AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 4 of 21  ELOG logo
Entry  Fri Mar 31 07:17:03 2017, OH PV JA CG, Run 37 
Date: 31/03/2017
Start: 15:24
BRIKEN run: 037
Entry  Sun Nov 27 07:10:29 2016, BRIKEN colaboration, Run 31 
=======    START    =======
Date 2016/11/27
Start time : 13:53
Entry  Thu Mar 30 22:19:22 2017, Liu DK KG JA ID, Run 28-29 
Date: 31/03/2017
Start: 06:30
BRIKEN run: 28
Entry  Thu Mar 30 21:01:54 2017, JA DK KG Liu, Run 27 
Date: 31/03/2017
Start: 5:04
BRIKEN run: 27
Entry  Thu Mar 30 07:41:58 2017, RCF PV SN CG JA, Run 15 
Date: 30/03/2017
Start: 16:05
BRIKEN run: 15
Entry  Thu Mar 30 07:31:09 2017, SN PV CG RCF JA, Run 14 
Date: 30/03/2017
Start: 15:30
BRIKEN run: 013
Entry  Thu Mar 30 06:30:06 2017, JA CG PV SN, Run 13 
Date: 30/03/2017
Start: 14:25
BRIKEN run: 013
Entry  Fri Mar 31 03:54:26 2017, ID JLT, Run 034: gamma spectra background lines natural-gammas.pdf
There is a strong background line at ~1293 keV. According to the attached document this could come from the
neutron activation of 115In to 116In (14s halflife) of Indium seals.
Entry  Fri Mar 31 01:01:58 2017, ID RCF OH, Run 031 
Date: 31/03/2017
Start: 08:58
BRIKEN run: 31
Entry  Sun Nov 27 04:38:15 2016, BRIKEN collaboration, Run 030 
=======    START    =======
Date 2016/11/27
Start time : 10:41
Entry  Fri Mar 31 00:01:55 2017, ID JA DK GK Liu, Run 030 
Date: 31/03/2017
Start: 07:58
BRIKEN run: 30
Entry  Sun Nov 27 04:36:16 2016, BRIKEN collaboration, Run 020-023 
=======    START    =======
Date 2016/11/26
Start time : 20:05
Entry  Thu Mar 23 09:04:38 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, Remove EURICA rails Donwstream-EURICA-Rail.jpgUpstream-EURICA-Rail.jpgGeneralView.jpg
We remove partially the floor rails of EURICA 
to proof that it is possible to move BRIKEN + AIDA.
Entry  Tue Oct 11 17:11:28 2016, A. Tarifeno-Saldivia et al..., ROOT macro  BRIKEN_rates_v3.cc
ROOT macro for calculation of neutron rates in the BRIKEN detector

Here a ROOT macro to calculate neutron rates from onlines root files generated DAQ configuration 
Entry  Mon May 4 03:20:00 2015, Shunji Nishimura, RNC New Rule kanri_e.pdf
We have some new rule about the data taken at RNC from this year. 
Shunji
 
Entry  Thu Nov 24 02:30:56 2016, CG, RIBF123R1 Local ELogs 9x
PDFs of the local ELog for the RIBF123R1 experiment Nov 2016
Entry  Fri Jul 15 11:47:31 2016, Nathan Brewer and Alvaro Tolosa, Preliminary Ge Calibration, Resolution and Configuration 9x
Today several tests (3) were done with the germanium detectors with the voltage configuration listed in the previous entry.
The tests were as follows:
Tests with 60Co+137Cs sources
Entry  Thu Mar 23 09:30:58 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, Power-up and 1st spectrum 170323_1841Background.pdf
Crates powered up.
DACQ started.
New directory: /data/1703Preparation/
Entry  Sun Oct 9 15:49:41 2016, JL Tain et al, Power shutdown 
Due to maintenance operations of the Wako electrical
company there is a risk of power shutdowns on Saturday,
Sunday and Monday from about 8 am to 8 pm.
Entry  Mon Feb 16 00:29:00 2015, Gabor KISS, Polyethyelene bottom1.JPGsmall2.JPG
The polyethelene arrived at RIKEN. Except 4 neighboring holes (located at the inner ring) the alignment is OK.
ELOG V3.1.4-unknown