AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 21 of 21  ELOG logo
ID Date Author Subjectdown Text Attachments
  103   Thu Nov 3 05:27:48 2016 Alvaro, Tain, Gabor, Ale152Eu Energy calibration for clovers, 152Eu

 161103_1426_152Eu.root 
  205   Tue Mar 28 09:10:09 2017 Many152Eu152Eu source inside BRIKEN for CLOVER calibration.
Also calibration of Si-dE with 60Co source
and AIDA_PL calibration  with 60Co source.
 170328_1707_152Eu_CloverCal.root170328_1707_CloverCalibration.ods 
  304   Fri May 26 02:17:40 2017 AT, AIM, JLT,AA, PV, KM152EuCalibration with 152Eu source.

START time:10:15
  
  345   Mon Oct 23 09:43:00 2017 RG, RY, MS, SG, AT137Cs YSOmeasurement of 137Cs with YSO 
after matching the gains of the 
HighGain channels
 171023_1655_137CsYSO.root171023_1655_1741_137CsYSO_070.rootScreenshot_from_2017-10-23_17-51-37.pngScreenshot_from_2017-10-23_17-54-53.png 
  405   Fri Nov 2 14:18:54 2018 JLT136Sn at ZDSMeasurement of neutron background while
Jungclaus experiment is running
Secondary beam 136Sn at ~140MeV/u, Be target,
  
  404   Fri Nov 2 01:07:21 2018 JLT134Sn/133In on ZDSMeasurement of neutron background while
Jungclaus experiment is running
Secondary beam: 
 Screenshot_from_2018-11-02_10-17-34.pngScreenshot_from_2018-11-02_10-20-20.pngScreenshot_from_2018-11-02_10-21-50.png 
  403   Wed Oct 31 03:41:33 2018 JLT134Sn at ZDSMeasurement of neutron background while
Jungclaus experiment is running
Secondary beam 134Sn at ~140MeV/u, Au target,
  
  402   Wed Oct 31 00:36:34 2018 JLT133In at ZDSMeasurement of neutron background while
Jungclaus experiment is running
Secondary beam 134Sn at XXMeV, Be target,
  
  325   Tue Jun 13 07:35:35 2017 briken team133Ba calibrationAfter experiment 133Ba calibration

Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx
  
  326   Tue Jun 13 08:02:35 2017 briken team133Ba calibrationAfter experiment 133Ba calibration

Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx
  
  160   Fri Nov 25 03:15:46 2016 AT Background Beam ON16/11/24 19h38min:  
Background measurement during tunning of
BigRips from 27-29F to 22C is started.
  
ELOG V3.1.4-unknown