AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 1 of 34  ELOG logo
Entry  Thu May 8 09:25:34 2025, Jan Glorius,  
 
Entry  Sat Apr 26 22:01:37 2025, CB, Proxy bridge 
Proxy bridge enabling anydesk and generic Internet access dropped due to atppc025 being rebooted. Found it dropped again late today.

Restarted bridge inside a screen session.
Entry  Wed Apr 23 11:08:34 2025, TD, JM, Background Run 11x

12.08 DSSSD bias & leakage current - attachments 1-2
       CAEN logger program crashed sometime this am - now restarted
Entry  Tue Apr 22 06:44:02 2025, TD, Tuesday 22 April Screenshot_from_2025-04-22_07-40-45.pngScreenshot_from_2025-04-22_07-41-10.pngScreenshot_from_2025-04-22_07-47-25.png1.png2.png

07.40 DSSSD bias & leakage current - attachments 1-3
       CAEN logger program crashed c. 18.00 April 20 - now restarted
Entry  Sun Apr 20 07:30:29 2025, CB, DSSD leakage currents over Easter Screenshot_2025-04-20_083007.pngScreenshot_2025-04-20_193226.pngScreenshot_2025-04-21_085130.png
Just after midnight on 20/04 it appears DSSD #4 leakage current has perfectly stabilised. See attached.

DSSDs remain biased.

 
Entry  Fri Apr 18 16:18:33 2025, JM, D+D BBN energies test 16x
D+D minimum energy Ecm = 150 keV which corresponds to Ed=150 keV/u or Ed=300 keV. Therefore we need a threshold below this.

Test 1 - Current status

Current slow comparator threshold is 0x64 (1 MeV). ADC data items rate in all FEEs is essentially zero with this threshold. (except aida03 and
Entry  Fri Apr 18 08:17:38 2025, JM, More testing 15x
09:10

Arrived at GSI. Leakage currents status same as before, DSSD4 is still fluctuating. DSSD1 and DSSD3 currents are definitely lower again compared
to previous days. I am convinced they are decreasing over time, whether this will be enough for our measurement....
Entry  Thu Apr 17 08:51:29 2025, JM, Grounding cont. 29x
09:00

Came in to see the bias for DSSD4 which has been fluctuating for the past few days had tripped during the night. From the gnuplot it looks like
it was fluctuating all night and just after midnight it went above 20uA and tripped.
Entry  Wed Apr 16 08:20:05 2025, JM, Grounding  14x
09:00

Leakage currents this morning again appear to have lowered during the night. Current plot shows a day/night variation but I think the minimum
is decreasing ever so slightly.
Entry  Tue Apr 15 12:23:10 2025, JM, Leakage current / CARME issues 18x
14/04/25

Arrived at GSI in the afternoon.

Found that the coolant loop on aida08 had popped out which resulted in the high FEE temperatures observed (see attachment 1). Female swagelock
Entry  Thu Apr 10 10:53:14 2025, TD, Thursday 10 April 8x
11.50 DAQ continues
      Data file APR25/R6_13
Entry  Thu Apr 10 07:02:12 2025, CB (remotely), Current logging enabled - sort of 
There appear to be issues with Shahab's caenlogging program. It crashes occasionally, with an error indicating the number of columns in the terminal
is incorrect. We will have to ask Shahab.

For now
Entry  Wed Apr 9 10:02:21 2025, TD, CARME equipment in CRYRING area moved 20250409_102115.jpg20250409_101705.jpg

There was some tidying up of the CRYRING hall in advance of this week's EC evaluation meeting at GSI.
Entry  Wed Apr 9 02:40:04 2025, TD, Wednesday 9 April 11x
03.37 DAQ continues
      Data file APR25/R5_8
Entry  Tue Apr 8 10:46:13 2025, TD, Tuesday 8 April 27x

11.30 CRYRING vacuum and temperature - attachments 1-2
Entry  Mon Apr 7 08:59:41 2025, TD, Monday 7 April 8x

10.00 FEE64 power ON
      CARME IE514 OFF
Entry  Sun Apr 6 14:21:53 2025, TD, [How To] Startup CARME 

- water flow/interlock checks
   check water flow to/from inflow/outflow manifolds
Entry  Sun Apr 6 11:40:48 2025, TD, Options DB reconstructed Screenshot_from_2025-04-06_12-59-39.png
Options directory corrupted unable to change Options settings per https://elog.ph.ed.ac.uk/CARME/664

Move old Options directory to Options.BAK-060425
Entry  Sun Apr 6 10:17:49 2025, TD, Sunday 6 April 15x

11.15 CARME IE514 ion gauge remains OFF
      ML says there are 2x ion gauges with line of sight to the DSSSDs - CARME IE514 (now off) and another controlled by the vacuum group - he will request
Entry  Sat Apr 5 16:15:04 2025, TD, FEE64 power interlock installed 11x

Water flow and dew point sensors have been installed on the outlet and inlet cooling water manifolds respectively.
ELOG V3.1.4-unknown