AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 1 of 34  ELOG logo
  ID Date Author Subject Text Attachments
  670   Wed Apr 9 10:02:21 2025 TDCARME equipment in CRYRING area moved
There was some tidying up of the CRYRING
hall in advance of this week's EC evaluation
 20250409_102115.jpg20250409_101705.jpg 
  669   Wed Apr 9 02:40:04 2025 TDWednesday 9 April03.37 DAQ continues
      Data file APR25/R5_8
 11x 
  668   Tue Apr 8 10:46:13 2025 TDTuesday 8 April
11.30 CRYRING vacuum and temperature - attachments
1-2
 27x 
  667   Mon Apr 7 08:59:41 2025 TDMonday 7 April
10.00 FEE64 power ON
      CARME IE514 OFF
 8x 
  666   Sun Apr 6 14:21:53 2025 TD[How To] Startup CARME
- water flow/interlock checks
   check water flow to/from inflow/outflow
  
  665   Sun Apr 6 11:40:48 2025 TDOptions DB reconstructedOptions directory corrupted unable to change
Options settings per https://elog.ph.ed.ac.uk/CARME/664
 Screenshot_from_2025-04-06_12-59-39.png 
  664   Sun Apr 6 10:17:49 2025 TDSunday 6 April
11.15 CARME IE514 ion gauge remains OFF
      ML says there are 2x ion gauges with
 15x 
  663   Sat Apr 5 16:15:04 2025 TDFEE64 power interlock installed
Water flow and dew point sensors have been
installed on the outlet and inlet cooling
 11x 
  662   Sat Apr 5 16:13:32 2025 TDSaturday 5 April
12.00 CARME IE514 ion gauge 4.2e-11 mbar
      CARME IE514 OFF
 7x 
  661   Fri Apr 4 10:17:16 2025 TDFriday 4 April
10.43 Reboot carme-gsi - unable to open a
working terminal
  
  660   Mon Mar 10 15:47:27 2025 TDAnalysis data files G22-201 R79_10 & R79_24
Analysis of data files G22-201 R79_10 and
R79_24 - attachments 1-2
 R79_10.txtR79_24.txt 
  659   Tue Jul 2 17:43:32 2024 TDOffline analysis G22-201/R89Offline analysis data file G22-201/R89_0 to
R89_13 (c. 6h40m data)
 9x 
  658   Wed Jun 19 12:11:22 2024 CB, RSSCARME statusDSSD off

FEEs off

Motors out, pin inserted, compressed
  
  657   Wed Jun 19 12:08:34 2024 CB + variousRun 101-105Run 101: no target. See ELOG entry by TD.

Run 102: ??

Run 103: ??
  
  656   Wed Jun 19 12:06:50 2024 CB, OF, SSRun 98/99/100 - higher energy10:21 June 17

New energy: 1.125 MeV/u

Target in. Run 98 started.
  
  655   Wed Jun 19 12:04:02 2024 CB + OF, SSRun 96/97Run 96 - as run 89, while we wait for beam
energy change at higher energies

Run stopped around 08:56
  
  654   Wed Jun 19 12:01:29 2024 TD23:00-07:00 Wednesday 19 June23.18 DSSSD bias & leakage current OK - attachment
1
      FEE64 temps OK - attachment 2
 23x 
  653   Wed Jun 19 12:00:56 2024 CBRun 93/94/95 - background04:00 17 June

Moved the detectors back to the
usual configuration (as per run 89).
 6x 
  652   Wed Jun 19 11:54:26 2024 CBRun 91/92 - moving detectors~ 2:00 17 June

 

Run 91
 Screenshot_from_2024-06-18_03-07-50.pngScreenshot_from_2024-06-18_03-53-51.pngScreenshot_from_2024-06-18_04-20-15.pngScreenshot_from_2024-06-18_04-20-18.pngScreenshot_from_2024-06-18_04-20-21.png 
  651   Mon Jun 17 23:10:08 2024 CBRun 9000:10

As run 89, detectors moved fully
out.
 Screenshot_from_2024-06-18_01-21-47.pngScreenshot_from_2024-06-18_01-21-55.png 
ELOG V3.1.4-unknown