Thu Apr 17 08:51:29 2025, JM, Grounding cont. 23x
|
09:00
Came in to see the bias for DSSD4 which has been fluctuating for the past few days had tripped during the night. From the gnuplot it looks like
it was fluctuating all night and just after midnight it went above 20uA and tripped. |
Wed Apr 16 08:20:05 2025, JM, Grounding 14x
|
09:00
Leakage currents this morning again appear to have lowered during the night. Current plot shows a day/night variation but I think the minimum
is decreasing ever so slightly. |
Tue Apr 15 12:23:10 2025, JM, Leakage current / CARME issues 18x
|
14/04/25
Arrived at GSI in the afternoon.
Found that the coolant loop on aida08 had popped out which resulted in the high FEE temperatures observed (see attachment 1). Female swagelock |
Thu Apr 10 10:53:14 2025, TD, Thursday 10 April 8x
|
11.50 DAQ continues
Data file APR25/R6_13
|
Thu Apr 10 07:02:12 2025, CB (remotely), Current logging enabled - sort of
|
There appear to be issues with Shahab's caenlogging program. It crashes occasionally, with an error indicating the number of columns in the terminal
is incorrect. We will have to ask Shahab.
For now |
Wed Apr 9 10:02:21 2025, TD, CARME equipment in CRYRING area moved 
|
There was some tidying up of the CRYRING hall in advance of this week's EC evaluation meeting at GSI.
|
Wed Apr 9 02:40:04 2025, TD, Wednesday 9 April 11x
|
03.37 DAQ continues
Data file APR25/R5_8
|
Tue Apr 8 10:46:13 2025, TD, Tuesday 8 April 27x
|
11.30 CRYRING vacuum and temperature - attachments 1-2
|
Mon Apr 7 08:59:41 2025, TD, Monday 7 April 8x
|
10.00 FEE64 power ON
CARME IE514 OFF
|
Sun Apr 6 14:21:53 2025, TD, [How To] Startup CARME
|
- water flow/interlock checks
check water flow to/from inflow/outflow manifolds
|
Sun Apr 6 11:40:48 2025, TD, Options DB reconstructed
|
Options directory corrupted unable to change Options settings per https://elog.ph.ed.ac.uk/CARME/664
Move old Options directory to Options.BAK-060425
|
Sun Apr 6 10:17:49 2025, TD, Sunday 6 April 15x
|
11.15 CARME IE514 ion gauge remains OFF
ML says there are 2x ion gauges with line of sight to the DSSSDs - CARME IE514 (now off) and another controlled by the vacuum group - he will request |
Sat Apr 5 16:15:04 2025, TD, FEE64 power interlock installed 11x
|
Water flow and dew point sensors have been installed on the outlet and inlet cooling water manifolds respectively.
|
Sat Apr 5 16:13:32 2025, TD, Saturday 5 April 7x
|
12.00 CARME IE514 ion gauge 4.2e-11 mbar
CARME IE514 OFF
|
Fri Apr 4 10:17:16 2025, TD, Friday 4 April
|
10.43 Reboot carme-gsi - unable to open a working terminal
|
Mon Mar 10 15:47:27 2025, TD, Analysis data files G22-201 R79_10 & R79_24 
|
Analysis of data files G22-201 R79_10 and R79_24 - attachments 1-2
|
Tue Jul 2 17:43:32 2024, TD, Offline analysis G22-201/R89 9x
|
Offline analysis data file G22-201/R89_0 to R89_13 (c. 6h40m data)
DSSSD#1 & 3 36.54mm -> ~ 2.3-8.6 deg
|
Wed Jun 19 12:11:22 2024, CB, RSS, CARME status
|
DSSD off
FEEs off
Motors out, pin inserted, compressed air closed, power removed from motors box. |
Wed Jun 19 12:08:34 2024, CB + various, Run 101-105
|
Run 101: no target. See ELOG entry by TD.
Run 102: ??
Run 103: ?? |
Wed Jun 19 12:06:50 2024, CB, OF, SS, Run 98/99/100 - higher energy
|
10:21 June 17
New energy: 1.125 MeV/u
Target in. Run 98 started. |