AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 6 of 21  ELOG logo
Entry  Tue Nov 8 15:10:24 2016, Many, 717273Ni Run 
F7 OUT F11 C-6mm

Start: 00:09
Entry  Tue Mar 28 09:10:09 2017, Many, 152Eu 170328_1707_152Eu_CloverCal.root170328_1707_CloverCalibration.ods
152Eu source inside BRIKEN for CLOVER calibration.
Also calibration of Si-dE with 60Co source
and AIDA_PL calibration  with 60Co source.
Entry  Wed Mar 29 14:14:58 2017, Many, 40Mg RUN 000 
Date: 29/03/2017

Start: 22:13
Entry  Wed Mar 29 15:16:17 2017, Many, 40Mg Run 001 
Date: 29/03/2017

Start: 23:13
Entry  Mon Nov 5 09:59:36 2018, MW, KR, suspicious clover G7 temp sensor 
We observed 6 pm LN2 filling of both clovers on Monday Nov 5th.

D4 went full within reasonable time of below 10 minutes.

Filling of G7 was stopped by "emergency sensor" after about 15 minutes of filling.
    Reply  Mon Nov 5 18:52:54 2018, MW, KR, suspicious clover G7 temp sensor 
 




Quote:



We observed 6 pm LN2 filling of both clovers on Monday Nov 5th.
Entry  Sat Apr 1 22:18:00 2017, Liu, YS, CG, GK, SN, JLT , 38Mg run 72 
DUMMY
Entry  Thu Mar 30 22:19:22 2017, Liu DK KG JA ID, Run 28-29 
Date: 31/03/2017
Start: 06:30
BRIKEN run: 28
Entry  Fri Jul 29 09:52:28 2016, Keishi Matsui, accuracy of Cf-252's intensity in RIKEN IMG_9350.JPG
 According to the reply from Japan Radioisotope Association, the accuracy of the Cf-252's intensity is +0%/-15%.
( "+0%" is important, because 3.7 MBq is a standard limit for radio-active sources  in Japan.)
Entry  Sun Oct 22 08:52:17 2017, KR,JA,ATD,JLT, Clover resolution 
Resolution check using 40K 1460 keV line 
in the background measurement overnight
(File: 171022_0126_1101_bck.root)
Entry  Mon Nov 5 06:46:30 2018, KR, YR, MW, JLT, ..., Clover check Screenshot_from_2018-11-05_15-57-40.pngScreenshot_from_2018-11-05_16-23-12.png

With detectors still on the floor we check signals and found
that D4 gives no signal with PA power.  Two power supplies/cables were checked.
Entry  Fri Oct 20 05:33:11 2017, KR, NB, SG, RY, JL, AT: , Calibration and Resolution of D4 (after Repair)  IMG_20171019_105549066.jpgD4Oct19.ods
Green and Red channels were repaired by crimping and securing the grounding of the cables and fixing the cables securely to the table. 

All problems during the repair process were visible on the scope. See example attatched. 

Calibration is as:
Entry  Thu Nov 10 05:05:54 2016, KM, How to convert ridf-file to root-file 
1. Login to briken@ribfana03.riken.jp

2. Check if the ridf-file you want to convert is in the directory; /home/briken16/rawdata/bigrips/

3. Login to anaroot; type "anarootlogin"
Entry  Wed Jul 20 16:55:48 2016, K.Gabor, K. Matsui, A. Tarifeņo, Electronic 
Drying of preamplifiers

PA8, PA9 and PA10 are removed and brought to a dryer box
Entry  Mon Apr 27 10:18:21 2015, K.Gabor S.Nishimura J.Agramunt, ORNL 3He tube at RIKEN photo-3.JPG
 
Entry  Mon May 29 05:40:49 2017, K. Matsui, energy loss at logn  
 
Entry  Mon May 29 07:06:56 2017, K. Matsui, Energy loss in Long Plastic Scintillator 
After Al degrader with the optimized width of 13 mm, the energy loss in Long Plastic Scintillator is 546(2) MeV at F11.

This value depends on 
Entry  Sat Nov 5 01:26:46 2016, Jose,Iris,Alvaro, Alejandro, Krzysztof, Background measurement 7x
Measurement overnight

Start: around 1:00
Entry  Sun Nov 20 12:28:27 2016, Jorge, Alvaro, Jose, DACQ GasificShort.pdf
Updated run protocol
Entry  Sun Nov 20 13:02:06 2016, Jorge, Alavaro, Jose, DACQ Gasific70Manual.pdf
Gasific-7.0 Short Manual (Preliminary)
ELOG V3.1.3-7933898