AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 8 of 29  ELOG logo
ID Date Author Subject Text Attachments
  429   Wed Jul 26 08:28:09 2023 RSSBuilding tent
09:26  IE514 1.96e-08mbar
 IMG_9897.jpgIMG_9899.jpgIMG_9901.jpgIMG_9902.jpg 
  428   Tue Jul 25 09:12:15 2023 RSSBuilding tent
10:10  IE514 2.0e-08mbar

Upstream
part of the CARME is covered.
 BD01C0C8-5181-49B8-8751-AD4C99A459CC.jpeg7B3836F1-8A7E-491B-AFDC-46033BF84760.jpeg 
  427   Mon Jul 24 10:40:14 2023 RSS, TDPump down continues11.40 Pirani 1.00e-3 mbar IE514 2.23e-08mbar

15.15 7d/24h vacuum plots
 vacplot.pngvacplot24.png 
  426   Sun Jul 23 10:13:48 2023 RSS, TDBuilding tent11.15 Pirani 1.0e-03mbar IE514 2.72e-08mbar

16.35 Pirani 1.0e-03mbar IE514 2.61e-08mbar
 DBE0DA2E-2F69-469C-B645-3E33E3D82138.jpeg857185AC-3571-41E9-88AE-9F624445135B.jpegE69ED1D1-444E-478A-A3B4-481023B4024D.jpeg610048A3-25F5-459C-9EF1-83EFEFDE51C9.jpeg 
  425   Sat Jul 22 09:19:59 2023 RSS, TDThermocouples connected10.20 Pirani 1e-03mbar IE514 3.26e-08mbar

 10x 
  424   Fri Jul 21 08:21:54 2023 TD, RSSBaking tent manual09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar

      Today - install TCs, connect to Pico
 CARME-baking-guide_(1).pdf 
  423   Thu Jul 20 08:29:26 2023 TDInstalling tent. Two NEG power cable broken.09.28 Pirani 1.00e-3 mbar IE514 5.45e-8 mbar

12.10 Bakeout tent frame installed
 11x 
  422   Wed Jul 19 08:17:26 2023 TDLeak testing09.16 Pirani 1.00e-3 mbar IE514 8.77e-8 mbar
      Leak tester c. 5e-12 mbar.l/s (leak
tester valved off)
  
  421   Tue Jul 18 08:16:28 2023 TDPumping down. Issues found with one detector.09.15 Following overnight pumping of CARME
chamber by Leybold turbo
      Pirani 1.00e-3 mbar IE514 2.83e-7 mbar
  
  420   Mon Jul 17 08:45:11 2023 TDClosing CARME again
Grosmantage are scheduled to arrive 10.00
to inspect COF600 seals and their fit to
 20230717_093106.jpg 
  419   Fri Jul 14 08:27:17 2023 TDCARME open - inspecting seal
09.20 CARME chamber at atmospheric pressure
as expected.
  
  418   Thu Jul 13 08:46:44 2023 TDReplacing wire seal
09.30 CARME chamber status
 20230713_135351.jpg20230713_135416.jpg 
  417   Thu Jul 13 00:12:45 2023 JM, CBCARME closedThe CARME chamber was closed and pushed
back into position on the ring. 

Prior to moving back onto the ring,
 Bias110723.pngfullyin.jpgfullyin-measured.jpg 
  416   Thu Jul 13 00:12:19 2023 JM, CBBellow replacedThe left (inside ring) bellow for the motors
rod was replaced.

Replacing the bellow involved;
 20230705_164523.jpg 
  415   Thu Jul 6 15:26:39 2023 JMLeak updateThe leak on the actuator arm bellows has
been attempted to be sealed using UHV vacuum
seal spray. The spray had the opposite to
 pumping.png 
  414   Wed Jul 5 19:27:13 2023 JMPump down and leak testCARME and the interaction chamber have
been pumping for ~26 hours, P=4.15e-7 mbar,
attached figures show the current pump down
 pumping_1.pngpumping-zoom.pngsignal-2023-07-05-15-13-30-512.jpg 
  413   Tue Jul 4 17:08:08 2023 JMLeak test and ventingThis morning the pressure achieved was
1.44E-7 mbar. Leak testing showed an overall
leak rate of 1.5E-10 mbar l/s, this is below
 20230704_135455.jpg20230704_174524.jpg 
  412   Mon Jun 26 14:49:05 2023 JM, TDCARME vented26/06/23

This morning the pressure was 4e-7
mbar. The bolts on the windows and the large
  
  411   Sun Jun 25 14:30:06 2023 JM, TDMotors bias testThe motors were moved using the pneumatic
only, in and out for several cycles to gauge
the effect on the vacuum. For the left arm
  
  410   Sun Jun 25 10:08:30 2023 JM, TDPump-down 23/06/23

Pumpdown started with the scroll
pump 17:15 . The turbo-pump was started 17:55.
 Figure_1.png20230625_120640.jpg20230625_120648.jpgpump-down.png 
ELOG V3.1.4-unknown