ID |
Date |
Author |
Subject |
Text |
 |
|
390
|
Thu Apr 27 19:43:23 2023 |
CB, JM | Preparing to open | Removed turbo pump and set aside in a box.
Considering switching to the other turbo
to avoid degradation due to lack of use. |
 |
|
389
|
Wed Apr 26 16:49:28 2023 |
CB, JM | CARME dolly mostly built | Disconnected cables from CARME motors and
turbo. The turbo has to go to allow Carme
to slide out. Crane may be required to lift |
  |
|
388
|
Tue Apr 25 13:22:19 2023 |
JM | CARME venting | CARME venting using nitrogen gas bottle.
Coolant pipes dismounted from the
chamber |
 |
|
387
|
Mon Apr 24 21:24:26 2023 |
JM | Preparation for CARME dismount | CARME currently in vacuum, pressure ~3E-10
mbar. Chamber to be vented tomorrow afternoon
by vacuum division. We have active both pirani |
  |
|
386
|
Wed Mar 22 16:33:32 2023 |
TD | NIM WR source |
Test of NIM WR source at Edinburgh
|
8x |
|
385
|
Wed Jan 18 13:32:36 2023 |
PJCS | MACB settings with either Emulator or VETAR | When using the VITAR connected
to the HDMI port of the root MACB the settings
for all the MACB in the system 0x3. |
   |
|
384
|
Thu Dec 8 14:41:19 2022 |
PJCS | Results of tests on AIDA PSU in DL T9 | We opened one up and soldered a co-ax cable
to one of the +6v power contacts at the output
of the filter board. |
8x |
|
383
|
Thu Dec 1 08:56:59 2022 |
AR TD | Thursday 1 December | Photos of noise observed at each of the
AIDA PSU outputs by digital oscillscope.
DAQ GOing with waveforms enabled. |
11x |
|
382
|
Wed Nov 30 08:52:59 2022 |
AR TD | Wednesday 30 November | 9:40
DSSD bias and leakage current values:
-99.99 V |
26x |
|
381
|
Tue Nov 29 14:37:56 2022 |
AR TD | Tuesday 29 November | 16:20
DSSD bias and leakage current values:
-99.99 V |
22x |
|
380
|
Mon Nov 28 13:14:33 2022 |
AR TD | Monday 28 November | |
12x |
|
379
|
Mon Oct 3 16:03:33 2022 |
OH, CB | TTT14 Photos | Photos of the new TTT14 DSSD delivered to
GSI.
Photos of detectors are broken up by photos |
|
|
378
|
Sun Aug 14 06:50:58 2022 |
TD, JM | Sunday 14 August |
07.51 DAQ continues files 22Feb/R97
|
10x |
|
377
|
Sat Aug 13 10:23:59 2022 |
JM, TD | Noise tests pt3 and pulser walk | Waveforms and discriminator ON. Pulser
re-connected to all fees via daisy chain.
V=100v, I=8.36uA |
15x |
|
376
|
Fri Aug 12 15:12:37 2022 |
JM, TD | CARME measurements | measurement 1 -string
intermediate (smaller) chamber - 2144
(mm) circumference, measured half circumference |
9x |
|
375
|
Fri Aug 12 09:06:57 2022 |
TD, JM | Noise tests pt2 |
10.07 DSSSD bias -100V leakage current -8.65uA
|
30x |
|
374
|
Thu Aug 11 09:25:13 2022 |
JM, TD | Noise tests |
Moved pneumatic motor in and out several
revolutions |
14x |
|
373
|
Wed Aug 10 10:33:03 2022 |
TD, ML, JM, NP | Meeting at YR09 to discuss options for CARME operations to February 2022 |
Initial discussions of proposals to provide
open CARME chamber and provide access to |
   |
|
372
|
Wed Aug 10 10:30:04 2022 |
TD, JM | Wednesday 10 August |
09.45 Found CARME electrical power off
|
   |
|
371
|
Tue Aug 9 16:07:33 2022 |
JM, TD | Anydesk setup command line | To log into appc218 desktop:
same login and password as to carme@atppc022.gsi.de
To start anydesk |
|