672
|
Thu Apr 10 10:53:14 2025 |
TD | Thursday 10 April | 11.50 DAQ continues
Data file APR25/R6_13
|
8x |
|
671
|
Thu Apr 10 07:02:12 2025 |
CB (remotely) | Current logging enabled - sort of | There appear to be issues with Shahab's
caenlogging program. It crashes occasionally,
with an error indicating the number of columns |
|
|
670
|
Wed Apr 9 10:02:21 2025 |
TD | CARME equipment in CRYRING area moved |
There was some tidying up of the CRYRING
hall in advance of this week's EC evaluation |
 |
|
669
|
Wed Apr 9 02:40:04 2025 |
TD | Wednesday 9 April | 03.37 DAQ continues
Data file APR25/R5_8
|
11x |
|
668
|
Tue Apr 8 10:46:13 2025 |
TD | Tuesday 8 April |
11.30 CRYRING vacuum and temperature - attachments
1-2
|
27x |
|
667
|
Mon Apr 7 08:59:41 2025 |
TD | Monday 7 April |
10.00 FEE64 power ON
CARME IE514 OFF
|
8x |
|
666
|
Sun Apr 6 14:21:53 2025 |
TD | [How To] Startup CARME |
- water flow/interlock checks
check water flow to/from inflow/outflow |
|
|
665
|
Sun Apr 6 11:40:48 2025 |
TD | Options DB reconstructed | Options directory corrupted unable to change
Options settings per https://elog.ph.ed.ac.uk/CARME/664
|
|
|
664
|
Sun Apr 6 10:17:49 2025 |
TD | Sunday 6 April |
11.15 CARME IE514 ion gauge remains OFF
ML says there are 2x ion gauges with |
15x |
|
663
|
Sat Apr 5 16:15:04 2025 |
TD | FEE64 power interlock installed |
Water flow and dew point sensors have been
installed on the outlet and inlet cooling |
11x |
|
662
|
Sat Apr 5 16:13:32 2025 |
TD | Saturday 5 April |
12.00 CARME IE514 ion gauge 4.2e-11 mbar
CARME IE514 OFF
|
7x |
|
661
|
Fri Apr 4 10:17:16 2025 |
TD | Friday 4 April |
10.43 Reboot carme-gsi - unable to open a
working terminal
|
|
|
660
|
Mon Mar 10 15:47:27 2025 |
TD | Analysis data files G22-201 R79_10 & R79_24 |
Analysis of data files G22-201 R79_10 and
R79_24 - attachments 1-2
|
 |
|
659
|
Tue Jul 2 17:43:32 2024 |
TD | Offline analysis G22-201/R89 | Offline analysis data file G22-201/R89_0 to
R89_13 (c. 6h40m data)
|
9x |
|
658
|
Wed Jun 19 12:11:22 2024 |
CB, RSS | CARME status | DSSD off
FEEs off
Motors out, pin inserted, compressed |
|
|
657
|
Wed Jun 19 12:08:34 2024 |
CB + various | Run 101-105 | Run 101: no target. See ELOG entry by TD.
Run 102: ??
Run 103: ?? |
|
|
656
|
Wed Jun 19 12:06:50 2024 |
CB, OF, SS | Run 98/99/100 - higher energy | 10:21 June 17
New energy: 1.125 MeV/u
Target in. Run 98 started. |
|
|
655
|
Wed Jun 19 12:04:02 2024 |
CB + OF, SS | Run 96/97 | Run 96 - as run 89, while we wait for beam
energy change at higher energies
Run stopped around 08:56 |
|
|
654
|
Wed Jun 19 12:01:29 2024 |
TD | 23:00-07:00 Wednesday 19 June | 23.18 DSSSD bias & leakage current OK - attachment
1
FEE64 temps OK - attachment 2
|
23x |
|
653
|
Wed Jun 19 12:00:56 2024 |
CB | Run 93/94/95 - background | 04:00 17 June
Moved the detectors back to the
usual configuration (as per run 89). |
6x |