  249   Fri Mar 31 07:17:03 2017 OH PV JA CGRun 37
Date: 31/03/2017
Start: 15:24
BRIKEN run: 037
AIDA Run: R16_581
BigRIPS run: 181
DLT: 170331_1524_Mg40_037.dlt

BRIKEN Rate: 40  cps
F11 Rate:  12 cps

Date: 31/03/2017
Stop: 
BRIKEN run: 37
AIDA Run: R16_596
BigRIPS run: 181

Root file: 170331_1222_1621_B037_Mg40.root

OBSERVATIONS: 
  180   Sun Nov 27 07:10:29 2016 BRIKEN colaborationRun 31
=======    START    =======
Date 2016/11/27
Start time	: 13:53
BRIKEN run	: 031
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1353
AIDA run	: R20_0
AIDA start	: 13:51
BigRIPS run	: 1028
BigRIPS start	: 12:32:36
 
---------------------------
Shifters:  
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

------  Rates  ------
BRIKEN	:  Hz
F11R	:  Hz
Clovers	:  Hz
VPLT	:   Hz
VPLB	:   
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/26
BRIKEN run	: 031
BRIKEN stop	: 16:04
ROOT online	: 161127_1353_031.root
AIDA run	: R20_27
AIDA stop	: 16:04
BigRIPS RUN	: 1030
  240   Thu Mar 30 22:19:22 2017 Liu DK KG JA IDRun 28-29
Date: 31/03/2017
Start: 06:30
BRIKEN run: 28
AIDA Run: R16_451
BigRIPS run: 171
DLT:170331_0630_Mg40_028.dlt

BRIKEN Rate:40 divided by 10 (clock is 10Hz)
F11 Rate:11


Date:  31/03/2017
Stop: 07:57
BRIKEN run: 29
AIDA Run: R16_471
BigRIPS run: 171

Root file:170331_0012_0757_B028029_Mg40.root
OBSERVATIONS:Increase run file by accident. BigRIPS switched to 173
  238   Thu Mar 30 21:01:54 2017 JA DK KG LiuRun 27
Date: 31/03/2017
Start: 5:04
BRIKEN run: 27
AIDA Run: R16_429
BigRIPS run: 170
DLT: 170331_0503_Mg40_027.dlt

BRIKEN Rate:35 
F11 Rate:12


Date:  31/03/2017
Stop: 06:17
BRIKEN run:27
AIDA Run: R16_447
BigRIPS run: 170

Root file: 170331_0012_0617_B027_Mg40.root
OBSERVATIONS: Run 26 was fake.
At 6:14 we send a clear timestamp to keep the ranges of the rates.
Beam stopped.
  227   Thu Mar 30 07:41:58 2017 RCF PV SN CG JARun 15
Date: 30/03/2017
Start: 16:05
BRIKEN run: 15
AIDA Run: R16_231
BigRIPS run: 157
DLT:170330_1605_Mg40_015.dlt

BRIKEN Rate: 4
F11 Rate: 13


Date:  30/03/2017
Stop: 17:21
BRIKEN run:15
AIDA Run: r16_252
BigRIPS run: 157

Root file:170330_1605_1721_B015_Mg40.root
OBSERVATIONS: 
  226   Thu Mar 30 07:31:09 2017 SN PV CG RCF JARun 14
Date: 30/03/2017
Start: 15:30
BRIKEN run: 013
AIDA Run: RR16_222
BigRIPS run: run156
DLT: 170330_1528_Mg40_014.dlt
BRIKEN Rate: 3 cps 
F11 Rate: 12 cps


Date:  30/03/2017
Stop: 15:39
BRIKEN run:14
AIDA Run: R16_225
BigRIPS run: 156

Root file: 170330_1528_1535_B014_Mg40.root
OBSERVATIONS: NEW DEGRADER THICKNESS 8mm (before was 11mm)
Beam stopped for a problem in a magnet.
  225   Thu Mar 30 06:30:06 2017 JA CG PV SNRun 13
Date: 30/03/2017
Start: 14:25
BRIKEN run: 013
AIDA Run: R16_205
BigRIPS run: run155
DLT:170330_1426_Mg40_013.dlt

BRIKEN Rate: 40 cps 
F11 Rate: 14 cps


Date:  30/03/2017
Stop: 15:25
BRIKEN run:13
AIDA Run: R16_222
BigRIPS run: 155

Root file:170330_0947_1528_B013_Mg40.root
OBSERVATIONS: 
  246   Fri Mar 31 03:54:26 2017 ID JLTRun 034: gamma spectra background lines
There is a strong background line at ~1293 keV. According to the attached document this could come from the
neutron activation of 115In to 116In (14s halflife) of Indium seals.
  242   Fri Mar 31 01:01:58 2017 ID RCF OHRun 031
Date: 31/03/2017
Start: 08:58
BRIKEN run: 31
AIDA Run: R16_485
BigRIPS run: 174
DLT:170331_0858_Mg40_031.dlt

BRIKEN Rate:3.5cps
F11 Rate:11


Date:  31/03/2017
Stop: 09:44
BRIKEN run: 31
AIDA Run: R16_498
BigRIPS run: 174

Root file:170331_0012_0944_B031_Mg40.root
OBSERVATIONS:
Beam stopped at 9:44 to change the C foil
  179   Sun Nov 27 04:38:15 2016 BRIKEN collaborationRun 030
=======    START    =======
Date 2016/11/27
Start time	: 10:41
BRIKEN run	: 030
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161126_1041
AIDA run	: R17_0
AIDA start	: 10:41
BigRIPS run	: 1025
BigRIPS start	: 08:57:33
 
---------------------------
Shifters:  
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======
13:00 The syncro was lost. The TimeStamp was reset. We did not stop recording data. AIDA was writing
file R18_28, BRIKEN was writing file 161126_1041_030.dlt (@637MB). Notice that BRIKEN online histograms were not
reset, and the rates will not be plane.

------  Rates  ------
BRIKEN	: 200 Hz
F11R	: 100 Hz
Clovers	: 275 Hz
VPLT	:  18 Hz
VPLB	:   8 Hz
AIDAPL	:  10 Hz

=========   END   =========
Date 2016/11/26
BRIKEN run	: 030
BRIKEN stop	: 13:26
ROOT online	: 161126_1326_029_030.root
AIDA run	: R28_33
AIDA stop	: 13:26
BigRIPS RUN	: 1028
  241   Fri Mar 31 00:01:55 2017 ID JA DK GK LiuRun 030
Date: 31/03/2017
Start: 07:58
BRIKEN run: 30
AIDA Run: R16_471
BigRIPS run: 173
DLT:170331_0630_Mg40_030.dlt

BRIKEN Rate:40
F11 Rate:11


Date:  31/03/2017
Stop: 8:57
BRIKEN run: 30
AIDA Run: R16_485
BigRIPS run: 173

Root file:170331_0012_0857_B030_Mg40.root
OBSERVATIONS:
  178   Sun Nov 27 04:36:16 2016 BRIKEN collaborationRun 020-023
=======    START    =======
Date 2016/11/26
Start time	: 20:05
BRIKEN run	: 020
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161126_2004_
AIDA run	: R10-0
AIDA start	: 20:05
BigRIPS run	: 40Mg-1011
BigRIPS start	: 19:30
 
---------------------------
Shifters:  AT&AT, AE, GK
=======    Setup    =======
Central fragment:  41Al
--- Degraders ---
 Fixed: 3mm Pb  attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. OUT
2. IN
3. IN

=======  COMMENTS   =======

2016/11/27
02:48 Beam Off for a while.

07:15 Two peaks appeared in the syncMonitor for Ribf-AIDA. It was after the refilling of Liquid Ni. Not clear if
the possible sync problem affected the measurements.   

07:20 Beam OFF

------  Rates  ------
BRIKEN	:   1.90963e+02  Hz
F11R	:   9.75134 Hz
Clovers	:   2.03958e+02  Hz
VPLT	:   1.87119e+01  Hz
VPLB	:   7.76665  Hz
AIDAPL	:   1.00896e+01  Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 023
BRIKEN stop	: 06:25
ROOT online	: 161126_2004_020_023.root
AIDA run	: R10-211
AIDA stop	: 06:25
BigRIPS RUN	: 1022
  194   Thu Mar 23 09:04:38 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. NishimuraRemove EURICA rails
We remove partially the floor rails of EURICA 
to proof that it is possible to move BRIKEN + AIDA.

See attached photographs of the present status.
This will allow eventually to move both detectors by about
1 meter to have a better focus at the implantation position.
This movement could be done with a minimum of cable disconnection
using the wheels of both support tables.
  76   Tue Oct 11 17:11:28 2016 A. Tarifeno-Saldivia et al...ROOT macro
ROOT macro for calculation of neutron rates in the BRIKEN detector

Here a ROOT macro to calculate neutron rates from onlines root files generated DAQ configuration 
160718Conf_BrikenFull_cal5.xlsx (and the later ones).

Setup parameters are indicated at the begining of the macro. An output data file is generated with the rates by counter, ring and ADC. If the input root file is "file.root", the 
output data file is "file.root_data".

Further questions by email to: atarisal@gmail.com


 
  17   Mon May 4 03:20:00 2015 Shunji NishimuraRNC New Rule

We have some new rule about the data taken at RNC from this year.

Shunji

 

  157   Thu Nov 24 02:30:56 2016 CGRIBF123R1 Local ELogs

PDFs of the local ELog for the RIBF123R1 experiment Nov 2016

  37   Fri Jul 15 11:47:31 2016 Nathan Brewer and Alvaro TolosaPreliminary Ge Calibration, Resolution and Configuration

Today several tests (3) were done with the germanium detectors with the voltage configuration listed in the previous entry.

The tests were as follows:

Tests with 60Co+137Cs sources

1. Initial evaluation of calibration and resolution (Calibration60Co137Cs_energySignal.root)

2. Cable changes to optimize resolution for detector D4 (Calibration60Co137Cs_timingSignal.root)

Test with 152Eu

3. Final (proposed) configuration of filter parameters, voltages, and cable connections. (Calibration152Eu.root)

 

------------------------------------------------------------------------------------------------------------------------------------

At the time of this log the evaluation of resolution and calibration based on Eu data is to be completed.

The configuration file for the Ge is listed in FirsttestGe.xlsx .

The details of the tests can be found in the attached .pdf pictures or in the .root files.

You may notice that 2/4 of each clover count less than the other 2 and this is due to source position.

For the runs on Co and Cs It was seen that D4 had considerable tailing in channels 1 and 3 (black and green leaves, respectively) and D4 has worse resolution. Channel 3 (green) also requires a non-linear calibration. Currently only linear calibration is applied. But this is as expected from how the detectors were running before leaving Tennessee.

Therefore we decided to check if the second group of signal cables had better resolution for detector D4. The second group of cables were presumed to be timing signals and the run is labeled as such, however, the signals are similar within a few percent and this assumption may have been incorrect.

The result is listed in calibrationClovers.ods  in the third tab (TimingvsEnergy).

!!!Noise in the different groups of cables should be evaluated.!!!

Based on this test the first cable from the first test in D4 was reattached and the others remain in place. The second channel saw improvement and the 3rd and 4th channels saw limited change (deemed insignificant). This bundle has been labeled 'D4 Signal' for now.

Avg. D4 Resolution for Co and Cs lines is 3.3 keV FWHM

Avg. G7 Resolution for Co and Cs lines is 2.6 keV FWHM

We estimate that these are accurate within ~10%. But this is sufficient analysis for this point and time.

Further details will be posted regarding the Eu data , at a glance the configuration is seen to be very close except for the known non-linearity in D4 and one channel from G7 which should definitely be recalibrated. Thresholds and noise levels should also be re-evaluated.

 

 

 

 

 

 

  195   Thu Mar 23 09:30:58 2017 JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. NishimuraPower-up and 1st spectrum
Crates powered up.
DACQ started.
New directory: /data/1703Preparation/
DACQ configuration file: 170323Conf_BrikenFull.xlsx 
(copied from from 161125Conf_BrikenFull_23.16.xlsx)
Short background run: 170323_1841_Background.root.
Neutron spectrum looks OK (see attached graph)
All the tubes look Ok.
  72   Sun Oct 9 15:49:41 2016 JL Tain et alPower shutdown
Due to maintenance operations of the Wako electrical
company there is a risk of power shutdowns on Saturday,
Sunday and Monday from about 8 am to 8 pm.

So we have to stop working on the hardware during
this time
  4   Mon Feb 16 00:29:00 2015 Gabor KISSPolyethyelene

The polyethelene arrived at RIKEN. Except 4 neighboring holes (located at the inner ring) the alignment is OK.

ELOG V3.1.4-unknown