  387   Wed Oct 24 16:11:32 2018 AT & ATLow threshold, 252Cf, z=-25cm252Cf at z=-25cm,ie 25 cm downstream the beam,
source axis parallel.
Low threshold.
  
  394   Thu Oct 25 16:08:53 2018 ATS & JLTLead bricksLead bricks in BRIKEN hole to protect AIDA   
  42   Tue Jul 19 04:09:32 2016 JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt Last tube fit in the matrix!!!The photo of great moment  DSC_2478.JPG 
  353   Fri Oct 27 10:04:31 2017 SG, RYLISE++ file for BRIKEN1Here attached the lise file for BRIKEN1  Cu82_Be5mm_Brho7.7000Tm_F1deg8mm_F5deg8mm_F7_D80mod_F11nuclei.png 
  191   Thu Dec 8 04:17:49 2016 PVInstalling BRIKEN ELOG 2016 in RIBF local network to a personal computerAll the RIBF123 elog website (including
Takechi and Fallon experiment) can be
downloaded and installed from the following
 Screenshot_from_2016-12-08_13-30-16.png 
  81   Thu Oct 13 12:58:31 2016 JL Tain et alINCIDENTNIM Crate Failure. Lost of CLOVER G7

One of the 2 NIM crates, the one containing
  
  323   Tue Jun 13 05:18:07 2017 PVHow to install ELOG for BRIKEN campaign 2017a Get ELOG software including entries for BRIKEN
campaign 2017a from mars computer:
  
  Draft   Thu Nov 10 05:05:54 2016 KMHow to convert ridf-file to root-file1. Login to briken@ribfana03.riken.jp

2. Check if the ridf-file you want
to convert is in the directory; /home/briken16/rawdata/bigrips/
  
  31   Sat Jul 9 21:00:54 2016 J.L. TainHardwareA list of the available hardware  Hardware.xlsxHardware.pdf 
  327   Wed Jun 14 06:22:21 2017 Ariel, Liu, Go, NishinmuraHV is offTo protect HPGe and 3He tubes from high
intentsity primary beam, HV of these detector
are off and the HPGe will be dismounted.
  
  38   Mon Jul 18 09:32:50 2016 Shintaro GoHV controlsYou can start applying HVs on the detectors
using macro on the control-computer.
If you have already signed in the
  
  126   Mon Nov 7 06:55:01 2016 NTB, SGHPGe Fill line to D4 replacedHPGe fill line to D4 replaced only small
leak (overflow) once Ge is full.

Solenoid was also wrapped to no
  
  88   Fri Oct 14 13:32:52 2016 NT BREWER, S Go, JM AllmondGe preamp power loss and solution. As previously recorded (81), on Thur Oct
13th, A NIM crate failure caused preamp power
loss to the HPGe's. While D4 recovered
  
  350   Wed Oct 25 18:12:43 2017 Sunflower collaborationGamma sources web pagehttp://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html   
  112   Sat Nov 5 03:18:13 2016 SG BCR RCF NTBGamma peaks in the overnight run, related to neutron inelastic scatteringWe looked at the overnight background run
(161105_0935_BackgroundOvernight.root), There
are gamma-peaks that could be related
 08.png06.png 
  329   Thu Jun 15 10:07:56 2017 BRIKEN collaborationGamma calibrationsClover calibrations. 

- Datafiles are located in the
dac computer, path:
 WhatsApp_Image_2017-06-15_at_18.00.36.jpegWhatsApp_Image_2017-06-15_at_18.00.51.jpegWhatsApp_Image_2017-06-15_at_18.37.12.jpeg 
  351   Wed Oct 25 19:14:09 2017 NBFirst pass efficiency for current experimentI roughly (~10%) checked the efficiency
for 4 of the peaks from  171025_1222_1355_152EuCloverCal.root.

I checked the peaks at 122, 245,
  
  26   Wed May 6 11:41:24 2015 J. Agramunt, A. EstradeFirst online combined analysisScreen shot of the rudimentary on-line
analysis of the combined data:
BRIKEN-AIDA-BigRIPS
 Screenshot_from_2015-05-06_19_12_29.png 
  89   Fri Oct 14 14:06:38 2016 AllFirst measurement of BRIKEN and AIDAFriday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common
clock.
 161014Conf_BrikenFull.xlsx 
  342   Sun Oct 22 10:26:44 2017 JA,ATD,JLT,RG,RY,SG,MS,PV,Liu,KRFirst Wasabi-YSO-BRIKEN correlation test60Co source between YSO and Wasabi in front
of D4 Clover
Briken configuration file: 171022_1811_Conf_BrikenFullYSO.xlsx
 171022_1846_Conf_BrikenFullYSO.xlsx171022_1846_60Co_WasabiBrikenYSO.png 