Low amplitude noise component.
The figure shows the composition of the low |
|
66
|
Fri Oct 7 08:09:47 2016 |
JLTain et al | Background | Background measurement overnight
Start: Oct-6 2242 Stop: Oct-7 10:45
|
 |
65
|
Thu Oct 6 14:50:30 2016 |
JL Tain, A Tolosa, A Tarifeno,... | 252Cf | First measurement with 252Cf source to check
the calibration.
AIDA was in place so the source was at the |
 |
64
|
Thu Oct 6 14:43:47 2016 |
JL Tain, A Tarifeno, A Tolosa, J Agramunt, N Brewer, S Go, ... | Electronics | We mount back all preamplifiers
Initially we used all the PA coming from
US, the repaired and the new ones.
|
|
63
|
Thu Oct 6 02:03:32 2016 |
JL Tain | START | We started the assembly of BRIKEN and AIDA
detectors in their final position
on Tuesday October 4:
|
6x |
62
|
Thu Aug 18 23:32:59 2016 |
NT Brewer | New preamps arrived at Oak Ridge and tested working. | Collaborators,
Attached is a phone photo of example
signals from the new preamps with 3 3He tubes |
 |
Draft
|
Thu Aug 18 22:39:35 2016 |
NT Brewer | New preamps arrived at Oak Ridge and tested working. | Collaborators,
Attached is a phone photo of example
signals from the new preamps with 3 3He tubes |
|
60
|
Fri Jul 29 09:52:28 2016 |
Keishi Matsui | accuracy of Cf-252's intensity in RIKEN | According to the reply from Japan
Radioisotope Association, the accuracy of
the Cf-252's intensity is +0%/-15%. |
|
59
|
Fri Jul 22 12:50:29 2016 |
J.L. Tain | END | 20/JUL/2016 20:00
End of the test measurements |
|
58
|
Wed Jul 20 17:21:59 2016 |
J. Agramunt, A. Tolosa | DACQ | DACQ configuration parameters
The last configuration file used was: 160718Conf_BrikenFull_cal5.xlsx
|
|
57
|
Wed Jul 20 17:18:59 2016 |
J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, K. Gabor, S. Go, K. Matsui... | Electronics | Measurement with preamplifiers after drying.
Amplifiers are brought back after ~12h and |
 |
56
|
Wed Jul 20 17:05:59 2016 |
J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, ... | Background | Background measurement with remaining tubes
(95) overnight
|
|
55
|
Wed Jul 20 16:55:48 2016 |
K.Gabor, K. Matsui, A. Tarifeņo | Electronic | Drying of preamplifiers
PA8, PA9 and PA10 are removed and brought |
|
54
|
Wed Jul 20 16:50:12 2016 |
J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, S. Go... | 252Cf | Measurement of the 252Cf source at the central
position
|
|
53
|
Wed Jul 20 16:40:57 2016 |
S. Go, J.Agramunt, A.Tolosa, J.L. Tain,... | CLOVER | Calibration and resolution check
CLOVER detectors were calibrated in energy |
|
52
|
Wed Jul 20 16:12:58 2016 |
S. Go, ... | CLOVER | Mounting of the CLOVER detectors in position
CLOVER G7: right of beam
|
  |
51
|
Wed Jul 20 16:07:58 2016 |
A.Tarifeņo, J.L. Tain, J. Agramunt, A. Tolosa, ... | 252Cf | 19/Jul/2016
Scanning of the efficiency as a function
of longitudinal position
|
|
50
|
Wed Jul 20 12:00:15 2016 |
J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, ... | 252Cf | Measurement with the source at the center
Listmode: 160719_BRIKEN_252Cf_009.dlt
|
|
49
|
Wed Jul 20 11:49:00 2016 |
J.L. Tain, J. Agramunt, R. Baeturia, A. Tarifeņo, A. Tolosa, ... | Background | 18/07/2016
First background measurement overnight.
|
|
48
|
Wed Jul 20 11:40:00 2016 |
J.L. Tain, J. Agramunt, R. Baeturia, A. Tarifeņo, A. Tolosa, ... | 252Cf | First measurement with full 140 tube version
of the BRIKEN neutron detector
|
   |
47
|
Wed Jul 20 11:16:18 2016 |
J.L. Tain | Electronics | Pulser settings
We use two pulsers, Pulser1 for RIKEN, ORNL1 |
|
46
|
Wed Jul 20 08:58:13 2016 |
J.L. Tain, I.Dillman, R. Caballero, J. Agramunt, A. Tarifeņo, A. Tolosa, ... | Electronics | Distribution of connections of tubes in preamplifiers
and digitizers
|
 |
45
|
Tue Jul 19 13:47:55 2016 |
A. Tarifeņo-Saldivia | Neutron efficiency - Scanning on Z preliminary result | We have carried out a scanning of
the neutron efficiency with respect to the
position along the Z-axis (AIDA and BEAM |
|
44
|
Tue Jul 19 11:54:03 2016 |
JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt | Photos of the AIDA insertion hole with the 3He tubes | RIKEN tubes on the AIDA side with the SHV
right angle connector will protrude
by ~95mm in the HYBRID configuration (with |
  |
43
|
Tue Jul 19 04:34:57 2016 |
JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt | Photos of the electronics | Racks, crates, rear part of the preamps and
matrix with all tubes. |
9x |
42
|
Tue Jul 19 04:09:32 2016 |
JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt | Last tube fit in the matrix!!! | The photo of great moment |
|
41
|
Tue Jul 19 03:19:34 2016 |
A. Tarifeņo, I. Dillman, J. Agramunt, A. Tolosa, J.L. Tain... | Electronics | Preamplifier and signal cable testing
We check all signal cables,the flat cable |
   |
40
|
Mon Jul 18 19:01:36 2016 |
J.L. Tain | 3He tubes | Adjustment of HV and PA gain
We adjust the HV for each tube type and the |
|
39
|
Mon Jul 18 18:40:32 2016 |
A. Tarifeņo-Saldivia and J. L. Tain | 3He tubes - Testing | Test of individual 3He tubes
The tests were done using the ATOMKI MCA |
7x |
38
|
Mon Jul 18 09:32:50 2016 |
Shintaro Go | HV controls | You can start applying HVs on the detectors
using macro on the control-computer.
If you have already signed in the |
|
37
|
Fri Jul 15 11:47:31 2016 |
Nathan Brewer and Alvaro Tolosa | Preliminary Ge Calibration, Resolution and Configuration | Today several tests (3) were done with
the germanium detectors with the voltage
configuration listed in the previous entry. |
9x |
36
|
Fri Jul 15 08:29:14 2016 |
Nathan Brewer, Shintaro Go | Expected Performance and Voltage Setting for Germanium | Expected Resolution:
------------------------------
G7 should be ~2.0 keV FWHM at 600 |
|
35
|
Sat Jul 9 21:26:25 2016 |
J.L. Tain | EDACQ | Electronics and DACQ for July 2016 assembly:
hardware and connections |
|
34
|
Sat Jul 9 21:21:38 2016 |
J.L. Tain | 3He tubes | Tube distribution in the moderator, pre-amplifiers
and digitizers |
 |
33
|
Sat Jul 9 21:14:12 2016 |
J.L. Tain | 3He tubes | Drawings and specs of 3He tubes |
   |
32
|
Sat Jul 9 21:08:08 2016 |
J.L. Tain | Neutron moderator | Drawings of the polyethylene neutron moderator
and table assembly |
  |
31
|
Sat Jul 9 21:00:54 2016 |
J.L. Tain | Hardware | A list of the available hardware |
 |
30
|
Sat Jul 9 20:44:31 2016 |
J.L. Tain | BRIKEN neutron detector | START
Assembly and commissioning of BRIKEN neutron
detector
|
|
29
|
Mon May 11 09:14:54 2015 |
G. Kiss | 252Cf_data_sheet | The activity of the 252Cf source, used
for the calibration was 3.7 MBq at 15.05.2006.
Unfortunately, uncertainty is missing from |
|
28
|
Fri May 8 03:20:48 2015 |
J.Agramunt J.L.Tain K.Gabor | BnCorrelation | We run all the night until the end of beam
time, and the Bn correlations are more clear
now. |
|
27
|
Thu May 7 08:36:56 2015 |
J.L. Tain, J. Agramunt, A. Estrade, G.Kiss, T. Davinson, C.Griffin | First BRIKEN_v.0 beta-delayed neutron correlations? | During the 98,100Kr setting run we observe
in the time correlation plot (middle right |
|
26
|
Wed May 6 11:41:24 2015 |
J. Agramunt, A. Estrade | First online combined analysis | Screen shot of the rudimentary on-line
analysis of the combined data:
BRIKEN-AIDA-BigRIPS
|
|
25
|
Wed May 6 05:10:14 2015 |
J.L. Tain, J. Agramunt, G. Kiss | 94Se setting measurement | After the long shutdown the beam is back at
00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat |
|
24
|
Wed May 6 04:57:24 2015 |
J.L. Tain, J. Agramunt, G. Kiss | New degrader thickness | The Al degrader thickness was reduced to 4.8mm |
|
23
|
Tue May 5 05:29:26 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Ambient background measurement | Beam still down. New background measurement
with new RIKEN tube below the MUSIC chamber
|
|
22
|
Tue May 5 05:17:36 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Ambient background measurement |
Failure of
a quadrupole triplet at BigRIPS (some time
after earthquake)
We take the chance of |
|
21
|
Tue May 5 05:04:00 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Change of degrader thickness | For EURICA measurements degrader thickness
were increased
trying to decrease MACI and AIDA trigger |
|
20
|
Tue May 5 02:19:58 2015 |
j.Agramunt J.L.Tain K.Gabor | The Lower polyethylene pieces was swamped | The Lower polyethylene pieces was swamped.
In the photo beam comes from the
left. |
|
19
|
Mon May 4 15:03:47 2015 |
J.Agramunt J.L.Tain K.Gabor | New detector placed under the beam line | New detector placed under the beam
line, below MUSIC chamber
This detector replace the USA tubes |
  |
18
|
Mon May 4 04:14:18 2015 |
J.Agramunt J.L.Tain K.Gabor | AIDA trigger plugged in Mod2 Ch12 | AIDA trigger plugged in Mod2 Ch12 |
|
17
|
Mon May 4 03:20:00 2015 |
Shunji Nishimura | RNC New Rule | We have some new rule about the data taken
at RNC from this year.
Shunji |
|
16
|
Mon May 4 02:36:16 2015 |
J.Agramunt J.L.Tain K.Gabor | Maki trigger plugged in Mod2 Ch9 | |
|
15
|
Mon May 4 02:26:14 2015 |
J.Agramunt J.L.Tain K.Gabor | F11 trigger plugged in Mod2 Ch16 of Briken daq | |
|
14
|
Sun May 3 10:10:13 2015 |
J.L. Tain, J. Agramunt, G. Kiss | 94Se setting measurement | 94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
|
|
13
|
Sun May 3 10:07:25 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Photos of new PE shielding | Photos of the general arrangement and details
of the new PE blocks |
  |
12
|
Sun May 3 09:04:07 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Summary of neutron measurements |
U: (Up: 2 RIKEN tubes at 40cm from AIDA)
D: (Down: 12 RIKEN tubes at 80cm from AIDA)
|
|
11
|
Sat May 2 19:32:08 2015 |
AE | transfer data AIDA->BRIKEN | A test program for online data transfer is
available in aidas1 PC at:
|
|
10
|
Sat May 2 03:52:14 2015 |
J.L. Tain | 3He tube description | 3He tube drawings and technical details:
RIKEN, UPC, GSI, ORNL-1, ORNL-2 |
   |
9
|
Mon Apr 27 10:18:21 2015 |
K.Gabor S.Nishimura J.Agramunt | ORNL 3He tube at RIKEN | |
|
8
|
Mon Apr 27 04:40:43 2015 |
G. Kiss, J. Agramunt | neutron background at Eurica | Based on an about 8h long background measurement,
the neutron background at the Eurica site
was found to be about 0.006 neutron / sec |
|
7
|
Sat Apr 25 08:25:42 2015 |
G. Kiss, J. Agramunt | BRIKEN Test setup | Altogether 16 tubes are mounted for
the parasitic detector test (see the attached
photos): |
   |
6
|
Wed Feb 25 07:38:42 2015 |
A. Estrade J. Agramunt | Usage of synchronization test programs | In order to access to the synchronization
test, we prepare two programs in the PC
briken1 ( 10.32.6.54). |
 |
5
|
Tue Feb 24 09:34:54 2015 |
J. Agramunt, H. Baba, A. Estrade | [DAQ] DAQ correlation test |
We have performed a successful test of the
integration of independent DAQ systems based |
   |
4
|
Mon Feb 16 00:29:00 2015 |
Gabor KISS | Polyethyelene | The polyethelene arrived at RIKEN. Except
4 neighboring holes (located at the inner
ring) the alignment is OK. |
 |
3
|
Fri Oct 31 12:58:49 2014 |
Robert Grzywacz | Entry test - preamps | Here is a picture of one of our Mesytec preamplifiers.
We have located all seven of them.
They have 16 input channels and a common |
|
2
|
Fri Oct 31 11:36:57 2014 |
Alfredo Estrade | BRIKEN elog: take 2 | A elog for the setup of the
BRIKEN detector is now operational at |
|
1
|
Fri Oct 31 09:47:59 2014 |
Alfredo Estrade | BRIKEN elog: Hello world! | A elog for the setup of the BRIKEN detector
is now operational at https://elog.ph.ed.ac.uk/BRIKEN/
We have setup |
|