Fri Mar 31 07:17:03 2017, OH PV JA CG, Run 37
|
Date: 31/03/2017
Start: 15:24
BRIKEN run: 037
|
Sun Nov 27 07:10:29 2016, BRIKEN colaboration, Run 31
|
======= START =======
Date 2016/11/27
Start time : 13:53
|
Thu Mar 30 22:19:22 2017, Liu DK KG JA ID, Run 28-29
|
Date: 31/03/2017
Start: 06:30
BRIKEN run: 28
|
Thu Mar 30 21:01:54 2017, JA DK KG Liu, Run 27
|
Date: 31/03/2017
Start: 5:04
BRIKEN run: 27
|
Thu Mar 30 07:41:58 2017, RCF PV SN CG JA, Run 15
|
Date: 30/03/2017
Start: 16:05
BRIKEN run: 15
|
Thu Mar 30 07:31:09 2017, SN PV CG RCF JA, Run 14
|
Date: 30/03/2017
Start: 15:30
BRIKEN run: 013
|
Thu Mar 30 06:30:06 2017, JA CG PV SN, Run 13
|
Date: 30/03/2017
Start: 14:25
BRIKEN run: 013
|
Fri Mar 31 03:54:26 2017, ID JLT, Run 034: gamma spectra background lines
|
There is a strong background line at ~1293 keV. According to the attached document this could come from the
neutron activation of 115In to 116In (14s halflife) of Indium seals. |
Fri Mar 31 01:01:58 2017, ID RCF OH, Run 031
|
Date: 31/03/2017
Start: 08:58
BRIKEN run: 31
|
Sun Nov 27 04:38:15 2016, BRIKEN collaboration, Run 030
|
======= START =======
Date 2016/11/27
Start time : 10:41
|
Fri Mar 31 00:01:55 2017, ID JA DK GK Liu, Run 030
|
Date: 31/03/2017
Start: 07:58
BRIKEN run: 30
|
Sun Nov 27 04:36:16 2016, BRIKEN collaboration, Run 020-023
|
======= START =======
Date 2016/11/26
Start time : 20:05
|
Thu Mar 23 09:04:38 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, Remove EURICA rails  
|
We remove partially the floor rails of EURICA
to proof that it is possible to move BRIKEN + AIDA.
|
Tue Oct 11 17:11:28 2016, A. Tarifeno-Saldivia et al..., ROOT macro
|
ROOT macro for calculation of neutron rates in the BRIKEN detector
Here a ROOT macro to calculate neutron rates from onlines root files generated DAQ configuration
|
Mon May 4 03:20:00 2015, Shunji Nishimura, RNC New Rule
|
We have some new rule about the data taken at RNC from this year.
Shunji
|
Thu Nov 24 02:30:56 2016, CG, RIBF123R1 Local ELogs 9x
|
PDFs of the local ELog for the RIBF123R1 experiment Nov 2016 |
Fri Jul 15 11:47:31 2016, Nathan Brewer and Alvaro Tolosa, Preliminary Ge Calibration, Resolution and Configuration 9x
|
Today several tests (3) were done with the germanium detectors with the voltage configuration listed in the previous entry.
The tests were as follows:
Tests with 60Co+137Cs sources |
Thu Mar 23 09:30:58 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, Power-up and 1st spectrum
|
Crates powered up.
DACQ started.
New directory: /data/1703Preparation/
|
Sun Oct 9 15:49:41 2016, JL Tain et al, Power shutdown
|
Due to maintenance operations of the Wako electrical
company there is a risk of power shutdowns on Saturday,
Sunday and Monday from about 8 am to 8 pm.
|
Mon Feb 16 00:29:00 2015, Gabor KISS, Polyethyelene 
|
The polyethelene arrived at RIKEN. Except 4 neighboring holes (located at the inner ring) the alignment is OK. |