ID |
Date |
Author |
Subject |
Text |
 |
758
|
Wed Jun 18 14:21:39 2025 |
CB | CARME off | 15:20
DAQ stopped
Merger & Tape Server stopped |
|
757
|
Tue Jun 17 23:51:58 2025 |
TD, CB, JG | Run 96 - continued |
00.31 DAQ continues data file G22-205/R96_27
|
23x |
756
|
Tue Jun 17 19:10:07 2025 |
NH, PMH | Run 96 | 20:00 - Go to YR cave to see what is going
on
|
7x |
755
|
Tue Jun 17 12:22:50 2025 |
CB EW JG AG SN | Run 94/95/96 | Run 94
Background with beam at 150 keV
and no target. |
|
754
|
Tue Jun 17 12:14:30 2025 |
EW, CB, AG | Run 93- Background with beam 150keV | Run 93- New run at 150keV, background with
beam
13:15 All checks ok |
   |
753
|
Tue Jun 17 08:04:09 2025 |
EW, AG, CB | Run 92- Background with beam 90keV | Run 92- started at 09:00, background with
beam
Same settings as run 91 |
   |
752
|
Mon Jun 16 22:06:00 2025 |
CB, AR, EW | RUN 90-91 | 23:00 DAQ restored and data now being written
okay. Checks all okay, see screenshots below.
Histograms reset. 40 bars in bottle @ 23:45 |
14x |
751
|
Mon Jun 16 21:58:00 2025 |
CB AR | Runs 84-89 | Found all Merger Links background black
- inactive. Nontheless the tapeservice was
working, the data rate to disk was normal, |
|
750
|
Mon Jun 16 11:12:22 2025 |
JG, AK, AR, EH | run 83 | 12:15 restarted measurement with target
- Run 83
same settings as for runs 76, 77 |
8x |
749
|
Mon Jun 16 10:46:11 2025 |
CB JM JG AK | Run82 | Background without beam while source is
optimised. |
|
748
|
Mon Jun 16 08:17:41 2025 |
JG | D2 consumption | The current bottle of D2 was installed
on friday 06.06. at around 12:00. I assume
we started at 200 bar. |
|
747
|
Sun Jun 15 10:46:35 2025 |
EW, EM, AR, AB, CB, JG, AK | Run 81 | 11:45 New run started - run 81, same settings
as previous runs (75, 76 etc)
ROOT histograms NOT zeroed |
30x |
746
|
Sun Jun 15 07:01:37 2025 |
EW, EM | Run 80 | 08:00 New run started - run 80
Run whilst they are optimising
the beam after losing it, everything else |
    |
745
|
Fri Jun 13 19:41:32 2025 |
JG, SHB, JM, AR, EW, OF | Run 77, 78, 79 | New run started - Run 77 after refilling
LN2 dewar
Same settings as Run 75 & 76 |
17x |
744
|
Fri Jun 13 16:39:18 2025 |
JG, SHB | Run 76 | Same settings as run 75.
Detector 4 is biased at 100V and
switched from MEC to LEC. |
7x |
743
|
Fri Jun 13 14:45:58 2025 |
JG, SS, JM, CB, EW, AR | Run 75 |
90 keV/u beam on target, Target
overlap confirmed with lifetime measurement |
 |
742
|
Thu Jun 12 15:33:17 2025 |
CB, JM, EM, JG, TD, AB, CF, AR | Run 74 | 16:34
Like Run 73, but particle detector
in YR10 now active, and recorded in MBS. |
27x |
741
|
Thu Jun 12 14:22:27 2025 |
JM, CB, TD, CF, JG, EM | Run 73 | 15:00
Cave closed, waiting for beam to
come back. |
   |
740
|
Thu Jun 12 14:08:42 2025 |
JM, CB | Run 72 - pulser walkthrough | Pulser walkthrough conducted while the
cave was open.
Pulser amplitudes 90000, 80000, |
|
739
|
Thu Jun 12 06:20:50 2025 |
JM | Run 68,69 - background | 07:20
Started a background run while
the cave is open. |
 |
|