IDup Date Author Subject Text Attachments
  41   Tue Jul 19 03:19:34 2016 A. Tarifeņo, I. Dillman, J. Agramunt, A. Tolosa, J.L. Tain...ElectronicsPreamplifier and signal cable testing

We check all signal cables,the flat cable
 preampCheck.zipnoTubeCh1.zip160717_preampCheck.root160717_preampCheck_noTubes.root 
  42   Tue Jul 19 04:09:32 2016 JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt Last tube fit in the matrix!!!The photo of great moment  DSC_2478.JPG 
  43   Tue Jul 19 04:34:57 2016 JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt Photos of the electronicsRacks, crates, rear part of the preamps and
matrix with all tubes.
 9x 
  44   Tue Jul 19 11:54:03 2016 JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt Photos of the AIDA insertion hole with the 3He tubesRIKEN tubes on the AIDA side with the SHV
right angle connector will protrude
by ~95mm in the HYBRID configuration (with
 DSC_2520.JPGDSC_2517.JPGDSC_2515.JPG 
  45   Tue Jul 19 13:47:55 2016 A. Tarifeņo-SaldiviaNeutron efficiency - Scanning on Z preliminary result We have carried out a scanning of
the neutron efficiency with respect to the
position along the Z-axis (AIDA and BEAM
 Preliminar_Zscaning_BRIKEN_PremLabel_vsmall.png 
  46   Wed Jul 20 08:58:13 2016 J.L. Tain, I.Dillman, R. Caballero, J. Agramunt, A. Tarifeņo, A. Tolosa, ...ElectronicsDistribution of connections of tubes in preamplifiers
and digitizers
 TubeDistribution-new.xlsxTubeDistribution-new.pdf 
  47   Wed Jul 20 11:16:18 2016 J.L. TainElectronicsPulser settings

We use two pulsers, Pulser1 for RIKEN, ORNL1
  
  48   Wed Jul 20 11:40:00 2016 J.L. Tain, J. Agramunt, R. Baeturia, A. Tarifeņo, A. Tolosa, ...252CfFirst measurement with full 140 tube version

of the BRIKEN neutron detector
 RIKEN-252Cf-V1A1.pngUPC-252Cf-V1A3.pngORNL1-252Cf-V1A5.pngORNL2-252Cf-V1A6.png 
  49   Wed Jul 20 11:49:00 2016 J.L. Tain, J. Agramunt, R. Baeturia, A. Tarifeņo, A. Tolosa, ...Background18/07/2016 
First background measurement overnight.
 160718_FullBrikenFirstData_bkg.zip 
  50   Wed Jul 20 12:00:15 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, ...252CfMeasurement with the source at the center

Listmode: 160719_BRIKEN_252Cf_009.dlt
  
  51   Wed Jul 20 16:07:58 2016 A.Tarifeņo, J.L. Tain, J. Agramunt, A. Tolosa, ...252Cf19/Jul/2016
Scanning of the efficiency as a function
of longitudinal position
  
  52   Wed Jul 20 16:12:58 2016 S. Go, ...CLOVERMounting of the CLOVER detectors in position

CLOVER G7: right of beam
 DSC_2522.JPGDSC_2523.JPGDSC_2524.JPG 
  53   Wed Jul 20 16:40:57 2016 S. Go, J.Agramunt, A.Tolosa, J.L. Tain,...CLOVERCalibration and resolution check

CLOVER detectors were calibrated in energy
 152Eu.png 
  54   Wed Jul 20 16:50:12 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, S. Go...252CfMeasurement of the 252Cf source at the central
position
  
  55   Wed Jul 20 16:55:48 2016 K.Gabor, K. Matsui, A. TarifeņoElectronicDrying of preamplifiers

PA8, PA9 and PA10 are removed and brought
  
  56   Wed Jul 20 17:05:59 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, ...BackgroundBackground measurement with remaining tubes
(95) overnight
 Bkg-with95tubes.png 
  57   Wed Jul 20 17:18:59 2016 J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, K. Gabor, S. Go, K. Matsui...ElectronicsMeasurement with preamplifiers after drying.

Amplifiers are brought back after ~12h and
 Bkg-afterPAdrying.pngV2A4C3-SpuriousSignal.png 
  58   Wed Jul 20 17:21:59 2016 J. Agramunt, A. TolosaDACQDACQ configuration parameters

The last configuration file used was: 160718Conf_BrikenFull_cal5.xlsx
 160718Conf_BrikenFull_cal5.xlsx 
  59   Fri Jul 22 12:50:29 2016 J.L. TainEND20/JUL/2016 20:00 
End of the test measurements
  
  60   Fri Jul 29 09:52:28 2016 Keishi Matsuiaccuracy of Cf-252's intensity in RIKEN According to the reply from Japan
Radioisotope Association, the accuracy of
the Cf-252's intensity is +0%/-15%.
 IMG_9350.JPG 