249
|
Fri Mar 31 07:17:03 2017 |
OH PV JA CG | Run 37 | Date: 31/03/2017
Start: 15:24
BRIKEN run: 037
|
|
|
180
|
Sun Nov 27 07:10:29 2016 |
BRIKEN colaboration | Run 31 | ======= START =======
Date 2016/11/27
Start time : 13:53
|
|
|
240
|
Thu Mar 30 22:19:22 2017 |
Liu DK KG JA ID | Run 28-29 | Date: 31/03/2017
Start: 06:30
BRIKEN run: 28
|
|
|
238
|
Thu Mar 30 21:01:54 2017 |
JA DK KG Liu | Run 27 | Date: 31/03/2017
Start: 5:04
BRIKEN run: 27
|
|
|
227
|
Thu Mar 30 07:41:58 2017 |
RCF PV SN CG JA | Run 15 | Date: 30/03/2017
Start: 16:05
BRIKEN run: 15
|
|
|
226
|
Thu Mar 30 07:31:09 2017 |
SN PV CG RCF JA | Run 14 | Date: 30/03/2017
Start: 15:30
BRIKEN run: 013
|
|
|
225
|
Thu Mar 30 06:30:06 2017 |
JA CG PV SN | Run 13 | Date: 30/03/2017
Start: 14:25
BRIKEN run: 013
|
|
|
246
|
Fri Mar 31 03:54:26 2017 |
ID JLT | Run 034: gamma spectra background lines | There is a strong background line at ~1293
keV. According to the attached document this
could come from the
|
|
|
242
|
Fri Mar 31 01:01:58 2017 |
ID RCF OH | Run 031 | Date: 31/03/2017
Start: 08:58
BRIKEN run: 31
|
|
|
179
|
Sun Nov 27 04:38:15 2016 |
BRIKEN collaboration | Run 030 | ======= START =======
Date 2016/11/27
Start time : 10:41
|
|
|
241
|
Fri Mar 31 00:01:55 2017 |
ID JA DK GK Liu | Run 030 | Date: 31/03/2017
Start: 07:58
BRIKEN run: 30
|
|
|
178
|
Sun Nov 27 04:36:16 2016 |
BRIKEN collaboration | Run 020-023 | ======= START =======
Date 2016/11/26
Start time : 20:05
|
|
|
194
|
Thu Mar 23 09:04:38 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | Remove EURICA rails | We remove partially the floor rails of EURICA
to proof that it is possible to move BRIKEN |
  |
|
76
|
Tue Oct 11 17:11:28 2016 |
A. Tarifeno-Saldivia et al... | ROOT macro | ROOT macro for calculation of neutron rates
in the BRIKEN detector
|
|
|
17
|
Mon May 4 03:20:00 2015 |
Shunji Nishimura | RNC New Rule | We have some new rule about the data taken
at RNC from this year.
Shunji |
|
|
157
|
Thu Nov 24 02:30:56 2016 |
CG | RIBF123R1 Local ELogs | PDFs of the local ELog for the RIBF123R1
experiment Nov 2016 |
9x |
|
37
|
Fri Jul 15 11:47:31 2016 |
Nathan Brewer and Alvaro Tolosa | Preliminary Ge Calibration, Resolution and Configuration | Today several tests (3) were done with
the germanium detectors with the voltage
configuration listed in the previous entry. |
9x |
|
195
|
Thu Mar 23 09:30:58 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | Power-up and 1st spectrum | Crates powered up.
DACQ started.
New directory: /data/1703Preparation/
|
|
|
72
|
Sun Oct 9 15:49:41 2016 |
JL Tain et al | Power shutdown | Due to maintenance operations of the Wako
electrical
company there is a risk of power shutdowns |
|
|
4
|
Mon Feb 16 00:29:00 2015 |
Gabor KISS | Polyethyelene | The polyethelene arrived at RIKEN. Except
4 neighboring holes (located at the inner
ring) the alignment is OK. |
 |