AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, all entries  ELOG logo
ID Date Author Subject Text Attachments
  419   Thu Nov 22 07:01:36 2018 ATPID high mass seting (165Pm) - RIBF148PID plot for the high mass setting (165Pm),
run 2018, rare earth peak experiment.
Partial statistics (~30h) from identification
 F7pid_RIBF148_165PmSetting_labels.png 
  418   Tue Nov 6 21:51:54 2018 NT BrewerNew D4Off.conf for HV also on github


V A V/s
V/s 1/0









------
--------------- --------- ----- ---- -------
  
  417   Mon Nov 5 22:47:40 2018 AT, JR, FM, PALow threshold, 252Cf, z=0cm, perpendicular 0 deg252Cf at z=0cm, i.e 0 cm from the center of
the detector,  source axis perpendicular
at 0 deg 
 Screenshot_from_2018-11-06_08-32-50.png 
  416   Mon Nov 5 21:24:20 2018 AT, JR, FM, PALow threshold, 252Cf, z=25cm, perpendicular 90 deg252Cf at z=25cm, i.e 25 cm from the center
of the detector,  source axis perpendicular
at 90 deg 
  
  415   Mon Nov 5 19:55:20 2018 AT, JR, FM, PALow threshold, 252Cf, z=0cm, perpendicular 90 deg252Cf at z=0cm, i.e 0 cm from the center of
the detector,  source axis perpendicular
at 90 deg 
  
  414   Mon Nov 5 18:52:54 2018 MW, KRsuspicious clover G7 temp sensor 




  
  413   Mon Nov 5 18:05:48 2018 AT, JR, FM, PALow threshold, 252Cf, z=25cm, perpendicular 0 deg252Cf at z=25cm, i.e 25 cm from the center
of the detector,  source axis perpendicular
 
  
  412   Mon Nov 5 16:43:43 2018 FM, PA,Low threshold, 252Cf, z=25cm, Parallel downstream252Cf at z=25cm, i.e 25 cm from the center
of the detector,  source axis parallel downstream
  
  411   Mon Nov 5 15:10:43 2018 FM, PA,Low threshold, 252Cf, z=15cm, Parallel downstream252Cf at z=15cm, i.e 15 cm from the center
of the detector,  source axis parallel downstream
  
  410   Mon Nov 5 13:43:57 2018 FM, PALow threshold, 252Cf, z=0cm, Parallel downstream252Cf at z=0cm,ie center of moderator, source
axis parallel downstream 
Low threshold.
  
  409   Mon Nov 5 12:04:08 2018 FM, PA, ATLow threshold, 252Cf, z=15cm, Perpendicular 0deg252Cf at z=15cm,ie center of moderator, source
axis perpendicular at 0deg (typical orientation)
Low threshold.
  
  408   Mon Nov 5 09:59:36 2018 MW, KRsuspicious clover G7 temp sensorWe observed 6 pm LN2 filling of both clovers
on Monday Nov 5th.

D4 went full within reasonable
  
  407   Mon Nov 5 09:32:00 2018 FM, JR, PA, ATLow threshold, 252Cf, z=0cm, Perpendicular 0deg252Cf at z=0cm,ie center of moderator, source
axis perpendicular at 0deg (typical orientation)
Low threshold.
  
  406   Mon Nov 5 06:46:30 2018 KR, YR, MW, JLT, ...Clover check
With detectors still on the floor we check
signals and found
 Screenshot_from_2018-11-05_15-57-40.pngScreenshot_from_2018-11-05_16-23-12.png 
  405   Fri Nov 2 14:18:54 2018 JLT136Sn at ZDSMeasurement of neutron background while
Jungclaus experiment is running
Secondary beam 136Sn at ~140MeV/u, Be target,
  
  404   Fri Nov 2 01:07:21 2018 JLT134Sn/133In on ZDSMeasurement of neutron background while
Jungclaus experiment is running
Secondary beam: 
 Screenshot_from_2018-11-02_10-17-34.pngScreenshot_from_2018-11-02_10-20-20.pngScreenshot_from_2018-11-02_10-21-50.png 
  403   Wed Oct 31 03:41:33 2018 JLT134Sn at ZDSMeasurement of neutron background while
Jungclaus experiment is running
Secondary beam 134Sn at ~140MeV/u, Au target,
  
  402   Wed Oct 31 00:36:34 2018 JLT133In at ZDSMeasurement of neutron background while
Jungclaus experiment is running
Secondary beam 134Sn at XXMeV, Be target,
  
  401   Tue Oct 30 01:01:42 2018 JLT, AAAdjustment of 3He thresholdsBackground with BigRIPS+ZD already working
No pulser
 181030_Conf_BrikenFull_LowThrAdj_masterCLK.xlsxScreenshot_from_2018-10-30_16-22-32.png 
  400   Mon Oct 29 12:08:12 2018 JR, JA, ATBackground
Background was measurement
Pulser: NO
  
  399   Sun Oct 28 07:41:03 2018 AT, JA, AABackgroundDacq was reinitialized
Background was measurement
Pulser: YES
  
  398   Fri Oct 26 15:15:55 2018 JA, ATS, ATD, JLT, AABackground measurements
No pulser (inhibit in clock)
DLT: 181026_2244_Bkg_NoPulser_114.dlt
  
  397   Fri Oct 26 03:57:37 2018 ATS & JLTBackgroundBackground BRIKEN control measurement
No DLT
  
  396   Fri Oct 26 03:31:33 2018 AT2 & JATest pulser effect on baselineWe have tested possible change of the baseline
in the digitizer due to the pulser connection.
NO EFFECT has been
 6x 
  395   Fri Oct 26 03:24:25 2018 ATS & JLTBackgroundBackground BRIKEN control measurement
No DLT
  
  394   Thu Oct 25 16:08:53 2018 ATS & JLTLead bricksLead bricks in BRIKEN hole to protect AIDA   
  393   Thu Oct 25 16:04:17 2018 ATS & JLTBackgroundBackground BRIKEN control measurement
No DLT
  
  392   Thu Oct 25 09:32:25 2018 AT & ATLow threshold, 252Cf, z=25cm, Perpendicular 90deg252Cf at z=25cm,ie 25 cm upstream the beam,
source axis perpendicular at 90deg with respect
to typical
  
  391   Thu Oct 25 09:18:24 2018 ATS & JLTF11 plasticF11 plastic (long plastic after MUSIC chamber)

connected to DACQ.
  
  390   Thu Oct 25 09:07:00 2018 ATS & JLTBRIKEN Calibration checkWe put the 252Cf source and check the aligment
of 3He tubes gains:
  
  389   Thu Oct 25 04:14:00 2018 AT & ATLow threshold, 252Cf, z=25cm, Perpendicular 90deg252Cf at z=25cm,ie 25 cm upstream the beam,
source axis perpendicular at 90deg with respect
to typical
 181025_0213_252Cf_z25cm.png 
  388   Thu Oct 25 00:53:43 2018 AT & ATLow threshold, 252Cf, z=-25cm, Perpendicular 90deg252Cf at z=-25cm,ie 25 cm downstream the beam,
source axis perpendicular at 90deg with respect
to typical
  
  387   Wed Oct 24 16:11:32 2018 AT & ATLow threshold, 252Cf, z=-25cm252Cf at z=-25cm,ie 25 cm downstream the beam,
source axis parallel.
Low threshold.
  
  386   Wed Oct 24 11:28:42 2018 AT & ATLow threshold, 252Cf, z=-25cm252Cf at z=-25cm,ie 25 cm downstream, source
axis perpendicular, typical orientation.
Low threshold.
  
  385   Wed Oct 24 11:27:51 2018 AT & ATLow threshold, 252Cf, z=10cm, source axis parallel252Cf at z=10cm, source axis parallel upstream
to the beam.
Low threshold.
  
  384   Wed Oct 24 07:42:42 2018 AT & ATLow threshold, 252Cf, z=10cm, source axis parallel252Cf at z=10cm, source axis parallel upstream
to the beam.
Low threshold.
  
  383   Wed Oct 24 03:49:01 2018 AT & ATLow threshold, 252Cf, z=0cm252Cf at z=10cm, source axis perpendicular
to beam axis, typical orientation.
Low threshold.
  
  382   Mon Oct 22 16:54:10 2018 AT & ATbackground, low threshold, No Pulser18/10/23 START: 00:53
18/10/24 STOP: 10:12 
Background measurements. Checking noise!
 181023_0053_Nopulser_bckgn_1012.png 
  381   Mon Oct 22 11:42:50 2018 AT & AT252Cf, z=25cm, no clovers252Cf source placed using cardboard piece
at z=25cm, source axis parallel upstream
to the beam axis.
  
  380   Mon Oct 22 08:15:52 2018 AT & AT252Cf, z=15cm, no clovers252Cf source placed using cardboard piece
at z=15cm, source axis parallel to the beam
axis.
  
  379   Mon Oct 22 03:11:32 2018 AT & ATbackground, high threshold, Pulser UPC18/10/22 START: 11:13
18/10/22 STOP: 15:59
Background measurements. Checking noise!
  
  378   Sun Oct 21 15:16:40 2018 AT & ATbackground, high threshold, Pulser RIKEN+ORNL18/10/21 START: 23:16
18/10/22 STOP: 11:06
Background measurements. Checking noise!
  
  377   Sun Oct 21 11:18:31 2018 AT & ATLow threshold, NO pulser, 252Cf, z=0cm18/10/21 START: 19:21
18/10/21 STOP: 23:04
252Cf at z=0cm, source axis perpendicular
  
  376   Sun Oct 21 08:58:23 2018 AT & ATbackground, high threshold, NO pulser18/10/21 START: 16:58
18/10/21 STOP: 19:09
Background measurements. Checking noise!
  
  375   Sun Oct 21 06:04:43 2018 AT & ATbackground, high threshold18/10/21 START: 14:10
18/10/21 STOP: 16:41
Background measurements. Checking noise!
 181021_1410_bckgn_pulser_highThr.png 
  374   Sun Oct 21 03:19:54 2018 AT & ATbackground, high threshold
18/10/20 START: 20:30 approx 
18/10/21 STOP: 11:20
  
  373   Fri Oct 19 15:38:11 2018 AT & AT252Cf, z=0cm, no clovers, noise check individual tubes
18/10/19 START: 23:39
18/10/20 STOP: 18:30
 Screenshot_from_2018-10-20_18-45-17.png 
  372   Fri Oct 19 11:45:12 2018 AT & AT252Cf, z=0cm, no clovers
18/10/19 START: 19:46
18/10/19 STOP: 23:33
  
  371   Fri Oct 19 11:28:31 2018 AT & AT252Cf, z=0cm, no clovers, test online dead timeDuring previous measurement a high dead time
in the online was observed (50%). after restarting
the crates and
  
  370   Fri Oct 19 10:27:22 2018 AT & AT252Cf, z=0cm, no clovers (***** CHECK DATA)
18/10/19 START: 18:25
18/10/19 STOP: 19:19
  
  369   Fri Oct 19 04:02:36 2018 AT & AT252Cf, z=0cm, no clovers (***** CHECK DATA)
18/10/19 START: 12:05
18/10/19 STOP: 16:44
  
  368   Fri Oct 19 00:28:48 2018 AT2, JLT, SNbackground measurement, no clovers
18/10/19 START: 08:31
18/10/19 STOP: 10:50
 Screenshot_from_2018-10-19_10-47-54.pngScreenshot_from_2018-10-19_10-55-30.png 
  367   Thu Oct 18 15:24:40 2018 AT2, JLT, SN252Cf long measure, z=25cm beam upstream, no clovers
18/10/18 START: 23:23
18/10/19 STOP: 08:23
  
  366   Thu Oct 18 12:16:39 2018 AT2, JLT, SN252Cf long measure, z=15cm beam upstream, no clovers
18/10/18 START: 20:20
18/10/18 STOP: 23:17
  
  365   Thu Oct 18 08:21:18 2018 AT2, JLT, SN252Cf long measure, z=0cm, no clovers
18/10/18 START: 17:22
18/10/18 STOP: 20:09
  
  364   Thu Oct 18 03:11:56 2018 AT & ATbck meas18/10/18 START: 10:54
18/10/1X STOP: 14:02
  
  363   Thu Oct 18 00:31:55 2018 AT & AT252Cf long measure, z=0cm, threshold 5% lower18/10/18 START: 08:31
18/10/18 STOP: 10:50
  
  362   Wed Oct 17 14:11:18 2018 AT & AT252Cf long measure, z=0cm, threshold 5% lower
18/10/17 START: 22:04
18/10/17 STOP: 08:18
  
  361   Wed Oct 17 09:20:20 2018 AT & AT252Cf long measure18/10/17 START: 18:16
18/10/17 STOP: 22:00
  
  360   Tue Oct 16 09:00:02 2018 ATD & JLTBackground measurement overnight
18/10/16 START: 16:56
18/10/17 STOP: 9:51
 He121.png 
  359   Tue Oct 16 08:57:56 2018 ATD & JLT252Cf source252Cf source Run 
START:?
STOP: 16:56
 181016_1656_252Cf.root 
  358   Tue Oct 16 03:15:03 2018 ATD & JLTStart of REP run preparation (RIBF148)16-Oct-2018

- Start DACQ computer: OK!
 Screenshot_from_2018-10-16_14-57-33.png 
  357   Fri Dec 1 07:29:47 2017 Vi Ho Phong[Hardware][Configuration] Return the PB-5 Pulse generator (Pulser 2) and the 428F Linear Fan in-out modules and replace with a new Linear Fan in-out module The PB-5 Pulse generator labeled "Pulser 2"
and the 428F Linear Fan in-out labeled "Clover
G7" from BRIKEN NIM crate have to be returned
 7x 
  356   Fri Nov 24 00:45:36 2017 ATur17b BRIKEN filesList of files in BRIKEN DAQ PC:

Experiment DA1702 (including the test with
  
  355   Thu Nov 16 02:32:23 2017 BRIKEN collaborationYSO thresholdsYSO Tests 
Thresholds & calibrations
 dynVSdynGated.png 
  354   Tue Oct 31 06:57:53 2017 OH, TDAIDA Oct17 Beam Test AnalysisPDF file attached with the preliminary analysis
of the October 2017 AIDA in beam test.
 AIDA_Test_Results.pdf 
  353   Fri Oct 27 10:04:31 2017 SG, RYLISE++ file for BRIKEN1Here attached the lise file for BRIKEN1  Cu82_Be5mm_Brho7.7000Tm_F1deg8mm_F5deg8mm_F7_D80mod_F11nuclei.png 
  352   Thu Oct 26 09:01:53 2017 BCRNumber of Counts vs Expected Efficiency for Proposals 

Here is a doc with an estimate
of the statistical uncertainty P1n and P2n
 ExpectedBRIKEN_Precision.pdf 
  351   Wed Oct 25 19:14:09 2017 NBFirst pass efficiency for current experimentI roughly (~10%) checked the efficiency
for 4 of the peaks from  171025_1222_1355_152EuCloverCal.root.

I checked the peaks at 122, 245,
  
  350   Wed Oct 25 18:12:43 2017 Sunflower collaborationGamma sources web pagehttp://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html   
  349   Wed Oct 25 17:49:09 2017 JT, AM, NB, DS, DM, ATpulser in CLOVERSG7 pulser weird behavior

  
  348   Wed Oct 25 01:02:14 2017 RGStatus of the YSO arrayThe presently used detector has 48x48x5
mm3 YSO array with 1x1mm2 segments. They
are separated with ESR.  We use H8500
  
  347   Tue Oct 24 13:14:47 2017 RYCalibration data for cloversfor energy calibration with 152Eu source

171024_1858_152Eu_G7.root
171024_2112_152Eu_D4.root
 171024_1858_152Eu_G7.root171024_2112_152Eu_D4.root 
  346   Tue Oct 24 03:08:23 2017 RG, RY, MS, JA, RCF, SG, ATlight pulser YSOlight pulser measurement
SN's pulse generator 20ns width
 171024_1107_YSOPlots.rootScreenshot_from_2017-10-24_11-09-54.png 
  345   Mon Oct 23 09:43:00 2017 RG, RY, MS, SG, AT137Cs YSOmeasurement of 137Cs with YSO 
after matching the gains of the 
HighGain channels
 171023_1655_137CsYSO.root171023_1655_1741_137CsYSO_070.rootScreenshot_from_2017-10-23_17-51-37.pngScreenshot_from_2017-10-23_17-54-53.png 
  344   Sun Oct 22 11:32:59 2017 JA,ATD, JLTNew Gasific Configuration file   171022_1846_Conf_BrikenFullYSO.xlsx 
  343   Sun Oct 22 11:14:35 2017 JA,ATD,JLT,RG,RY,SG,MS,PV,Liu,KR252Cf source Wasabi-BrikenYSO252Cf source in the middle of Wasabi and YSO
in front of Clover D4
  
  342   Sun Oct 22 10:26:44 2017 JA,ATD,JLT,RG,RY,SG,MS,PV,Liu,KRFirst Wasabi-YSO-BRIKEN correlation test60Co source between YSO and Wasabi in front
of D4 Clover
Briken configuration file: 171022_1811_Conf_BrikenFullYSO.xlsx
 171022_1846_Conf_BrikenFullYSO.xlsx171022_1846_60Co_WasabiBrikenYSO.png 
  341   Sun Oct 22 08:52:17 2017 KR,JA,ATD,JLTClover resolutionResolution check using 40K 1460 keV line 
in the background measurement overnight
(File: 171022_0126_1101_bck.root)
  
  340   Sun Oct 22 05:15:26 2017 RG,RY,MS,ATD,JA,JLTCheck of YSOWe start a systematic check of YSO in BRIKEN
DACQ
 12x 
  339   Sat Oct 21 17:30:23 2017 JA, ATD, JLTBackground measurement overnight22/10/2017
Start: 01:26
Run: 037
 Screenshot_from_2017-10-22_11-26-49.pngScreenshot_from_2017-10-22_11-26-10.pngScreenshot_from_2017-10-22_11-26-28.png 
  338   Sat Oct 21 17:14:55 2017 JA, ATD, JLT252Cf efficiency calibrationMeasurement of BRIKEN neutron counter efficiency
252Cf source in the (approximately) center
Wasabi and D4 clover inserted. G7 on the
 Screenshot_from_2017-10-22_01-21-51.png 
  337   Sat Oct 21 17:11:03 2017 JA, ATD, JLTNew Gasific configuration fileConfiguration file saved on 22-Oct-2017 at
00:59
after increasing all the threshold in all
 171022_Conf_BrikenFullYSO.xlsx 
  336   Sat Oct 21 17:05:21 2017 JA,ATD, JLTNew DACQ hardware configurationConfiguration of BRIKEN DACQ hardware:
Detector->VME->ADC->Channel
 TubeAncillaryDACQDistribution-October2017.xlsx 
  335   Sat Oct 21 07:26:13 2017 NB, RY, BD, MSCorrected Calibration D4  K R G B
m 0.001558636 0.0006599344 0.0015311753 0.0015807021
b -0.6545742444 0.4330534066 2.001278013 1.0994163913
 D4Oct19.ods 
  334   Sat Oct 21 04:18:17 2017 NBDraft of Instructions for HVSetup:

  
  333   Fri Oct 20 08:27:05 2017 BC RascoAnalysis SlidesHere are the ORNL/UTK BRIKEN analysis slides
presented by BC Rasco on 2017/10/20.

 
 PreliminaryPnCalcsWithBkgCoin_BRIKENGroup.pdf 
  332   Fri Oct 20 05:33:11 2017 KR, NB, SG, RY, JL, AT: Calibration and Resolution of D4 (after Repair) Green and Red channels were repaired by
crimping and securing the grounding of the
cables and fixing the cables securely to
 IMG_20171019_105549066.jpgD4Oct19.ods 
  331   Wed Oct 18 08:46:23 2017 NB, SG, AT, JLClover G7 resolutionG7 clover was on the stand
Source: 152Eu
File: 171018_1627_152Eu_G7.root
 171018_1627_152Eu_G7.root 
  330   Mon Oct 16 05:52:14 2017 BRIKEN collaborationSTART preparationWe start to check every thing for the coming
run
 171016_Conf_BrikenFull.xlsx 
  329   Thu Jun 15 10:07:56 2017 BRIKEN collaborationGamma calibrationsClover calibrations. 

- Datafiles are located in the
dac computer, path:
 WhatsApp_Image_2017-06-15_at_18.00.36.jpegWhatsApp_Image_2017-06-15_at_18.00.51.jpegWhatsApp_Image_2017-06-15_at_18.37.12.jpeg 
  328   Thu Jun 15 03:40:17 2017 BRIKEN collaborationZ-scaning 252Cf Jun17A scaning with 252Cf along the Z-axis of
the neutron detector is carried out. The
setup is similar to the scaning carried out
 WhatsApp_Image_2017-06-15_at_18.11.52.jpeg 
  327   Wed Jun 14 06:22:21 2017 Ariel, Liu, Go, NishinmuraHV is offTo protect HPGe and 3He tubes from high
intentsity primary beam, HV of these detector
are off and the HPGe will be dismounted.
  
  326   Tue Jun 13 08:02:35 2017 briken team133Ba calibrationAfter experiment 133Ba calibration

Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx
  
  325   Tue Jun 13 07:35:35 2017 briken team133Ba calibrationAfter experiment 133Ba calibration

Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx
  
  324   Tue Jun 13 06:50:12 2017 Briken Colaboration152Eu calibrationAfter experiment 152Eu calibration

 170604_Conf_BrikenFull_AfterCrisis.xlsx 
  323   Tue Jun 13 05:18:07 2017 PVHow to install ELOG for BRIKEN campaign 2017a Get ELOG software including entries for BRIKEN
campaign 2017a from mars computer:
  
  322   Mon Jun 12 22:28:02 2017 OscarThe SUSHIRO app guideIt's here...it's rough...but it hopefully
gets the job done
 SUSHIRO_For_Dummies_V001.pdf 
  321   Mon Jun 12 02:45:44 2017 Iris Dillmann ATSetup detectors. Id of Ancillary@BRIKENAttachment 1: Setup detectors 
Attachment 2: example of configuration file
(valid only for RIBF127). The Id of the ancillary
 Setup-26May2017.pngOfflineConf_Signals.csv 
  320   Mon Jun 12 02:38:27 2017 JA AA AIM AT ATVME crate & new configurationSun Jun 4 2017 11:16:45 VME crate #1 crashed
New configuration file of BRIKEN
 170603_Conf_BrikenFull.xlsx 
  Draft   Mon May 29 07:06:56 2017 K. MatsuiEnergy loss in Long Plastic ScintillatorAfter Al degrader with the optimized width
of 13 mm, the energy loss in Long Plastic
Scintillator is 546(2) MeV at F11.
  
  Draft   Mon May 29 05:40:49 2017 K. Matsuienergy loss at logn     
  317   Mon May 29 04:17:34 2017 YSClover EfficiencyClover gamma detection efficiency calculation
with 152Eu
Date of the measurement: 2017-05-26 10:15
 eff_crystal.pdfeff_total.pdfEURICA_efficiency.jpg 
  316   Sun May 28 11:41:24 2017 YSCLOVER energy calibrationClover calibration with 152Eu

Used peaks [keV]: 121.7817, 244.6975, 344.2785,
  
  315   Sat May 27 11:19:57 2017 AIM, ATAIDA+BRIKEN backgroundBackground measurement AIDA+BRIKEN
AIDA is inside BRIKEN
  
  314   Sat May 27 10:36:20 2017 JA,AT,JLTBRIKEN DACQManuals for BRIKEN DACQ: 
GasificShort.pdf including "Run protocol"
and Gasific70Manual.pdf (long)
 Gasific70Manual.pdfGasificShort.pdf 
  312   Sat May 27 04:46:55 2017 AIMsources infoHere is the sunflower webpage with information
on the calibration sources:
  
  311   Fri May 26 14:42:12 2017 JL, ATBackgroundBackground measurement (no AIDA)

  
  310   Fri May 26 14:27:08 2017 AIM, ATBRIKEN Configuration FileNew configuration file of BRIKEN
Changes of 26th-May-2017
Previous config file 24th-May-2017
 170526_Conf_BrikenFull.xlsx 
  308   Fri May 26 09:07:46 2017 J. AgramuntSynchronization MonitoringWe started the synchronization monitoring
programs to check that
it is OK as can be seen in the figure below
 synchroCheck.pngSynchronizationMonitoring.pdf 
  307   Fri May 26 04:20:54 2017 JLT,AA,ATCLOVER 60Co60Co No AIDA, Efficiency calibration

Start: 12:21
  
  306   Fri May 26 03:52:23 2017 AT,AA,JLTCLOVER, 137Cs137Cs, No AIDA, Efficiency calibration

Source ID: 393
  
  305   Fri May 26 03:24:38 2017 GK,VP, AT, AACLOVER, 133Ba133Ba source efficiency calibration, no AIDA

Start: 11:23
  
  304   Fri May 26 02:17:40 2017 AT, AIM, JLT,AA, PV, KM152EuCalibration with 152Eu source.

START time:10:15
  
  303   Thu May 25 14:31:46 2017 AT, JLT, AA, AIMBackground measurementBackground, No AIDA

Start:22:31
 7x 
  302   Thu May 25 13:56:00 2017 AT, JLT, AA252Cf252Cf source in Z=0cm position. 

Start:21:57
  
  301   Thu May 25 13:42:45 2017 AT, PC,KR,JLT,AA252Cf252Cf source in Z=0cm position. 

Start:21:41
  
  300   Thu May 25 13:38:11 2017 AT, PC, KR, JLT, AAClover, detectors in new positionBoth clover detectors were moved. They are
in a symmetrical position. The end on the
clover nose is of the order
 CLOVER-sketch.jpgD4-insertion.jpgG7-insertion.jpg 
  299   Thu May 25 13:24:02 2017 AT,PC,KR,JLT,AACLOVER, detector not in its rigth positionWe have noticed that D4 is not in its right
position. That explains the different number
of counts in the
  
  298   Thu May 25 12:53:47 2017 AT, PC, JLT, KR, AAClover, 60Co60Co source 

Source ID: CD395
  
  297   Thu May 25 12:49:55 2017 AT, JLT,PC,AAClover, 133Ba, LN2 fillingWe started the measurement of the source when
the N2 filling started. Just to  check if
there are funny things
  
  296   Thu May 25 10:15:02 2017 A.T, G. K, A.M, A. ACLOVER, 133Ba no pulser
Source in position z=0 with the carton (cardboard)
high-end, high-tech holder, but no AIDA (of
  
  295   Thu May 25 09:51:37 2017 A.T, A.ACLOVER, Ba133Source details:

Diameter: 25.05 mm
 170525_133Ba_D4_D4pulser.png 
  294   Wed May 24 13:22:46 2017 JLT,AT,KR,SG,RY,...CLOVER 152EuWe connect the pulser to both CLOVERs

G7: It looks OK except for the G7-Green as
 170525_152Eu_CloversRate.png 
  293   Wed May 24 06:42:05 2017 JLT,AT,AM,RY,SGSTART PreparationWe start to check every thing for the coming
run
  
  292   Sun Apr 2 16:18:57 2017 AllEND OF PARASITIC RUN    
  291   Sun Apr 2 01:04:24 2017 JLT ID JA GK CG VP YS LiuBackgroundDate: 2/04/2017 
Start: 09:05
BRIKEN run: 76
  
  290   Sun Apr 2 00:44:01 2017 ID JA GK CG VP Liu JLT39Al run 75Date: 2/04/2017 
Start: 08:42
BRIKEN run: 75
  
  289   Sun Apr 2 00:19:01 2017 ID JA GK CG YS SN Liu VP 39Al run 74Date: 2/04/2017 
Start: 08:17
BRIKEN run: 74
  
  288   Sat Apr 1 22:41:22 2017 ID, GK, SN, Liu YS JLT38Mg run 73Date: 2/04/2017 
Start: 06:37
BRIKEN run: 73
  
  287   Sat Apr 1 22:18:00 2017 Liu, YS, CG, GK, SN, JLT 38Mg run 72DUMMY   
  286   Sat Apr 1 21:37:42 2017 YS, Liu, CG37Na run 71Date: 2/04/2017 
Start:04:47
BRIKEN run: 71
  
  285   Sat Apr 1 19:48:41 2017 YS,CG,LIU37Na,run 70Date: 2/04/2017 
Start:03:47
BRIKEN run: 70
  
  284   Sat Apr 1 18:48:20 2017 YS, LIU, CG37Na run 69Date: 2/04/2017 
Start:02:47
BRIKEN run: 69
  
  283   Sat Apr 1 17:45:01 2017 YS,CG,LIU37Na, run 68Date: 2/04/2017 
Start:01:44
BRIKEN run: 68
  
  282   Sat Apr 1 16:17:59 2017 YS,CG, LIU37Na run 67Date: 2/04/2017 
Start:00:17
BRIKEN run: 67
  
  281   Sat Apr 1 15:16:45 2017 JLT OH VP Liu YS37Na run 66Date: 1/04/2017 
Start:23:13
BRIKEN run: 66 
  
  280   Sat Apr 1 14:21:31 2017 PV OH Liu JLT37Na run 65Date: 1/04/2017 
Start:22:12
BRIKEN run: 65 
  
  279   Sat Apr 1 13:15:37 2017 JA ID OH PVNa37 Ne36 Run 064Date: 1/04/2017 
Start:21:13
BRIKEN run: 63 
  
  278   Sat Apr 1 12:15:21 2017 PV, OH, JLT, ID, JA37Na run 63Date: 1/04/2017 
Start:20:15
BRIKEN run: 63 
  
  277   Sat Apr 1 11:13:42 2017 PV,OH,JLT37Na run 62Date: 1/04/2017 
Start:19:09
BRIKEN run: 62 
  
  276   Sat Apr 1 10:26:07 2017 VP,OH,JLT37Na run 61Date: 1/04/2017 
Start:18:25
BRIKEN run: 61 
  
  275   Sat Apr 1 10:15:44 2017 VP,OH,JLT37Na run 60Date: 1/04/2017 
Start:17:40 
BRIKEN run: 60 
  
  274   Sat Apr 1 08:39:47 2017 ID OH JLT36Ne 37Na run 059Date: 1/04/2017
Start:16:38
BRIKEN run: 59
  
  273   Sat Apr 1 06:49:00 2017 ID,GK,JA,DK,SN,JLT37Na run 58Date: 1/04/2017
Start:14:48
BRIKEN run: 58
  
  272   Sat Apr 1 05:01:24 2017 ID DK GK JLT36Ne 37Na run 057Date: 1/04/2017
Start:13:00
BRIKEN run: 57
  
  271   Sat Apr 1 04:03:31 2017 ID JA DK GKNa37 Ne36 run 056Date: 1/04/2017
Start:12:00
BRIKEN run: 56
  
  270   Sat Apr 1 02:07:49 2017 ID DK JARun 55Date: 1/04/2017
Start:10:04
BRIKEN run: 55
  
  269   Sat Apr 1 01:04:31 2017 ID DK JANa37 Ne36 Run 54Date: 1/04/2017
Start: 09:03
BRIKEN run: 54
  
  268   Sat Apr 1 00:04:10 2017 ID GK DK Liu37Na or 36Ne labels?The BigRIPS settings are all called "36Ne
setting" but the night shift labels these
runs in the BRIKEN DAQ as
  
  267   Fri Mar 31 23:41:57 2017 ID, LIU, DK, GK37Na run 53Date: 1/04/2017
Start: 07:41
BRIKEN run: 53
  
  266   Fri Mar 31 22:45:21 2017 YS, LIU, DK37Na run 52Date: 1/04/2017
Start: 06:45
BRIKEN run: 52
  
  265   Fri Mar 31 22:22:40 2017 YS, LIU, DK37Na run 51Date: 1/04/2017
Start: 06:23
BRIKEN run: 51
  
  264   Fri Mar 31 21:45:25 2017 YS, LIU, OH, DK37Na run 50Date: 1/04/2017
Start: 05:45
BRIKEN run: 50
  
  262   Fri Mar 31 21:00:57 2017 YS, LIU, OH37Na run 49Date: 1/04/2017
Start: 04:59
BRIKEN run: 49
  
  261   Fri Mar 31 20:40:47 2017 YS, LIU, OH37Na run 48Date: 1/04/2017
Start: 04:38
BRIKEN run: 48
  
  260   Fri Mar 31 19:31:15 2017 YS, LIU, OH, CG37Na, run47Date: 1/04/2017
Start: 03:30
BRIKEN run: 47
  
  259   Fri Mar 31 18:28:54 2017 JLT, YS Liu, OH, CG37Na run 46Date: 1/04/2017
Start: 02:46
BRIKEN run: 46
  
  258   Fri Mar 31 18:00:41 2017 JLT,SN,JLiu,YS,CG37Na run 45Date: 1/04/2017
Start: 01:57
BRIKEN run: 45
  
  257   Fri Mar 31 16:56:16 2017 JLT, YS,Liu,PV,CGNew Configuration fileNew configuration file: 
170331_Conf_BrikenFull.xlsx
  
  256   Fri Mar 31 15:30:24 2017 JLT, PV, Liu, SN, CG34Ne run 44Date: 31/03/2017
Start: 23:27
BRIKEN run: 44
  
  255   Fri Mar 31 14:40:56 2017 JLT, PV, Liu, CG34Ne run 43Date: 31/03/2017
Start: 22:19
BRIKEN run: 43
  
  254   Fri Mar 31 13:04:01 2017 JLT JA ID PV32Ne Run 42Date: 31/03/2017
Start: 22:01
BRIKEN run: 42
  
  253   Fri Mar 31 11:46:44 2017 ID PV CG40Mg Run 041Date: 31/03/2017
Start: 19:43
BRIKEN run: 41
  
  252   Fri Mar 31 10:35:22 2017 PV CG JARun 40Date: 31/03/2017
Start: 
BRIKEN run: 40
  
  251   Fri Mar 31 09:23:45 2017 CG PV JARun 39Date: 31/03/2017
Start: 17:22
BRIKEN run: 039
  
  250   Fri Mar 31 08:23:32 2017 CG PV JARun 38Date: 31/03/2017
Start: 16:21
BRIKEN run: 038
  
  249   Fri Mar 31 07:17:03 2017 OH PV JA CGRun 37Date: 31/03/2017
Start: 15:24
BRIKEN run: 037
  
  248   Fri Mar 31 05:27:44 2017 OH,SN,JA,PV40Mg run 36Date: 31/03/2017
Start: 13:24
BRIKEN run: 036
  
  247   Fri Mar 31 04:57:01 2017 ID,YS,JLT,OH40Mg run 35Date: 31/03/2017
Start: 12:24
BRIKEN run: 035
  
  246   Fri Mar 31 03:54:26 2017 ID JLTRun 034: gamma spectra background linesThere is a strong background line at ~1293
keV. According to the attached document this
could come from the
 natural-gammas.pdf 
  245   Fri Mar 31 03:26:53 2017 ID OH SN40Mg Run 034Date: 31/03/2017
Start: 11:23
BRIKEN run: 034
  
  244   Fri Mar 31 02:26:19 2017 ID RCF40Mg Run 033Date: 31/03/2017
Start: 10:23
BRIKEN run: 033
  
  243   Fri Mar 31 01:50:15 2017 ID, RCF40Mg Run 032Date: 31/03/2017
Start: 10:01
BRIKEN run: 032
  
  242   Fri Mar 31 01:01:58 2017 ID RCF OHRun 031Date: 31/03/2017
Start: 08:58
BRIKEN run: 31
  
  241   Fri Mar 31 00:01:55 2017 ID JA DK GK LiuRun 030Date: 31/03/2017
Start: 07:58
BRIKEN run: 30
  
  240   Thu Mar 30 22:19:22 2017 Liu DK KG JA IDRun 28-29Date: 31/03/2017
Start: 06:30
BRIKEN run: 28
  
  238   Thu Mar 30 21:01:54 2017 JA DK KG LiuRun 27Date: 31/03/2017
Start: 5:04
BRIKEN run: 27
  
  237   Thu Mar 30 20:13:11 2017 JA, GK, DK40Mg run25Date: 31/03/2017
Start: 04:13
BRIKEN run: 25
  
  236   Thu Mar 30 19:16:46 2017 GK,DK,JLiu,JA,JLT40 Mg run 24Date: 31/03/2017
Start: 03:14
BRIKEN run: 24
  
  235   Thu Mar 30 18:14:59 2017 JLT,DK,GK, Liu40Mg run23Date: 31/03/2017
Start: 02:14
BRIKEN run: 23
  
  234   Thu Mar 30 17:17:21 2017 JLT,GK,DK,JLiu40Mg run 22Date: 31/03/2017
Start: 01:14
BRIKEN run: 22
  
  233   Thu Mar 30 16:15:24 2017 SN, JLT, GK, DK, JLiu40Mg run 21Date: 31/03/2017
Start: 00:12
BRIKEN run: 21
  
  232   Thu Mar 30 13:35:30 2017 JLT,TD, JLiu,SN, GK40Mg run 20Date: 30/03/2017
Start: 21:33
BRIKEN run: 20
 screenshoot_170330_2351.png 
  231   Thu Mar 30 12:27:44 2017 JLT,TD,JLiu,SN40Mg run 19Date: 30/03/2017
Start: 20:26
BRIKEN run: 19
  
  230   Thu Mar 30 11:35:52 2017 JLT,TD,PV,JLiu40Mg run 18Date: 30/03/2017
Start: 19:33
BRIKEN run: 18
  
  229   Thu Mar 30 10:26:06 2017 JLT,TD,PV40Mg run 17Date: 30/03/2017
Start: 18:24
BRIKEN run: 17
  
  228   Thu Mar 30 09:24:45 2017 JLT,RC,TD,PV,SN40Mg run 16Date: 30/03/2017
Start: 17:22
BRIKEN run: 16
  
  227   Thu Mar 30 07:41:58 2017 RCF PV SN CG JARun 15Date: 30/03/2017
Start: 16:05
BRIKEN run: 15
  
  226   Thu Mar 30 07:31:09 2017 SN PV CG RCF JARun 14Date: 30/03/2017
Start: 15:30
BRIKEN run: 013
  
  225   Thu Mar 30 06:30:06 2017 JA CG PV SNRun 13Date: 30/03/2017
Start: 14:25
BRIKEN run: 013
  
  224   Thu Mar 30 05:56:28 2017 JLT,JA,CG,PV40Mg Run 12Date: 30/03/2017
Start: 13:54
BRIKEN run: 012
  
  223   Thu Mar 30 04:49:52 2017 JLT,TD40Mg Run 11Date: 30/03/2017
Start: 12:47
BRIKEN run: 011
  
  222   Thu Mar 30 03:55:42 2017 J. Agramunt40Mg Run 10Date: 30/03/2017

Start: 11:52
  
  221   Thu Mar 30 01:46:30 2017 J.Agramunt40Mg Run 009 Date: 30/03/2017

Start: 09:47
  
  220   Thu Mar 30 00:47:04 2017 J. Agramunt40Mg Run 008 Date: 30/03/2017

Start: 08:41
  
  219   Wed Mar 29 22:53:58 2017 J. Agramunt40Mg Run007
 Date: 30/03/2017
  
  218   Wed Mar 29 21:34:20 2017 RCF40Mg Run 006
 Date: 30/03/2017
  
  217   Wed Mar 29 20:27:53 2017 RCF40Mg Run005
 Date: 30/03/2017
  
  216   Wed Mar 29 19:31:21 2017 RCF40Mg Run 004
 Date: 30/03/2017
  
  215   Wed Mar 29 18:42:25 2017 RCF40Mg Run 003
 Date: 30/03/2017
 201703300252-SyncScreenshot.png201703300307-SyncScreenshot.png 
  214   Wed Mar 29 18:16:58 2017 RCF40Mg Run 002
Date: 30/03/2017
 201703300234-SyncScreenshot.png 
  213   Wed Mar 29 17:15:21 2017 JLTNew Config fileNew configuration file:
170330_Conf_BrikenFull.xlsx
  
  212   Wed Mar 29 15:16:17 2017 Many40Mg Run 001Date: 29/03/2017

Start: 23:13
  
  211   Wed Mar 29 14:14:58 2017 Many40Mg RUN 000Date: 29/03/2017

Start: 22:13
  
  210   Wed Mar 29 13:31:37 2017 J Agramunt, R. Caballero, T. Davinson, C. Griffin, O. Hall, D. Kahl, G. Kiss, J. Liu, S. Nishimura, V. Phong, JL TainStart of parasiticStart of parasitic Ca beam
(main experiment "New isotope search", Ahn
et al.)
 170329_Conf_BrikenFull.xlsx 
  209   Wed Mar 29 11:02:40 2017 PV, Liu, JA, JLTF11 plasticNew calibration of F11 plastic

We decided to have both a low gain and a
  
  208   Wed Mar 29 07:34:16 2017 J. AgramuntBrikenTools repository installed at d05The last version of Briken tools repository
has ben installed at d05, this repository
includes the Merger and the BrikenOffline
  
  207   Wed Mar 29 03:02:02 2017 J. AgramuntSynchronization test procedure (update) To Launch the processes:

Open 4 terminals:
  
  206   Tue Mar 28 17:02:19 2017 DKApplying BiasesToday, Gabor and I discussed with Nathan from
ORNL about the biasing system used for Ge,
3He, Plastic, and others.  Phong is also
  
  205   Tue Mar 28 09:10:09 2017 Many152Eu152Eu source inside BRIKEN for CLOVER calibration.
Also calibration of Si-dE with 60Co source
and AIDA_PL calibration  with 60Co source.
 170328_1707_152Eu_CloverCal.root170328_1707_CloverCalibration.ods 
  204   Tue Mar 28 06:56:15 2017 PV, Liu, JA, JLTF11 PlasticCalibration of new F11 plastic
(see photo)
 170328_1507_F11_PL_RandL.pdf170328_1838_F11PLCal.pdfNewF11Plastic.jpg 
  203   Mon Mar 27 11:53:15 2017 PV,LiuTurn on dE detectorWe applied a bias voltage of 100 V to the
dE detector

Current read = 0.660 uA
 1_top_60co.png2_top_noiselvl.png3_bottom_60co.png4_bottom_noiselvl.png 
  202   Mon Mar 27 09:32:55 2017 JLT JA CG OH DK TD RC VP GK LJ SN252Cf252Cf at the center for BRIKEN calibration

 170327_1800_252Cf.pdf170327_1800_252Cf.root170327_1800_252Cf_Cal.ods 
  201   Mon Mar 27 03:50:13 2017 JLT JA CG OH DK TD RC VP SNBackgroundBackground measurement while they play with
the beam.
 170327_1640_Background.pdf 
  200   Sat Mar 25 13:42:23 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. CaballeroBackgroundBRIKEN system powered and DACQ started after
movement.
All looks fine.
 170325_2224_Background.pdf 
  199   Sat Mar 25 13:33:12 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. CaballeroBRIKEN+AIDA relocatedWe moved AIDA+BRIKEN by 107cm upstream.
See attached photos.
 NewLocation1.jpgNewLocation2.jpg 
  198   Fri Mar 24 03:28:39 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. NishimuraBackgroundBackground measurement overnight

Start: 19:45
 170324_1040_BackgroundOvernight.pdf 
  197   Thu Mar 23 10:03:51 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura252Cf252Cf source at the center for calibration

23/03/2017
 170323_1902_1938_252Cf.pdf 
  195   Thu Mar 23 09:30:58 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. NishimuraPower-up and 1st spectrumCrates powered up.
DACQ started.
New directory: /data/1703Preparation/
 170323_1841Background.pdf 
  194   Thu Mar 23 09:04:38 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. NishimuraRemove EURICA railsWe remove partially the floor rails of EURICA

to proof that it is possible to move BRIKEN
 Donwstream-EURICA-Rail.jpgUpstream-EURICA-Rail.jpgGeneralView.jpg 
  193   Thu Mar 23 09:01:33 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. NishimuraELOG Start PreparationWe started the preparation of 2017 campaign   
  192   Fri Dec 9 05:25:26 2016 PVPhoto and schematic drawing of the Pb shielding in front of BRIKEN during Fallon experimentThis Pb shielding structure is right behind
the variable degrader
 Schematic_PbShielding_FallonRun.pdfIMG_1414.JPG 
  191   Thu Dec 8 04:17:49 2016 PVInstalling BRIKEN ELOG 2016 in RIBF local network to a personal computerAll the RIBF123 elog website (including
Takechi and Fallon experiment) can be
downloaded and installed from the following
 Screenshot_from_2016-12-08_13-30-16.png 
  190   Tue Nov 29 00:30:42 2016 PV,SNSillicon dE bias voltage increasedWe increase the bias voltage of the dE
detector from 20 V to 100 V

Leakage current:
  
  189   Mon Nov 28 16:18:07 2016 AEDAQ synchronization Please see: https://elog.ph.ed.ac.uk/AIDA/493   
  188   Mon Nov 28 10:48:21 2016 JLTOnline analysisComparison of current spectra with spectra
from Takechi's run
 analysis-271116.pdf 
  187   Mon Nov 28 05:59:28 2016 briken run
=======    START    =======
Date 2016/11/28
Start
time : 11:12
BRIKEN run : 056
Daq Conf.
File : 161128Conf_BrikenFull.xlsx
DLT File
  
  186   Mon Nov 28 01:22:50 2016 BRIKEN collaborationElog RIBF123 & BigRIPSFull RIB123 Elog entries for Takechi && Fallon
parasitic experiments
Update:03Dec16
 6x 
  185   Sun Nov 27 23:14:49 2016 BRIKEN collrun 036=======    START    =======
Date 2016/11/27
Start time : 19:28
  
  184   Sun Nov 27 11:23:54 2016 PV, GK, AE, TD 40Mg. Run 35 =======    START    =======
Date 2016/11/27
Start time : 18:59
  
  183   Sun Nov 27 11:15:42 2016 PV, GK, AE, TD 40Mg. Run 34=======    START    =======
Date 2016/11/27
Start time : 17:29
  
  182   Sun Nov 27 11:07:02 2016 PV, GK, AE, TD40Mg. Run 33 - junk=======    START    =======
Date 2016/11/27
Start time : 17:17
  
  181   Sun Nov 27 10:47:20 2016 PV,TD,GK40Mg. Run 32=======    START    =======
Date 2016/11/27
Start time : 16:20
  
  180   Sun Nov 27 07:10:29 2016 BRIKEN colaborationRun 31=======    START    =======
Date 2016/11/27
Start time : 13:53
  
  179   Sun Nov 27 04:38:15 2016 BRIKEN collaborationRun 030=======    START    =======
Date 2016/11/27
Start time : 10:41
  
  178   Sun Nov 27 04:36:16 2016 BRIKEN collaborationRun 020-023=======    START    =======
Date 2016/11/26
Start time : 20:05
  
  177   Sat Nov 26 20:50:13 2016 GK, AT&ATrun 16-19=======    START    =======
Date 2016/11/26
Start time : 17:21
 161126_1823_016_019_Rates.png161126_1823_016_019_Rings.png 
  176   Sat Nov 26 20:48:16 2016 BRIKEN collaborationrun=====   Start of measurements 41Al  ======   
  175   Sat Nov 26 16:54:17 2016 AT & ATCloversCalibration of clovers   
  174   Sat Nov 26 16:21:08 2016 Briken collaboration41Al run 2-1513:08 Beam is still OFF. Background acquisition
is started.
Degrader:
  
  173   Sat Nov 26 09:31:05 2016 Gabor Kiss, Ariel Tarifeno, Alvaro TolosaOutput signals from G7RedPreamplifier of crystal G7Red was replaced.

Output signals from G7Red are weird.
 G7red_01.svg02.svg03.svg06.svg 
  172   Sat Nov 26 06:37:37 2016 AT41Al run 111:07  New acquisition is started for tungsten
degraders 
1mm W + 1mm Al
  
  171   Sat Nov 26 06:30:30 2016 ATSetupSetup for parasitic experiments

Energy 41Al @ F11 is around 145MeV/u
  
  170   Sat Nov 26 00:15:12 2016 AT41Al run008:15    BigRips tunning for centering 41Al.
Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
 161126_0815_000_RateBRIKEN.svg 
  169   Sat Nov 26 00:04:15 2016 ATElogRIKEN Elog during Fallon Parasitic experiments

Fallon Group: 
  
  168   Fri Nov 25 23:18:04 2016 BRIKEN collaborationFallon Parasitic experiments=====   START OF PARASITIC EXPERIMENTS  ======   
  167   Fri Nov 25 21:50:42 2016 ATNew Conf File161125Conf_BrikenFull.xlsx   
  166   Fri Nov 25 21:49:36 2016 ATBackground Beam OFF21:27  Beam off. Background is started.

22:10  Acquisition is stopped. Files:
  
  165   Fri Nov 25 21:48:49 2016 ATDACQ19:00  Test calibration    
  164   Fri Nov 25 21:47:05 2016 ATBackground Beam OFF16:17  Background beam OFF

16:27 Beam On. Acquisition stopped just after
 161125_1617_017_BRIKEN.svg161125_1617_017_RateBRIKEN.svg 
  163   Fri Nov 25 03:49:44 2016 ATBackground Beam ON16/11/25 12h28min: Background measurement
beam ON 19B
  
  162   Fri Nov 25 03:41:40 2016 ATRun setupsRun setups during preparation of Fallon Parasitic
experiments (Kanungo experiment beam time)
can be found on 
 RUNsum_kanagoda.pdf 
  161   Fri Nov 25 03:37:23 2016 ATBackground Beam OFF/ON16/11/24 21h06min: Background measurement
Beam OFF + Beam ON tunning and 22C
 161124_2106_013_BRIKEN.svg161124_2106_013_Rings.svg161124_2106_013_RateBRIKEN.svg 
  160   Fri Nov 25 03:15:46 2016 AT Background Beam ON16/11/24 19h38min:  
Background measurement during tunning of
BigRips from 27-29F to 22C is started.
  
  159   Thu Nov 24 14:57:55 2016 ATBackground Beam ONStarting from today 12:22, the background
generated by the different setups on BigRips
is monitorized.
 161124_1222_010_BRIKEN.svg161124_1222_010_RateBRIKEN.svg 
  158   Thu Nov 24 14:36:27 2016 AT252CfCheck of calibrations and rates for neutron
detectors with Conf File 161107Conf_BrikenFull.xlsx
 CalibrationCheck_161122.xlsx 
  157   Thu Nov 24 02:30:56 2016 CGRIBF123R1 Local ELogsPDFs of the local ELog for the RIBF123R1
experiment Nov 2016
 9x 
  156   Tue Nov 22 10:22:07 2016 PV, LiuNo current observed when turning on the HV for the D4 Clover19:00
We've turned on the High Voltage for the
D4 Clover up to ~ 1.5 kV. 
  
  155   Tue Nov 22 10:17:57 2016 ATS, PV, LIU252CfMeasurement with 252Cf at Z=22.5cm from the
moderator border, opposite side from AIDA.
Clovers and Veto detectors are turned off.
 161122_2208_003_BRIKEN.svg 
  154   Tue Nov 22 09:26:04 2016 A. Tarifeno-SaldiviaNoise checkRun for checking the noise just after turn
on the crates, without high voltages on the
PREAMPS.
 161122_1820_000_BRIKEN.svg 
  153   Tue Nov 22 08:28:36 2016 A. Tarifeno-Saldivia et alNew directory and Config FileA new directory in the IFICdaq computer has
been created for the parasitic measurements
during the Fallon Beam Time.
  
  152   Sun Nov 20 13:02:06 2016 Jorge, Alavaro, JoseDACQGasific-7.0 Short Manual (Preliminary)  Gasific70Manual.pdf 
  151   Sun Nov 20 12:28:27 2016 Jorge, Alvaro, JoseDACQUpdated run protocol  GasificShort.pdf 
  150   Fri Nov 11 08:07:18 2016 BCR SG NTBBRIKEN Hit VisualizationThese are the files used to create and
visualize the hit patterns of the BRIKEN
detector.
 HybridBRIKENPhysicalHistogram.cppHybridBRIKENPhysicalHistogram.hppHybridBRIKEN_Tube_Info_1.txt 
  Draft   Thu Nov 10 05:05:54 2016 KMHow to convert ridf-file to root-file1. Login to briken@ribfana03.riken.jp

2. Check if the ridf-file you want
to convert is in the directory; /home/briken16/rawdata/bigrips/
  
  148   Wed Nov 9 02:02:22 2016 IrisBoron rubber from IndiaThe boron rubber from India is BR-2871, price
US-$ 2700 for 2pc 1m x 2m x 3.3mm.
52% B content, density 1.61 g/cm3
 BPE2_Clr.jpgquotation_220213.pdfflex_boron_2871.pdf 
  Draft   Wed Nov 9 01:04:35 2016 IrisDrawing of present setupThis is the setup which was used for the Ni
runs (from Nov. 8th evening on).
 Setup-161109-Takechi.pdf 
  146   Wed Nov 9 01:02:53 2016 IrisElogFrom Nov. 9th on we use the Takechi ELOG for
the run information:
http://ribf-exp.riken.jp/elog/RIBF123/ 
  
  145   Tue Nov 8 17:00:27 2016 NTB, CG, ATSi Delta EAt least during the timeframe in between
~ 21:30 (11/08) - 23:30 (11/09) (161108_2323_717273Ni.root)
we see that the silicon dE have a very low
  
  144   Tue Nov 8 15:10:24 2016 Many717273Ni RunF7 OUT F11 C-6mm

Start: 00:09
  
  143   Tue Nov 8 14:28:54 2016 Many717273Ni runF7 CH2 F11 C-6mm
Total degrader thickness 6mm
  
  142   Tue Nov 8 13:49:58 2016 Many71,72,73NiF7 CH2 F11 Empty

We remove the 8mm Al plate from inside BRIKEN
  
  141   Tue Nov 8 12:51:08 2016 Many717273Ni After removing the lead wall.

Start: 21:45
  
  140   Tue Nov 8 12:30:33 2016 Tain, Ale (who are not on shift)71,72,73Ni run71,72,73Ni  run

We started at approximately 21:00, only online,
  
  139   Tue Nov 8 11:51:28 2016 Alespikes on some spectraSome spectra show spikes or do not look normal.
This should be checked.
  
  138   Tue Nov 8 08:49:51 2016 Tain et alMove ELOGWe will start to use the internal RIKEN ELOG
It is not clear that we can keep the present
ELOG also updated
  
  137   Tue Nov 8 08:31:52 2016 Tain et al424344Ca runSequence of settings:
1) No target at F7 and Empty target at F11
(up to t=1E6ms)
  
  136   Tue Nov 8 06:39:25 2016 Tain. IrisDrawing of present setup

Attached is the present setup including all
 Full_BRIKEN_Setup-includingTakechi.pdf 
  135   Tue Nov 8 06:13:11 2016 Tain et alNew plastic detector in F11There is a new plastic scintillator
after the MUSIC chambers
 PlasticsBehinMUSIC1.jpgPlasticsBehindMUSIC2.jpg 
  134   Tue Nov 8 02:49:19 2016 PV, LiuSpecification of the dE silicon detectorThe specification and picture of the dE silicon
detector is shown in the attached photos.
The detector  has an effective area of 134
 spec_de_1.jpgspec_de_2.jpgIMG_1340.JPG 
  133   Mon Nov 7 14:17:23 2016 BRIKEN collaborationPicture of shift schedule   IMG_20161107_183105.jpg 
  131   Mon Nov 7 13:44:26 2016 Alvaro, Ale, Jorge, JoseRunning Gasific and run protocolPreliminary  GasificShort.pdf 
  130   Mon Nov 7 13:15:07 2016 Alvaro, Ale, Jorge, JoseBackgroundBackground measurement overnight.

Start: 23:27 (07/11/2016)
 161108_0751_Overnight_BRIKEN.pdf 
  129   Mon Nov 7 13:11:42 2016 Alvaro, Ale, Jose, JorgeNew directory and Config fileFor second part of Takechi's run:

Directory: /data/1611Commissioning/161107Parasitic
 161107Conf_BrikenFull.xlsx 
  128   Mon Nov 7 09:05:09 2016 IrisDraft for Run sheetAttached is the draft for the paper run sheet
(version 2). If something is missing, please
let me know.
 Run_sheet-Nov16-v2.pdfRun_sheet-Nov16-v2.docx 
  127   Mon Nov 7 09:04:10 2016 Phong,Liu,Ale,JoseNew AIDA plastic calibrationTo have a range of about 200 MeV

Ortec671 Gain from x20 to x5 (fine gain :
 161107_1800_AIDAplasticCalib.pdf 
  126   Mon Nov 7 06:55:01 2016 NTB, SGHPGe Fill line to D4 replacedHPGe fill line to D4 replaced only small
leak (overflow) once Ge is full.

Solenoid was also wrapped to no
  
  125   Mon Nov 7 05:36:20 2016 Alenew calibration for F11new calibration for F11

Using a value of 70 MeV energy loss and the
  
  124   Mon Nov 7 04:49:57 2016 Tain, AleAIDA plastic (veto) and Si de calibrationAIDA plastic (veto) and Si de calibration

For the calibration the Compton edge of the
  
  123   Mon Nov 7 04:37:33 2016 Phong,Liu,...Si de and AIDA plastic calibration60Co source placed close to the detectors:

ROOT files: 
  
  122   Mon Nov 7 02:39:55 2016 AlePhoto of the white board with the details on the cards and preamps at B1FPhoto of the white board with the details
on the cards and preamps at B1F
 New_Doc_160_2.pdf 
  121   Sun Nov 6 23:35:42 2016 Tain et al.Overnight measurement: Ca isotopesFirst 50,49,48Ca beam and then 47,46,45Ca
beam
C-6mm IN and OUT
 161107_0833_Overnight_Rates.pdf161107_0833_Overnight_F11.pdf161107_0833_Overnight_CorrBRF11R.pdf 
  120   Sun Nov 6 07:16:59 2016 Tain et al.58Ni on F7 CH2 F11 empty/C6mmCH2 target at F7 in
Start with Empty at F11
Change to C-6mm at F11 later
 161106_1725_58Ni_F7CH2_Rates.pdf161106_1725_58Ni_F7CH2_RatesRings.pdf 
  119   Sun Nov 6 06:39:23 2016 Tain et al.58Ni on F11 C-6mm58Ni in F11 C-6mm (later empty)
F7 CH2 target out (F5 CH2 target in)
Thresholds in V_PL_* lowered from 20MeV to
 161106_1609_58Ni_F11_empty_Rates.pdf 
  118   Sun Nov 6 06:27:49 2016 Tain et al.58Ni on F11 C-6mm inNew calibration in V_PL_T and V_PL_R (Energyx1/2)

Start: 15:15
  
  117   Sun Nov 6 03:12:55 2016 Alvaro,JorgeOvernight measurementMeasurement during beam production
and measurement with F7 CH2 out, 
F11 C-tar in/out, F7 CH2 in C-target out/in
  
  116   Sat Nov 5 17:07:27 2016 Tain, Alvaro, Jorge62Ni in F762Ni beam in F7 ON CH2 target

Strat with C target ladder in F11 in empty
 161106_0232_62Ni_F7_empty_Rates.pdf161106_0232_62Ni_F7_empty_F11.pdf161106_0232_62Ni_F7_empty_CorrBRF11R.pdf161106_0232_62Ni_F7_empty_VPL.pdf161106_0232_62Ni_F7_empty_CorrBRVPL.pdf 
  115   Sat Nov 5 16:27:13 2016 Tain,Ale,Jorge,Alvaro62Ni beam in F11 empty targetEmpty position of the target ladder at F11
(hole is smaller than beam size)
  
  114   Sat Nov 5 15:07:11 2016 Tain, Ale62Ni beam on F11 C-6mm62Ni on 6 mm C target between MUSICs

The background before was 0.36 neutrons/s
 161106_0117_62Ni_F11_C6mm_Rates.pdf161106_0117_62Ni_F11_C6mm_F11.pdf161106_0117_62Ni_F11_C6mm_CorrBRF11R.pdf161106_0117_62Ni_F11_C6mm_VPL.pdf161106_0117_62Ni_F11_C6mm_CorrBRVPL.pdf 
  113   Sat Nov 5 03:36:34 2016 Tain et alAncillary detectorsSome info on ancillary detector signals

Plastic veto detectors (Top and Botomm):
 VetoBottomPlastic.JPGVetoTopPlastic.JPGAIDAPlasticShaped.JPG 
  112   Sat Nov 5 03:18:13 2016 SG BCR RCF NTBGamma peaks in the overnight run, related to neutron inelastic scatteringWe looked at the overnight background run
(161105_0935_BackgroundOvernight.root), There
are gamma-peaks that could be related
 08.png06.png 
  111   Sat Nov 5 01:26:46 2016 Jose,Iris,Alvaro, Alejandro, KrzysztofBackground measurementMeasurement overnight

Start: around 1:00
 7x 
  110   Sat Nov 5 01:25:24 2016 Tain et alEnd of Beam Line SetupSome photos of the elements in the last part
of the beam line
during Takechi run.
 9x 
  109   Fri Nov 4 13:16:42 2016 JLTain,ATolosa,JAgramuntNeutron BackgroundBeam tuning in BigRIPS

At 19:00 access to Exp. Area was closed and
 Screenshot_from_2016-11-04_22-26-10.pngScreenshot_from_2016-11-04_22-35-46.pngScreenshot_from_2016-11-04_22-35-29.pngScreenshot_from_2016-11-04_22-43-32.png 
  108   Fri Nov 4 03:37:27 2016 Roger CaballeroEnergy calibration for Ge cloversEnergy Calibration: See attached pdf

Detector Slope Offset
 20161104-HpGe-EnergyCal.pdf 
  107   Thu Nov 3 23:28:01 2016 A. TolosaBRIKEN Bkg + 152EuMeasurement over night with a 152Eu source
inside
 161104_0826_152Eu.png161104_0826_152Eu_CLOVERS.png 
  106   Thu Nov 3 15:09:52 2016 A. Tarifeno-Saldivia, C. Domingo-Pardo, J.L. TainBRIKEN neutron efficiencyGeant4 BRIKEN Neutron efficiency calculations
as a function of neutron energy and for some
spectra: Ga84-vandle, Br88-endf71, Rb94-endf71,
 BRIKEN_hybrid140.svgEfficiency_vs_Energy_HybridConf_140b.svgBRIKEN_hybrid140_efficiency.xlsx 
  105   Thu Nov 3 14:02:49 2016 Nepal, J Ha, PV, Liu JThe degrader system has been setWe used the laser to align the degrader
(see attached photos)

According to the LISE calculation,
 IMG_1318.JPGIMG_1317.JPG 
  104   Thu Nov 3 05:46:48 2016 Iris, AleBackground measurementBackground measurement for threshold determination

  
  103   Thu Nov 3 05:27:48 2016 Alvaro, Tain, Gabor, Ale152Eu Energy calibration for clovers, 152Eu

 161103_1426_152Eu.root 
  102   Thu Nov 3 04:46:24 2016 Alvaro Tolosa252CfCheck of BRIKEN calibration and thresholds

Source more or less at the center
 161103_1319_252Cf.root 
  101   Thu Nov 3 04:40:02 2016 AllSTARTStart of commissioning preparation

 161103Conf_BrikenFull.xlsx 
  100   Wed Nov 2 02:26:22 2016 Roger CaballeroEfficiency callibration calculator (Excel file)Attached the updated excel file. In the first
sheet there is the calculator to calculate
the efficiency from an given energy.
 cloversEff.xls 
  99   Wed Nov 2 01:19:46 2016 Roger CaballeroEff callibration parameters for D4-CloverEfficiency calibration for the D4 clover (data
acquired in October).
The attached plots show the parameters for
 D4-Black.pdfD4-Red.pdfD4-Green.pdfD4-Blue.pdf 
  97   Tue Nov 1 13:00:55 2016 Roger CaballeroEff callibration parameters for G7-CloverEfficiency calibration for the G7 clover (data
acquired in July).
The attached plots show the parameters for
 G7-Blue.pdfG7-Green.pdfG7-Red.pdfG7-Black.pdf 
  96   Tue Nov 1 09:27:02 2016 Alvaro TolosaCLOVEREfficiency calibration

File "cloversEff.ods" and "cloversEff.xls"
 cloversEff.xlscloversEff.ods 
  95   Mon Oct 31 23:56:37 2016 J. AgramuntFirst AIDA BRIKEN correlation plotFrom the 252Cf data.  FirstAIDA_BRIKENPlot.pdf 
  94   Tue Oct 18 09:41:43 2016 Alvaro Tolosa2016 - July, LogbookPaper logbook for July-2016
For correct visualization, 
please download it.
 16Jul_logbook.pdf 
  93   Tue Oct 18 09:36:07 2016 Alvaro Tolosa2016-Oct, LogbookPaper logbook for October-2016
For correct visualization, 
please download it.
 16Oct_logbook.pdf 
  92   Mon Oct 17 05:21:46 2016 Phong, Liu J JdE detector position and output signal from preamplifierdE detector is mounted onto the back side
of the shielding (attached photo: dE_position.JPG)
 137CsTest_ac.JPGdE_position.JPGdc.JPG 
  91   Sun Oct 16 13:30:43 2016 AllEND... and sashimi (see photo)

The detectors (BRIKEN tubes, CLOVER, VETO
 Sashimi.jpg 
  90   Sun Oct 16 12:58:34 2016 AllBRIKENInstallation of BRIKEN PE shielding for beam
related neutrons
 Shielding-BRIKEN-AIDA.jpgShielding-BRIKEN.jpgShieldingPlates.jpg 
  89   Fri Oct 14 14:06:38 2016 AllFirst measurement of BRIKEN and AIDAFriday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common
clock.
 161014Conf_BrikenFull.xlsx 
  88   Fri Oct 14 13:32:52 2016 NT BREWER, S Go, JM AllmondGe preamp power loss and solution. As previously recorded (81), on Thur Oct
13th, A NIM crate failure caused preamp power
loss to the HPGe's. While D4 recovered
  
  87   Fri Oct 14 04:42:40 2016 JL Tain et alElectronicsChange of main power line for MPOD and CLOVER
preamp
 D4All-CsCo-zoom-newlineCL.pdfBRIKEN-newlineCL.pdf 
  86   Fri Oct 14 04:12:50 2016 JL Tain et alCONFNew configuration file: 
161014Conf_BrikenFull.xlsx
  
  85   Thu Oct 13 23:42:27 2016 JL Tain et alBackgroundBackground measurement overnight

Start: 01:17
 Bckg-161014.pdf 
  84   Thu Oct 13 23:41:25 2016 JL Tain et al252CfNew BRIKEN energy calibration

 252Cf-161014.pdf 
  83   Thu Oct 13 23:39:58 2016 JL Tain et alVETO DetEnergy calibration of plastic and NaI detectors

 Plast-Cs.pdfNaI-Cs.pdfPlast-Co.pdfNaI-Co.pdfVETO-testarrangement.jpg 
  82   Thu Oct 13 23:38:26 2016 JL Tain et alCLOVEREnergy and efficiency calibration

We make calibrations for the remaining D4
 D4All-CsCo.pdfD4All-CsCo-zoom.pdfD4Sum-152Eu.pdf 
  81   Thu Oct 13 12:58:31 2016 JL Tain et alINCIDENTNIM Crate Failure. Lost of CLOVER G7

One of the 2 NIM crates, the one containing
  
  80   Thu Oct 13 04:36:58 2016 JL Tain et alCLOVERCLOVER energy calibration

Short run with 137Cs and 60Co sources at
 161013_1518_137Cs60Co.root 
  79   Wed Oct 12 11:30:53 2016 Ariel Tarifeno, Alvaro Toloza, JL Tain, J. Agramunt, et alBRIKEN Z scanScanning of the BRIKEN detector with the 252Cf
source 
along the longitudinal axis (Z axis)
  
  78   Wed Oct 12 05:06:57 2016 JL Tain et alNoiseGamma source close to ORNL2 tube

In order to investigate the origin of the
 He136-nosource.pdfHe136-137Cs.pdf 
  77   Wed Oct 12 03:47:14 2016 JL Tain et alBackgroundBackground measurement over night with CLOVER
and VETO detectors
  
  76   Tue Oct 11 17:11:28 2016 A. Tarifeno-Saldivia et al...ROOT macro ROOT macro for calculation of neutron rates
in the BRIKEN detector
 BRIKEN_rates_v3.cc 
  75   Tue Oct 11 15:58:01 2016 JL Tain et alVETO DetCheck of Plastic and NaI veto detectors and
DACQ settings
 IMG_20161012_124010.jpgPlastic-137Cs.pdfNaI-137Cs.pdf 
  74   Tue Oct 11 15:47:45 2016 N Brewer, S Go et alCLOVERBoth COVER detectors are installed in place.
See photos.
 IMG_20161011_182318.jpgIMG_20161011_182258.jpgD4-1st.pdfG7-1st.pdf 
  73   Sun Oct 9 18:19:01 2016 JL Tain et alNoiseOptimization of ADC thresholds

In order to try to reduce the grass-like
 161007_1045_bck_lin.pdf161010_0712_bck_newthr.pdf 
  72   Sun Oct 9 15:49:41 2016 JL Tain et alPower shutdownDue to maintenance operations of the Wako
electrical
company there is a risk of power shutdowns
  
  71   Sun Oct 9 04:20:47 2016 JL Tain et alNoiseWe check for the appearance of spurious signals
in the preamplifiers.
 noHV.pdf161008_0642_noHV.pdf 
  70   Sat Oct 8 01:18:51 2016 JL Tain et alDACQWe increased the pretrigger delay for ADC5
from 350 to 400
  
  68   Fri Oct 7 10:42:52 2016 JL Tain et alNoiseWe investigate the effect on the noise in
ORNL tubes of using a differential PA.
 ORNL-DiffPreamp.pdf 
  67   Fri Oct 7 08:35:15 2016 JL Tain et alNoiseLow amplitude noise component.

The figure shows the composition of the low
 noiseDifferentTubes2.pdf 
  66   Fri Oct 7 08:09:47 2016 JLTain et alBackgroundBackground measurement overnight
Start: Oct-6 2242 Stop: Oct-7 10:45
 Bckg-1st.pdf161007_1045_bck.pdf 
  65   Thu Oct 6 14:50:30 2016 JL Tain, A Tolosa, A Tarifeno,...252CfFirst measurement with 252Cf source to check
the calibration.
AIDA was in place so the source was at the
 252Cf-1st.pdf161006_2235_252Cf.pdf 
  64   Thu Oct 6 14:43:47 2016 JL Tain, A Tarifeno, A Tolosa, J Agramunt, N Brewer, S Go, ...ElectronicsWe mount back all preamplifiers
Initially we used all the PA coming from
US, the repaired and the new ones.
  
  63   Thu Oct 6 02:03:32 2016 JL TainSTARTWe started the assembly of BRIKEN and AIDA
detectors in their final position
on Tuesday October 4:
 6x 
  62   Thu Aug 18 23:32:59 2016 NT BrewerNew preamps arrived at Oak Ridge and tested working.Collaborators,

Attached is a phone photo of example
signals from the new preamps with 3 3He tubes
 IMG_20160818_145801.jpgIMG_20160803_160430.jpg 
  Draft   Thu Aug 18 22:39:35 2016 NT BrewerNew preamps arrived at Oak Ridge and tested working.Collaborators,

Attached is a phone photo of example
signals from the new preamps with 3 3He tubes
 IMG_20160818_145801.jpg 
  60   Fri Jul 29 09:52:28 2016 Keishi Matsuiaccuracy of Cf-252's intensity in RIKEN According to the reply from Japan
Radioisotope Association, the accuracy of
the Cf-252's intensity is +0%/-15%.
 IMG_9350.JPG 
  59   Fri Jul 22 12:50:29 2016 J.L. TainEND20/JUL/2016 20:00 
End of the test measurements
  
  58   Wed Jul 20 17:21:59 2016 J. Agramunt, A. TolosaDACQDACQ configuration parameters

The last configuration file used was: 160718Conf_BrikenFull_cal5.xlsx
 160718Conf_BrikenFull_cal5.xlsx 
  57   Wed Jul 20 17:18:59 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, K. Gabor, S. Go, K. Matsui...ElectronicsMeasurement with preamplifiers after drying.

Amplifiers are brought back after ~12h and
 Bkg-afterPAdrying.pngV2A4C3-SpuriousSignal.png 
  56   Wed Jul 20 17:05:59 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, ...BackgroundBackground measurement with remaining tubes
(95) overnight
 Bkg-with95tubes.png 
  55   Wed Jul 20 16:55:48 2016 K.Gabor, K. Matsui, A. TarifeņoElectronicDrying of preamplifiers

PA8, PA9 and PA10 are removed and brought
  
  54   Wed Jul 20 16:50:12 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, S. Go...252CfMeasurement of the 252Cf source at the central
position
  
  53   Wed Jul 20 16:40:57 2016 S. Go, J.Agramunt, A.Tolosa, J.L. Tain,...CLOVERCalibration and resolution check

CLOVER detectors were calibrated in energy
 152Eu.png 
  52   Wed Jul 20 16:12:58 2016 S. Go, ...CLOVERMounting of the CLOVER detectors in position

CLOVER G7: right of beam
 DSC_2522.JPGDSC_2523.JPGDSC_2524.JPG 
  51   Wed Jul 20 16:07:58 2016 A.Tarifeņo, J.L. Tain, J. Agramunt, A. Tolosa, ...252Cf19/Jul/2016
Scanning of the efficiency as a function
of longitudinal position
  
  50   Wed Jul 20 12:00:15 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, ...252CfMeasurement with the source at the center

Listmode: 160719_BRIKEN_252Cf_009.dlt
  
  49   Wed Jul 20 11:49:00 2016 J.L. Tain, J. Agramunt, R. Baeturia, A. Tarifeņo, A. Tolosa, ...Background18/07/2016 
First background measurement overnight.
 160718_FullBrikenFirstData_bkg.zip 
  48   Wed Jul 20 11:40:00 2016 J.L. Tain, J. Agramunt, R. Baeturia, A. Tarifeņo, A. Tolosa, ...252CfFirst measurement with full 140 tube version

of the BRIKEN neutron detector
 RIKEN-252Cf-V1A1.pngUPC-252Cf-V1A3.pngORNL1-252Cf-V1A5.pngORNL2-252Cf-V1A6.png 
  47   Wed Jul 20 11:16:18 2016 J.L. TainElectronicsPulser settings

We use two pulsers, Pulser1 for RIKEN, ORNL1
  
  46   Wed Jul 20 08:58:13 2016 J.L. Tain, I.Dillman, R. Caballero, J. Agramunt, A. Tarifeņo, A. Tolosa, ...ElectronicsDistribution of connections of tubes in preamplifiers
and digitizers
 TubeDistribution-new.xlsxTubeDistribution-new.pdf 
  45   Tue Jul 19 13:47:55 2016 A. Tarifeņo-SaldiviaNeutron efficiency - Scanning on Z preliminary result We have carried out a scanning of
the neutron efficiency with respect to the
position along the Z-axis (AIDA and BEAM
 Preliminar_Zscaning_BRIKEN_PremLabel_vsmall.png 
  44   Tue Jul 19 11:54:03 2016 JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt Photos of the AIDA insertion hole with the 3He tubesRIKEN tubes on the AIDA side with the SHV
right angle connector will protrude
by ~95mm in the HYBRID configuration (with
 DSC_2520.JPGDSC_2517.JPGDSC_2515.JPG 
  43   Tue Jul 19 04:34:57 2016 JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt Photos of the electronicsRacks, crates, rear part of the preamps and
matrix with all tubes.
 9x 
  42   Tue Jul 19 04:09:32 2016 JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt Last tube fit in the matrix!!!The photo of great moment  DSC_2478.JPG 
  41   Tue Jul 19 03:19:34 2016 A. Tarifeņo, I. Dillman, J. Agramunt, A. Tolosa, J.L. Tain...ElectronicsPreamplifier and signal cable testing

We check all signal cables,the flat cable
 preampCheck.zipnoTubeCh1.zip160717_preampCheck.root160717_preampCheck_noTubes.root 
  40   Mon Jul 18 19:01:36 2016 J.L. Tain3He tubesAdjustment of HV and PA gain

We adjust the HV for each tube type and the
  
  39   Mon Jul 18 18:40:32 2016 A. Tarifeņo-Saldivia and J. L. Tain3He tubes - TestingTest of individual 3He tubes

The tests were done using the ATOMKI MCA
 7x 
  38   Mon Jul 18 09:32:50 2016 Shintaro GoHV controlsYou can start applying HVs on the detectors
using macro on the control-computer.
If you have already signed in the
  
  37   Fri Jul 15 11:47:31 2016 Nathan Brewer and Alvaro TolosaPreliminary Ge Calibration, Resolution and ConfigurationToday several tests (3) were done with
the germanium detectors with the voltage
configuration listed in the previous entry.
 9x 
  36   Fri Jul 15 08:29:14 2016 Nathan Brewer, Shintaro GoExpected Performance and Voltage Setting for GermaniumExpected Resolution:
------------------------------
G7 should be ~2.0 keV FWHM at 600
  
  35   Sat Jul 9 21:26:25 2016 J.L. TainEDACQElectronics and DACQ for July 2016 assembly:
hardware and connections
 EDACQ-July2016.pdf 
  34   Sat Jul 9 21:21:38 2016 J.L. Tain3He tubesTube distribution in the moderator, pre-amplifiers
and digitizers
 TubeDistribution.pdfTubeDistribution.xlsx 
  33   Sat Jul 9 21:14:12 2016 J.L. Tain3He tubesDrawings and specs of 3He tubes  He3_GE_30cm-RIKEN.pdf1inch3He-ORNL.pdf2inch3He_ORNL.pdfHe3-252248-UPC-GSI.pdf 
  32   Sat Jul 9 21:08:08 2016 J.L. TainNeutron moderatorDrawings of the polyethylene neutron moderator
and table assembly
 Moderator-Table.pdfTable.pdfModerator-Shielding.pdf 
  31   Sat Jul 9 21:00:54 2016 J.L. TainHardwareA list of the available hardware  Hardware.xlsxHardware.pdf 
  30   Sat Jul 9 20:44:31 2016 J.L. TainBRIKEN neutron detectorSTART
Assembly and commissioning of BRIKEN neutron
detector 
  
  29   Mon May 11 09:14:54 2015 G. Kiss252Cf_data_sheetThe activity of the 252Cf source, used
for the calibration was 3.7 MBq at 15.05.2006.
Unfortunately, uncertainty is missing from
 252Cf_15_05_2006_3p7MBq.jpg 
  28   Fri May 8 03:20:48 2015 J.Agramunt J.L.Tain K.GaborBnCorrelationWe run all the night until the end of beam
time, and the Bn correlations are more clear
now.
 BnCorr.pdf 
  27   Thu May 7 08:36:56 2015 J.L. Tain, J. Agramunt, A. Estrade, G.Kiss, T. Davinson, C.GriffinFirst BRIKEN_v.0 beta-delayed neutron correlations?During the 98,100Kr setting run we observe

in the time correlation plot (middle right
 Screenshot_from_2015-05-07_16_01_27.png 
  26   Wed May 6 11:41:24 2015 J. Agramunt, A. EstradeFirst online combined analysisScreen shot of the rudimentary on-line
analysis of the combined data:
BRIKEN-AIDA-BigRIPS
 Screenshot_from_2015-05-06_19_12_29.png 
  25   Wed May 6 05:10:14 2015 J.L. Tain, J. Agramunt, G. Kiss94Se setting measurementAfter the long shutdown the beam is back at
00:30 (06/05)
Intensity is slightly lower 26pnA and somewhat
  
  24   Wed May 6 04:57:24 2015 J.L. Tain, J. Agramunt, G. KissNew degrader thicknessThe Al degrader thickness was reduced to 4.8mm   
  23   Tue May 5 05:29:26 2015 J.L. Tain, J. Agramunt, G. KissAmbient background measurementBeam still down. New background measurement
with new RIKEN tube below the MUSIC chamber
  
  22   Tue May 5 05:17:36 2015 J.L. Tain, J. Agramunt, G. KissAmbient background measurement

Failure of
a quadrupole triplet at BigRIPS (some time
after earthquake)

We take the chance of
  
  21   Tue May 5 05:04:00 2015 J.L. Tain, J. Agramunt, G. KissChange of degrader thicknessFor EURICA measurements degrader thickness
were increased
trying to decrease MACI and AIDA trigger
  
  20   Tue May 5 02:19:58 2015 j.Agramunt J.L.Tain K.Gabor The Lower polyethylene pieces was swampedThe Lower polyethylene pieces was swamped.
In the photo beam comes from the
left.
 photo-4.JPG 
  19   Mon May 4 15:03:47 2015 J.Agramunt J.L.Tain K.Gabor New detector placed under the beam line New detector placed under the beam
line, below MUSIC chamber
This detector replace the USA tubes
 photo_2-2.JPGphoto_1-2.JPGphoto_3-2.JPG 
  18   Mon May 4 04:14:18 2015 J.Agramunt J.L.Tain K.GaborAIDA trigger plugged in Mod2 Ch12AIDA trigger plugged in Mod2 Ch12   
  17   Mon May 4 03:20:00 2015 Shunji NishimuraRNC New RuleWe have some new rule about the data taken
at RNC from this year. 
Shunji
 kanri_e.pdf 
  16   Mon May 4 02:36:16 2015 J.Agramunt J.L.Tain K.GaborMaki trigger plugged in Mod2 Ch9    
  15   Mon May 4 02:26:14 2015 J.Agramunt J.L.Tain K.GaborF11 trigger plugged in Mod2 Ch16 of Briken daq    
  14   Sun May 3 10:10:13 2015 J.L. Tain, J. Agramunt, G. Kiss94Se setting measurement94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
  
  13   Sun May 3 10:07:25 2015 J.L. Tain, J. Agramunt, G. KissPhotos of new PE shieldingPhotos of the general arrangement and details
of the new PE blocks
 20150502_195020.jpg20150502_194340.jpg20150502_192253.jpg 
  12   Sun May 3 09:04:07 2015 J.L. Tain, J. Agramunt, G. KissSummary of neutron measurements
U: (Up: 2 RIKEN tubes at 40cm from AIDA)
D: (Down: 12 RIKEN tubes at 80cm from AIDA)
  
  11   Sat May 2 19:32:08 2015 AEtransfer data AIDA->BRIKENA test program for online data transfer is
available in aidas1 PC at:
  
  10   Sat May 2 03:52:14 2015 J.L. Tain3He tube description3He tube drawings and technical details: 
RIKEN, UPC, GSI, ORNL-1, ORNL-2
 He3_GE_30cm.pdfHe3-252248.pdf1inch3He.pdf2inch3He.pdf 
  9   Mon Apr 27 10:18:21 2015 K.Gabor S.Nishimura J.AgramuntORNL 3He tube at RIKEN   photo-3.JPG 
  8   Mon Apr 27 04:40:43 2015 G. Kiss, J. Agramuntneutron background at EuricaBased on an about 8h long background measurement,
the neutron background at the Eurica site
was found to be about 0.006 neutron / sec
  
  7   Sat Apr 25 08:25:42 2015 G. Kiss, J. AgramuntBRIKEN Test setupAltogether 16  tubes are mounted for
the parasitic detector test (see the attached
photos):
 P1120020.JPGP1120023.JPGJap1Cf.pdfUS1Cf.pdf 
  6   Wed Feb 25 07:38:42 2015 A. Estrade J. Agramunt Usage of synchronization test programsIn order to access to the synchronization
test, we prepare two programs in the PC 
briken1 ( 10.32.6.54).
 15.pngDataRelayFilter_terminal.png 
  5   Tue Feb 24 09:34:54 2015 J. Agramunt, H. Baba, A. Estrade[DAQ] DAQ correlation test
We have performed a successful test of the
integration of independent DAQ systems based
 DAQcorrelation_diagram.pdfDAQsoftware.pdfcorrelation_25Hz.pngcorrelation_random.png 
  4   Mon Feb 16 00:29:00 2015 Gabor KISSPolyethyeleneThe polyethelene arrived at RIKEN. Except
4 neighboring holes (located at the inner
ring) the alignment is OK.
 bottom1.JPGsmall2.JPG 
  3   Fri Oct 31 12:58:49 2014 Robert GrzywaczEntry test - preamps Here is a picture of one of our Mesytec preamplifiers.
We have  located all seven of them. 
They  have 16 input channels and a common
 24.png 
  2   Fri Oct 31 11:36:57 2014 Alfredo EstradeBRIKEN elog: take 2A elog for the setup of the
BRIKEN detector is now operational at 
  
  1   Fri Oct 31 09:47:59 2014 Alfredo EstradeBRIKEN elog: Hello world!A elog for the setup of the BRIKEN detector
is now operational at https://elog.ph.ed.ac.uk/BRIKEN/
 
We have setup
  
ELOG V3.1.4-unknown