  290   Sun Feb 27 00:07:15 2022 David, Pierre-MichellNo beam, valve closedAt 00:37 we lost the beam due to a high
pressure burst in the tarjet which resulted
in a valve closed at YR09VV...
  
  289   Sat Feb 26 23:20:13 2022 David, Pierre-MichellUpdate statusIn this last hour we have been playing
with the cryostat temperature as dictated
by Nikos, in order to have the target working
 7x 
  288   Sat Feb 26 22:22:27 2022 David, Pierre-MichellStarting to take dataAt 23:22 we started recording data under
the new conditions.

Merger, Tape server (WS3):
 11x 
  287   Sat Feb 26 04:36:38 2022 RSS TDSaturday 26 February 07:00-15:0005:36 E4 pressure c. 1.7e-9mbar *not* 3e-10mbar
as reported earlier
      See attachments 1 & 2
 27x 
  286   Fri Feb 25 19:20:22 2022 MS, PJWcheck'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
rabbit decoder status'  no changes
 11x 
  285   Fri Feb 25 17:48:22 2022 MS, PJWcheck'Check Clock Status', 'Check
ADC Calibration' and 'Check the White
rabbit decoder status' - no changes
 11x 
  284   Fri Feb 25 16:01:04 2022 MS, PJWcheck        

'Check Clock Status': Clock
status test result: Passed 5, Failed 0
 7x 
  283   Fri Feb 25 15:38:40 2022 JM, CB, PJWRun 55, 56, 59 root histogramsRun55 - detector out, start 22/2/22 13:20,
end 23/2/22 10:49

Run 56 - detector moved in, start
 6x 
  282   Fri Feb 25 11:20:30 2022 CBPressure and temperature data savedSaved pressure reading and temperature
data logs from internal target in /TapeServer/22Feb/OtherData

Leakage current data is saved in
  
  281   Fri Feb 25 09:58:08 2022 GHC, CB, ML, EMCurrent status10:58
Started new run: 77
  
  280   Fri Feb 25 08:14:47 2022 George, EstherCurrent status9:14
Beam intensity around ~7.5e7

Pressures OK
  
  279   Fri Feb 25 06:57:09 2022 George, EstherCurrent status08:00
Beam seems to be back
Intensity ~7.8e7
 2022-02-25_08-03-21leakage.png 
  278   Fri Feb 25 06:28:12 2022 George, EstherCurrent Status07:30
Some signals on the beam monitor,
seems they are optimising it.
 2022-02-25_07-33-44exRate.png2022-02-25_07-35-11xyTotal.png 
  277   Fri Feb 25 05:04:16 2022 Rui-Jiu Chen, AlexcheckStill  no beam in CRING.

Motor fully out position.

SW3
 14x 
  276   Fri Feb 25 03:20:29 2022 Rui-Jiu Chen, AlexCurrent statusGleb Vorobyev tried for few hours to fix
the ion source but without success.

So, there will be no beam in CRYRING
  
  275   Fri Feb 25 03:01:11 2022 Rui-Jiu Chen, AlexcheckStill  no beam in CRING.

Motor fully out position.

SW3
 14x 
  274   Fri Feb 25 01:12:49 2022 Rui-Jiu Chen, Alex Check Still  no beam in CRING.

Motor fully out position.

SW3
 13x 
  273   Fri Feb 25 00:00:40 2022 Rui-Jiu Chen, AlexCheckThere are some problems with ion source. 
No beam in CRYING.

Motor fully out position.
 14x 
  272   Thu Feb 24 23:15:25 2022 Rui-Jiu Chen, AlexProblems with ion souce.    
  271   Thu Feb 24 22:45:08 2022 Jordan, George, Rui-Jiu Chencheck- Motor fully out position.

SW3

- Merger OK