ID |
Date |
Author |
Subject |
Text |
 |
12
|
Sun May 3 09:04:07 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Summary of neutron measurements |
U: (Up: 2 RIKEN tubes at 40cm from AIDA)
D: (Down: 12 RIKEN tubes at 80cm from AIDA)
|
|
348
|
Wed Oct 25 01:02:14 2017 |
RG | Status of the YSO array | The presently used detector has 48x48x5
mm3 YSO array with 1x1mm2 segments. They
are separated with ESR. We use H8500 |
|
210
|
Wed Mar 29 13:31:37 2017 |
J Agramunt, R. Caballero, T. Davinson, C. Griffin, O. Hall, D. Kahl, G. Kiss, J. Liu, S. Nishimura, V. Phong, JL Tain | Start of parasitic | Start of parasitic Ca beam
(main experiment "New isotope search", Ahn
et al.)
|
|
358
|
Tue Oct 16 03:15:03 2018 |
ATD & JLT | Start of REP run preparation (RIBF148) | 16-Oct-2018
- Start DACQ computer: OK!
|
|
134
|
Tue Nov 8 02:49:19 2016 |
PV, Liu | Specification of the dE silicon detector | The specification and picture of the dE silicon
detector is shown in the attached photos.
The detector has an effective area of 134 |
  |
190
|
Tue Nov 29 00:30:42 2016 |
PV,SN | Sillicon dE bias voltage increased | We increase the bias voltage of the dE
detector from 20 V to 100 V
Leakage current: |
|
123
|
Mon Nov 7 04:37:33 2016 |
Phong,Liu,... | Si de and AIDA plastic calibration | 60Co source placed close to the detectors:
ROOT files:
|
|
145
|
Tue Nov 8 17:00:27 2016 |
NTB, CG, AT | Si Delta E | At least during the timeframe in between
~ 21:30 (11/08) - 23:30 (11/09) (161108_2323_717273Ni.root)
we see that the silicon dE have a very low |
|
321
|
Mon Jun 12 02:45:44 2017 |
Iris Dillmann AT | Setup detectors. Id of Ancillary@BRIKEN | Attachment 1: Setup detectors
Attachment 2: example of configuration file
(valid only for RIBF127). The Id of the ancillary |
 |
171
|
Sat Nov 26 06:30:30 2016 |
AT | Setup | Setup for parasitic experiments
Energy 41Al @ F11 is around 145MeV/u
|
|
330
|
Mon Oct 16 05:52:14 2017 |
BRIKEN collaboration | START preparation | We start to check every thing for the coming
run
|
|
293
|
Wed May 24 06:42:05 2017 |
JLT,AT,AM,RY,SG | START Preparation | We start to check every thing for the coming
run
|
|
63
|
Thu Oct 6 02:03:32 2016 |
JL Tain | START | We started the assembly of BRIKEN and AIDA
detectors in their final position
on Tuesday October 4:
|
6x |
101
|
Thu Nov 3 04:40:02 2016 |
All | START | Start of commissioning preparation
|
|
131
|
Mon Nov 7 13:44:26 2016 |
Alvaro, Ale, Jorge, Jose | Running Gasific and run protocol | Preliminary |
|
162
|
Fri Nov 25 03:41:40 2016 |
AT | Run setups | Run setups during preparation of Fallon Parasitic
experiments (Kanungo experiment beam time)
can be found on
|
|
270
|
Sat Apr 1 02:07:49 2017 |
ID DK JA | Run 55 | Date: 1/04/2017
Start:10:04
BRIKEN run: 55
|
|
252
|
Fri Mar 31 10:35:22 2017 |
PV CG JA | Run 40 | Date: 31/03/2017
Start:
BRIKEN run: 40
|
|
251
|
Fri Mar 31 09:23:45 2017 |
CG PV JA | Run 39 | Date: 31/03/2017
Start: 17:22
BRIKEN run: 039
|
|
250
|
Fri Mar 31 08:23:32 2017 |
CG PV JA | Run 38 | Date: 31/03/2017
Start: 16:21
BRIKEN run: 038
|
|