Fri Mar 31 07:17:03 2017, OH PV JA CG, Run 37
|
Date: 31/03/2017
Start: 15:24
BRIKEN run: 037
AIDA Run: R16_581
BigRIPS run: 181
DLT: 170331_1524_Mg40_037.dlt
BRIKEN Rate: 40 cps
F11 Rate: 12 cps
Date: 31/03/2017
Stop:
BRIKEN run: 37
AIDA Run: R16_596
BigRIPS run: 181
Root file: 170331_1222_1621_B037_Mg40.root
OBSERVATIONS: |
Sun Nov 27 07:10:29 2016, BRIKEN colaboration, Run 31
|
======= START =======
Date 2016/11/27
Start time : 13:53
BRIKEN run : 031
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1353
AIDA run : R20_0
AIDA start : 13:51
BigRIPS run : 1028
BigRIPS start : 12:32:36
---------------------------
Shifters:
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB :
AIDAPL : Hz
========= END =========
Date 2016/11/26
BRIKEN run : 031
BRIKEN stop : 16:04
ROOT online : 161127_1353_031.root
AIDA run : R20_27
AIDA stop : 16:04
BigRIPS RUN : 1030 |
Thu Mar 30 22:19:22 2017, Liu DK KG JA ID, Run 28-29
|
Date: 31/03/2017
Start: 06:30
BRIKEN run: 28
AIDA Run: R16_451
BigRIPS run: 171
DLT:170331_0630_Mg40_028.dlt
BRIKEN Rate:40 divided by 10 (clock is 10Hz)
F11 Rate:11
Date: 31/03/2017
Stop: 07:57
BRIKEN run: 29
AIDA Run: R16_471
BigRIPS run: 171
Root file:170331_0012_0757_B028029_Mg40.root
OBSERVATIONS:Increase run file by accident. BigRIPS switched to 173 |
Thu Mar 30 21:01:54 2017, JA DK KG Liu, Run 27
|
Date: 31/03/2017
Start: 5:04
BRIKEN run: 27
AIDA Run: R16_429
BigRIPS run: 170
DLT: 170331_0503_Mg40_027.dlt
BRIKEN Rate:35
F11 Rate:12
Date: 31/03/2017
Stop: 06:17
BRIKEN run:27
AIDA Run: R16_447
BigRIPS run: 170
Root file: 170331_0012_0617_B027_Mg40.root
OBSERVATIONS: Run 26 was fake.
At 6:14 we send a clear timestamp to keep the ranges of the rates.
Beam stopped. |
Thu Mar 30 07:41:58 2017, RCF PV SN CG JA, Run 15
|
Date: 30/03/2017
Start: 16:05
BRIKEN run: 15
AIDA Run: R16_231
BigRIPS run: 157
DLT:170330_1605_Mg40_015.dlt
BRIKEN Rate: 4
F11 Rate: 13
Date: 30/03/2017
Stop: 17:21
BRIKEN run:15
AIDA Run: r16_252
BigRIPS run: 157
Root file:170330_1605_1721_B015_Mg40.root
OBSERVATIONS: |
Thu Mar 30 07:31:09 2017, SN PV CG RCF JA, Run 14
|
Date: 30/03/2017
Start: 15:30
BRIKEN run: 013
AIDA Run: RR16_222
BigRIPS run: run156
DLT: 170330_1528_Mg40_014.dlt
BRIKEN Rate: 3 cps
F11 Rate: 12 cps
Date: 30/03/2017
Stop: 15:39
BRIKEN run:14
AIDA Run: R16_225
BigRIPS run: 156
Root file: 170330_1528_1535_B014_Mg40.root
OBSERVATIONS: NEW DEGRADER THICKNESS 8mm (before was 11mm)
Beam stopped for a problem in a magnet. |
Thu Mar 30 06:30:06 2017, JA CG PV SN, Run 13
|
Date: 30/03/2017
Start: 14:25
BRIKEN run: 013
AIDA Run: R16_205
BigRIPS run: run155
DLT:170330_1426_Mg40_013.dlt
BRIKEN Rate: 40 cps
F11 Rate: 14 cps
Date: 30/03/2017
Stop: 15:25
BRIKEN run:13
AIDA Run: R16_222
BigRIPS run: 155
Root file:170330_0947_1528_B013_Mg40.root
OBSERVATIONS: |
Fri Mar 31 03:54:26 2017, ID JLT, Run 034: gamma spectra background lines
|
There is a strong background line at ~1293 keV. According to the attached document this could come from the
neutron activation of 115In to 116In (14s halflife) of Indium seals. |
Fri Mar 31 01:01:58 2017, ID RCF OH, Run 031
|
Date: 31/03/2017
Start: 08:58
BRIKEN run: 31
AIDA Run: R16_485
BigRIPS run: 174
DLT:170331_0858_Mg40_031.dlt
BRIKEN Rate:3.5cps
F11 Rate:11
Date: 31/03/2017
Stop: 09:44
BRIKEN run: 31
AIDA Run: R16_498
BigRIPS run: 174
Root file:170331_0012_0944_B031_Mg40.root
OBSERVATIONS:
Beam stopped at 9:44 to change the C foil |
Sun Nov 27 04:38:15 2016, BRIKEN collaboration, Run 030
|
======= START =======
Date 2016/11/27
Start time : 10:41
BRIKEN run : 030
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161126_1041
AIDA run : R17_0
AIDA start : 10:41
BigRIPS run : 1025
BigRIPS start : 08:57:33
---------------------------
Shifters:
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
13:00 The syncro was lost. The TimeStamp was reset. We did not stop recording data. AIDA was writing
file R18_28, BRIKEN was writing file 161126_1041_030.dlt (@637MB). Notice that BRIKEN online histograms were not
reset, and the rates will not be plane.
------ Rates ------
BRIKEN : 200 Hz
F11R : 100 Hz
Clovers : 275 Hz
VPLT : 18 Hz
VPLB : 8 Hz
AIDAPL : 10 Hz
========= END =========
Date 2016/11/26
BRIKEN run : 030
BRIKEN stop : 13:26
ROOT online : 161126_1326_029_030.root
AIDA run : R28_33
AIDA stop : 13:26
BigRIPS RUN : 1028 |
Fri Mar 31 00:01:55 2017, ID JA DK GK Liu, Run 030
|
Date: 31/03/2017
Start: 07:58
BRIKEN run: 30
AIDA Run: R16_471
BigRIPS run: 173
DLT:170331_0630_Mg40_030.dlt
BRIKEN Rate:40
F11 Rate:11
Date: 31/03/2017
Stop: 8:57
BRIKEN run: 30
AIDA Run: R16_485
BigRIPS run: 173
Root file:170331_0012_0857_B030_Mg40.root
OBSERVATIONS: |
Sun Nov 27 04:36:16 2016, BRIKEN collaboration, Run 020-023
|
======= START =======
Date 2016/11/26
Start time : 20:05
BRIKEN run : 020
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161126_2004_
AIDA run : R10-0
AIDA start : 20:05
BigRIPS run : 40Mg-1011
BigRIPS start : 19:30
---------------------------
Shifters: AT&AT, AE, GK
======= Setup =======
Central fragment: 41Al
--- Degraders ---
Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. OUT
2. IN
3. IN
======= COMMENTS =======
2016/11/27
02:48 Beam Off for a while.
07:15 Two peaks appeared in the syncMonitor for Ribf-AIDA. It was after the refilling of Liquid Ni. Not clear if
the possible sync problem affected the measurements.
07:20 Beam OFF
------ Rates ------
BRIKEN : 1.90963e+02 Hz
F11R : 9.75134 Hz
Clovers : 2.03958e+02 Hz
VPLT : 1.87119e+01 Hz
VPLB : 7.76665 Hz
AIDAPL : 1.00896e+01 Hz
========= END =========
Date 2016/11/27
BRIKEN run : 023
BRIKEN stop : 06:25
ROOT online : 161126_2004_020_023.root
AIDA run : R10-211
AIDA stop : 06:25
BigRIPS RUN : 1022 |
Thu Mar 23 09:04:38 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, Remove EURICA rails  
|
We remove partially the floor rails of EURICA
to proof that it is possible to move BRIKEN + AIDA.
See attached photographs of the present status.
This will allow eventually to move both detectors by about
1 meter to have a better focus at the implantation position.
This movement could be done with a minimum of cable disconnection
using the wheels of both support tables. |
Tue Oct 11 17:11:28 2016, A. Tarifeno-Saldivia et al..., ROOT macro
|
ROOT macro for calculation of neutron rates in the BRIKEN detector
Here a ROOT macro to calculate neutron rates from onlines root files generated DAQ configuration
160718Conf_BrikenFull_cal5.xlsx (and the later ones).
Setup parameters are indicated at the begining of the macro. An output data file is generated with the rates by counter, ring and ADC. If the input root file is "file.root", the
output data file is "file.root_data".
Further questions by email to: atarisal@gmail.com
|
Mon May 4 03:20:00 2015, Shunji Nishimura, RNC New Rule
|
We have some new rule about the data taken at RNC from this year.
Shunji
|
Thu Nov 24 02:30:56 2016, CG, RIBF123R1 Local ELogs 9x
|
PDFs of the local ELog for the RIBF123R1 experiment Nov 2016 |
Fri Jul 15 11:47:31 2016, Nathan Brewer and Alvaro Tolosa, Preliminary Ge Calibration, Resolution and Configuration 9x
|
Today several tests (3) were done with the germanium detectors with the voltage configuration listed in the previous entry.
The tests were as follows:
Tests with 60Co+137Cs sources
1. Initial evaluation of calibration and resolution (Calibration60Co137Cs_energySignal.root)
2. Cable changes to optimize resolution for detector D4 (Calibration60Co137Cs_timingSignal.root)
Test with 152Eu
3. Final (proposed) configuration of filter parameters, voltages, and cable connections. (Calibration152Eu.root)
------------------------------------------------------------------------------------------------------------------------------------
At the time of this log the evaluation of resolution and calibration based on Eu data is to be completed.
The configuration file for the Ge is listed in FirsttestGe.xlsx .
The details of the tests can be found in the attached .pdf pictures or in the .root files.
You may notice that 2/4 of each clover count less than the other 2 and this is due to source position.
For the runs on Co and Cs It was seen that D4 had considerable tailing in channels 1 and 3 (black and green leaves, respectively) and D4 has worse resolution. Channel 3 (green) also requires a non-linear calibration. Currently only linear calibration is applied. But this is as expected from how the detectors were running before leaving Tennessee.
Therefore we decided to check if the second group of signal cables had better resolution for detector D4. The second group of cables were presumed to be timing signals and the run is labeled as such, however, the signals are similar within a few percent and this assumption may have been incorrect.
The result is listed in calibrationClovers.ods in the third tab (TimingvsEnergy).
!!!Noise in the different groups of cables should be evaluated.!!!
Based on this test the first cable from the first test in D4 was reattached and the others remain in place. The second channel saw improvement and the 3rd and 4th channels saw limited change (deemed insignificant). This bundle has been labeled 'D4 Signal' for now.
Avg. D4 Resolution for Co and Cs lines is 3.3 keV FWHM
Avg. G7 Resolution for Co and Cs lines is 2.6 keV FWHM
We estimate that these are accurate within ~10%. But this is sufficient analysis for this point and time.
Further details will be posted regarding the Eu data , at a glance the configuration is seen to be very close except for the known non-linearity in D4 and one channel from G7 which should definitely be recalibrated. Thresholds and noise levels should also be re-evaluated.
|
Thu Mar 23 09:30:58 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, Power-up and 1st spectrum
|
Crates powered up.
DACQ started.
New directory: /data/1703Preparation/
DACQ configuration file: 170323Conf_BrikenFull.xlsx
(copied from from 161125Conf_BrikenFull_23.16.xlsx)
Short background run: 170323_1841_Background.root.
Neutron spectrum looks OK (see attached graph)
All the tubes look Ok. |
Sun Oct 9 15:49:41 2016, JL Tain et al, Power shutdown
|
Due to maintenance operations of the Wako electrical
company there is a risk of power shutdowns on Saturday,
Sunday and Monday from about 8 am to 8 pm.
So we have to stop working on the hardware during
this time |
Mon Feb 16 00:29:00 2015, Gabor KISS, Polyethyelene 
|
The polyethelene arrived at RIKEN. Except 4 neighboring holes (located at the inner ring) the alignment is OK. |